See where the work is moving.
Filter the national register, choose a market, and open its jobs, training routes, or delivery network.
Choose the work. Build the route in.
Compare pay, time, cost and qualifications—then move from a real training route to a current opening.
Build the campus. Run the campus. Move between both.
Start with the work you want—not a list of credentials. Every route shows the shortest credible entry, the longer craft path, and current evidence.
Electrician
You want the broadest craft route across construction, commissioning and long-term operations.
National BLS occupation percentiles are used as a rough experience proxy: early career tracks the lower market, established tracks the middle, and senior tracks the upper market. It is not a promise tied to exact years. Shift premiums, overtime, union scale, security clearance and local licensing can materially change pay.
Algebra refresh, driver requirements and apprenticeship application
2–6 weeks
$0–$300About 2,000 OJT hours/year plus classroom instruction
4–5 years
Paid trainingIndependent work subject to state and local rules
State dependent
$50–$500+01Electrical theory, math and the National Electrical Code
02Blueprints, one-lines and panel schedules
03Raceway, cable, grounding and terminations
04Lockout/tagout, testing and energized-work boundaries
01Bend and install raceway to a drawing
02Terminate conductors under supervision
03Trace a one-line from utility to rack PDU
04Use a meter safely and document readings
Review dates, eligibility and the published $3,698 course cost before registering.
View cohortsLocal · Employer academyAmerica's Workforce AcademyMeta + CBRE + Associated Builders and Contractors · 4-week intensiveApply for a pathway; accepted candidates receive tuition, travel, lodging and a conditional partner job after completion.
Apply to the academyNational · Apprenticeship.govFind a registered program4–5 years · Paid from day oneSearch electrician, inside wireman or electrical apprentice; verify state licensing before enrolling.
Open official routeHigh-confidence national pathway. Licensing, union scale, overtime and apprentice wage steps are local and must be checked with the sponsor.
Search the complete official register.
Owner, contractor, trade, utility and operating roles stay together here. Exact-project, regional and unresolved matches remain labeled.
Craft Skilled Laborer · Rayville Data Center
Rayville, LA
Structured Cabling Laborer · Logistics Support
Rayville, LA
Civil Craft Surveyor
Rayville, LA
Structured Cabling Installer
Rayville, LA
Power Ironworker
Rayville, LA
Structured Cabling General Foreman
Rayville, LA
Every claim has a trail.
Open the company list, forecast method, job-board coverage, research channels, and source register.
Projects, employers, openings, training routes, and sources stay linked and auditable.
01Company network249 owners, builders, trades, suppliers + operatorsOpen
02Forecast methodHow phase becomes a role-demand band without fake precisionOpen
Normalize every project to a six-stage lifecycle.
Map each role family to the phases where it concentrates.
Rank now / next / later from sourced project status.
Keep public claims, modeled demand, and live vacancies separate.
Reported workers after year one → peak construction forecast.
Construction contributors → current full-time onsite workforce.
03Job-board coverage48 monitored · 166 partial · 35 queuedOpen
Eighteen current Sparks-capable construction, engineering, quality, security, commissioning and cost records are normalized. PR-coded roles remain qualified to 2300 Peru, SV is unresolved to the similarly named state applicant, and every posting without a street address remains regional.
18normalizedOfficial employer route verified. No current exact-address North Las Vegas or 3399 Peru Drive requisition is normalized in this cut.
0normalizedSix current owner-controlled Las Vegas roles are normalized across field, network, support and commercial work. None names Fremont, DC2 or a street address, so every role remains a two-facility regional match.
6normalizedOfficial parent-platform employer route verified. No current requisition is assigned to PowerHouse Reno; owner delivery schedules are not vacancy counts.
0normalizedOfficial employer route verified. The wider industrial campus has many functions, so no role is normalized as data-center work without exact facilities, critical-power, controls or IT scope.
0normalizedCurrent page advertises six Northern Nevada role families, including laborers, operators, drivers, foremen and project managers. The page does not expose stable requisition IDs or assign an opening to Peru Shelf, so none is counted as a project vacancy.
0normalizedTract names Westex on Peru Shelf, but no stable employer-controlled requisition inventory was resolved. Third-party indexed roles are not normalized without a current official job detail.
0normalizedThe legal applicant group exposes no separate job board. Monitor permits, deeds and Fleet disclosures without duplicating Fleet openings.
0normalizedNo operator or public employer board is resolved for 2200 Peru Drive. Watch later permits, deeds, entity assignments and contractor awards.
0normalizedSeven legal applicant affiliates expose no verified careers route. Monitor entity, deed, permit, utility and operator records before assigning jobs.
0normalizedThe applicant exposes no separate employer board. Fleet's SV-coded Sparks roles remain qualified regional leads until legal and worksite relationships are documented.
0normalizedTwo live Reno operations records are normalized across both owner-marketed facilities. A swing-shift role still present in search indexing was absent from the live board and was excluded.
2normalizedOfficial filtered inventory showed 46 data-center roles and four that include Lockhart. Three are exact-Lockhart records and one lists Lockhart with Temple. TCEQ independently verifies Sundt as AUS01's construction operator; refresh daily and verify the assigned worksite before applying.
4normalizedThe live owner page showed 59 total positions, seven normalized Lockhart records and two current exact-Avondale construction records. Older cached Avondale roles absent from the live board were excluded; refresh daily because the Prime frontend and Rippling details can lag one another.
9normalizedOfficial builder board exposed 107 company-wide records. No current exact-Avondale requisition was normalized, so general mission-critical and traveling roles are not assigned to PHX01.
0normalizedLockhart Property is the legal owner/operator but exposes no separate employer board. Prime's seven Lockhart records are normalized once under Prime; county, TDLR and register changes are watched here without duplicating vacancies.
0normalizedPaile is the registered occupant and no separate public careers route is asserted. Monitor the state record and controlling first-party disclosures before resolving a wider identity or assigning jobs.
0normalizedOfficial owner route verified. No current posting observed names Caldwell Valley, Buckeye, Peru Shelf, South Valley, Virginia Highlands, Sapphire, Storey County or Silver Springs; older resource pages are excluded from live project hiring.
0normalizedThe agreement entity exposes no separate public job board. Watch Tract's official route, county plats and permits, contractor awards and entity changes without duplicating or inventing vacancies.
0normalizedOfficial owner route verified. One employer-attributed remote commissioning-manager listing that prefers greater-Austin candidates is normalized as regional; no current role names Maxwell or the completed Mesa facility, and the careers module needs daily re-enumeration.
1normalizedLegal owner/operator and agreement entity has no separate public hiring board. Monitor Edged careers, county permits / inspections, annual incentive certifications and the Texas register without duplicating owner vacancies.
0normalizedPhase-two legal developer exposes no separate employer board. Watch floodplain, grading, vertical-permit, assignment and contractor records; hiring is not inferred from the entity name.
0normalizedThe statutory notice names CDE Acquisitions as property owner, but the 2026 appraisal roll returns Capital Land Investments on the matching parcel and exact-name 2026-roll searches did not resolve CDE. The roll trails recordings and is not a title report; monitor county-clerk deeds, assignments, permits and the Texas legal-role register without duplicating Edged jobs.
0normalizedThe 2026 roll and indexed 2020 deed corroborate Capital Land on property 11780, while TDLR names it building owner. The appraisal roll was processing ownership changes only through April 29, 2026 and is not legal title; monitor county-clerk deeds, assignments, permits and inspections, and do not substitute Edged openings as this entity's jobs.
0normalizedOne current official fully remote Project Architect – Data Centers role is normalized as a regional supplier lead. TDLR verifies MG2 at Maxwell, but the posting does not name Edged or the campus.
1normalizedOfficial Texas transmission, engineering, project-management and operations board verified. No reviewed requisition names Caldwell Valley, the Tract LCRA access drive or Edged Maxwell; agreement language contemplates future utility service but does not assign LCRA work.
0normalizedOfficial field, trades, safety, engineering and project-management board verified. Pipeline proximity is not a Caldwell Valley package; no opening is project-assigned.
0normalizedOfficial Texas-filterable route verified for the site-plan consultant. No current posting names Caldwell Valley, so no planning role is assigned to the project.
0normalizedOfficial utility careers route and year-round apprentice pool verified. No current requisition is assigned to either the Prime or Caldwell Valley onsite-substation program; worksite and project linkage must be confirmed on the employer record.
0normalizedOfficial group careers route verified. No stable public posting in this cut names Coravel, Hicks Field or the Fort Worth campus; subsidiary boards require separate monitoring.
0normalizedNo separate Vanguard US ServiceCo public careers board is exposed. Monitor ACS, Coravel, Turner and the state legal-role record without inventing an employer route.
0normalizedOfficial parent careers route verified. No Fort Worth or Coravel-assigned role is normalized in this review.
0normalizedOfficial board verified. The Texas register resolves Lambda to LBB-01, but no current requisition reviewed names Abernathy or LBB-01, so no vacancy is assigned to Caprock.
0normalizedRyan is verified on Caprock, Florence Tech Park and Southwest Crossing. No stable exact-Abernathy, Florence or Eloy requisition is normalized in this cut; keep the named customer, worksite and project confirmation in the application path.
0normalizedOfficial consultant careers route verified. The Florence filings establish CVL's entitlement and civil-planning role, but no current opening is assigned to a Dobson Farms parcel without a named project or worksite.
0normalizedThe legal land entity exposes no separate public hiring system. Monitor deeds, implementing zoning, site plans, permits and EdgeCore disclosures without duplicating EdgeCore or consultant roles.
0normalizedThe legal land entity exposes no separate public careers board. Watch deeds, PUD or zoning cases, site plans, permits and operator disclosures before assigning any vacancy.
0normalizedThe legal property owner exposes no separate public careers system. Monitor the signed ordinance, deeds, site plans, permits and Ryan disclosures without duplicating developer openings.
0normalizedOne current Phoenix-eligible data-center architecture role is normalized as regional demand. Filed civil-engineering relationships to Project Midway and Southwest Crossing do not establish that the requisition serves either project.
1normalizedOfficial construction, residential and corporate career areas verified. No current requisition was assigned to Project Midway; inspect the live employer feed by Arizona location and project reference before normalizing a role.
0normalizedFirm route and municipal applicant relationship are verified. No stable public requisition system or Southwest Crossing-specific opening is exposed; legal representation is not construction employment.
0normalizedFS AB is the legal owner/operator of record and does not expose a separate public hiring system. Hiring routes through Fluidstack; watch registration, ownership, permit and inspection changes without inventing an entity job board.
0normalizedThe live structured feed exposed two sole-location Abernathy operating roles. Older indexed multi-location snippets were excluded because the current feed is the controlling availability source.
2normalizedOfficial board verified. Anthropic is the registered occupant, but no reviewed requisition identifies Abernathy, FS AB or the 168 MW campus; do not assign corporate infrastructure roles by inference.
0normalizedTeraWulf's historical development and construction-management relationship is filed, but it sold its full Abernathy interest in July 2026. No opening is treated as current campus demand after that exit.
0normalizedOfficial contractor careers route verified. No stable current Conyers or ATL2 requisition detail was exposed in this cut, so no opening is normalized or assigned to Atlanta East.
0normalizedOfficial board exposes Georgia geotechnical, materials-testing and inspection work. Exact ATL2-A assignment is not stated, so no opening is normalized to the project.
0normalizedOfficial company and internship route verified. No current stable Conyers or ATL2-A requisition was exposed in this cut.
0normalizedForty-seven Georgia records were visible on the official state board. None names ATL2, ATL3 Pippin or DC BLOX, so the route remains regional and unnormalized.
0normalizedOfficial civil/site and water-resources board verified. No posting identifies the ATL2 or ATL3 worksite, so no opening is assigned to either project.
0normalizedOfficial feed exposes five current Atlanta corporate openings and no Nashville requisition. Continue daily monitoring while Grassmere remains contested and preconstruction.
0normalizedCompany profile publishes careers@bcei.com. No stable requisition detail or Montgomery-specific role is exposed; the MGM1 contractor relationship remains qualified pending a company-named permit or owner disclosure.
0normalizedOfficial company route verified for the MGM1 electrical contractor. Stable open-position detail pages were not exposed in this evidence cut.
0normalizedNo official company careers route is disclosed. Watch county building permits, business-license records and applicant updates before assigning vacancies.
0normalizedNo stable public employer board was located. Entity role is limited to the county narrative until a direct corporate disclosure clarifies ownership and hiring.
0normalizedNo official project requisition system was exposed. Monitor filed plan revisions, entity records and contractor awards.
0normalizedOfficial owner board verified for Port Washington, Shackelford, Goodyear and Reno NV1 monitoring. Exact Reno matching remains to be enumerated; no requisition is campus-assigned without a location and worksite signal.
0normalizedVantage verifies Gurtz as a Lighthouse hiring partner, but no stable public requisition system was exposed in this cut.
0normalizedOne current exact-city Port Washington commercial drywall opening normalized as regional because the detail does not name Lighthouse.
1normalizedOfficial contractor board verified; exact Port Washington matching is pending.
0normalizedOfficial builder board verified; exact Port Washington and Goodyear matching is pending, and the Vantage phase-two relationship does not assign general Arizona roles.
0normalizedApplicant page and county register were checked. No official careers or subcontractor intake exists; monitor signed disposition, permits and filings for the end user and construction team before assigning jobs.
0normalizedOfficial portfolio and Cameron Grogan relationship verified against the county record. No careers board, subcontractor intake or Azalea delivery roster is exposed.
0normalizedThree live employer-controlled openings normalized. Every role remains regional because no posting names Project Azalea, parcel 00710034 or a Thomson worksite.
3normalizedFifteen live Tucker headquarters roles observed across transmission planning, substation, relay, land, fiber, reliability and support functions. The DRI establishes study participation only, so none is normalized to Azalea.
0normalizedOfficial statewide careers route verified. Upgrade-study participation does not establish an Azalea package or vacancy; normalize only a future posting with relevant geography and employer-controlled detail.
0normalizedOfficial rendered listings normalized for Abilene, Childress and Haskell.
17normalizedSix exact Abilene records, ten Mount Pleasant records and one Atlanta-metro role are normalized. Official Goodyear and El Mirage searches produced no exact current result; mirrors are excluded.
17normalizedOfficial construction board verified for the contractor named on three FTY01 building permits. No current stable requisition in this cut names 1601 North River Road or Microsoft Douglasville.
0normalizedOfficial openings and company-wide low-voltage, safety and BICSI training verified. No stable current record is normalized to FTY01 or 1601 North River Road.
0normalizedOfficial current-parent route verified for permit-named Morrison Hershfield. No requisition is assigned to FTY01 without a named worksite or package.
0normalizedOfficial construction board verified for the contractor on ATL-01 alteration J23-0594. No current stable requisition names ATL-01 or 1551 North River Road.
0normalizedOfficial mission-critical, field, trade and professional board verified for the contractor on two Douglasville 1 alterations. No current stable requisition names 1700 North River Road.
0normalizedTwenty-one official records are normalized across ATL-01 and the Phoenix portfolio, including four current Phoenix-market roles eligible for PHX-04 / PHX-06. One duplicate customer-program result remains excluded; multi-site placement is never guaranteed.
21normalizedOfficial company careers route verified. Georgia structured-cabling and service roles remain regional because no employer detail page in this cut names ATL-01 or 1551 North River Road.
0normalizedOfficial craft, early-career and professional board verified for the ATL 088 general contractor. No current stable posting in this cut names 2341 Echo Road, so no JE Dunn role is assigned to the project.
0normalizedOfficial employer board verified for ATL 088's electrical contractor. Georgia construction and field openings remain to be normalized and require a named worksite before project assignment.
0normalizedNo official company careers route, operator or builder is disclosed. Monitor adopted minutes, appeals, refilings, entity records and permits before assigning an opening or modeling labor demand.
0normalizedOfficial employer route verified. No stable current requisition names Goodyear, Winston, ATLA or either exact worksite, so no opening is assigned.
0normalizedThree official unexpired Mount Pleasant data-center records normalized; already-expired requisitions were excluded.
3normalizedSix stable exact-Abilene data-center records normalized across materials, emergency medicine, quality and fiber. More list-only Abilene results remain discoverable; no posting names Frontier, so every role is a qualified regional match.
6normalizedLegal-entity and occupant watch only. These LLCs do not expose separate job boards; hiring routes through Vantage, Oracle and verified delivery firms.
0normalizedOfficial Data Center board verified; no exact Richland, Lebanon, El Paso, Cheyenne, Montgomery or Mesa result is normalized in this cut.
0normalizedLive records normalized across tracked AWS markets, including seven Lithia Springs / Douglasville controls, operations, network-delivery and paid work-based-learning records. Every Georgia record remains regional because no requisition names ATL 088, 2341 Echo Road, ATL068 / ATL078 or 7800 W Strickland; shared multi-market records are not duplicated.
81normalizedOfficial digital-infrastructure capability is verified, but no public jobs board or W Strickland project page is exposed. Monitor the company site and local records without treating the reported seller as the current builder or employer.
0normalizedThree current mission-critical postings identify Jackson as the project location across field supervision and quality; all remain regional because the customer and exact Clinton worksite are not named.
3normalizedOfficial developer board verified; no Falls Township or Pennsylvania-specific role is normalized in this evidence cut.
0normalizedOfficial careers route verified for Susquehanna and power-infrastructure work; stable same-day Berwick requisition URLs remain to be normalized.
0normalizedOne Lithia Springs, seven Cedar Rapids, ten Monrovia, nine Haskell, one Fort Wayne and four Michigan City-capable roles normalized; two Cedar search spillovers were excluded. No current record is assigned to Henderson, Storey County, Hicks Field or Fort Worth.
32normalizedThree current exact-city Michigan City data center logistics roles normalized across associate, team lead and supervisor levels; the customer remains undisclosed.
3normalizedOfficial owner board verified; no current reviewed detail names Cedar Rapids, Avondale or Phoenix 3 Glendale, so no QTS opening is campus-assigned in this snapshot.
0normalizedFour current official Cedar Rapids data center leadership and project-delivery detail pages normalized; the location board exposes additional roles for later ingestion.
4normalizedOfficial builder route verified for Cedar Rapids, Goodyear and Phoenix 3 monitoring. Historical or reported participation does not establish a current Glendale package or vacancy without exact requisition and permit evidence.
0normalizedOne current official Cedar Rapids-capable grid-protection role normalized as regional because the QTS campus assignment is not stated.
1normalizedOfficial developer page lists construction and asset-management openings, but none identifies Cedar Rapids, Montgomery, Aiken, Graniteville or either CLOP project.
0normalizedOfficial Montgomery-based employer board and Mission Critical career path verified. No stable posting in this cut names Oppidan, CLOP or 6220 Perimeter Parkway.
0normalizedFour current Alabama intakes normalized across apprentice, electrician, foreperson and project engineer. Each remains regional because the employer board does not name the CLOP project.
4normalizedThree current statewide plumbing intakes normalized. The verified CLOP contractor relationship does not establish project assignment for an applicant.
3normalizedOfficial mechanical-contractor openings and general application route verified. Individual requisitions remain to be normalized and none is assigned to the CLOP site.
0normalizedCurrent Abilene-or-Savannah commissioning role and Ohio data-center community-engagement role normalized as regional; broader Stargate role matching remains in progress.
2normalizedFour distinct current exact-market Shackelford construction-management requisitions remain live; national data center and Catalyst pathways stay available for broader monitoring.
4normalizedAll 16 current Santa Teresa-capable Workday records are normalized for Project Jupiter. No current record in this cut names Lithia Springs, ATL02, Avondale or PHX01, so none is cross-linked to either Georgia or Arizona.
16normalizedNo public employer identity or requisition board resolved. Monitor zoning disposition, deeds, site plans and affiliate records before treating SAC III as an operating employer.
0normalizedOfficial consultant board verified; no current record is assigned to ATL02 or 808 Factory Shoals Road.
0normalizedOfficial consultant board verified; no current opening names ATL02 or the Lithia Springs worksite.
0normalizedOfficial operator careers route verified. The linked opening system still requires full enumeration; no exact ATL1 or Lithia Springs vacancy is normalized.
0normalizedOne exact-owner-site Las Vegas North technician role and one multi-city Las Vegas-eligible customer-success role are normalized. No current record is assigned to Downtown, Douglasville 1 or 2, or Phoenix Deer Valley without location evidence.
2normalizedThe Nevada state filter returned one current requisition, Data Center Technician 1, at the exact verified LAS1 address of 7185 Pollock Drive.
1normalizedAll seven current Las Vegas records are normalized. The CCSD / K–12 role is explicitly excluded from Switch context; the other six remain regional because none names Switch, Roy Horn Way, NAP 17 or NAP 18.
7normalizedThe legal applicant exposes no separate hiring board. Monitor later permits, awarded contractors and Switch careers instead of inventing entity-level openings.
0normalizedOfficial employer board verified. No reviewed infrastructure requisition is assigned to the Belmont mobile switching center.
0normalizedFive Las Vegas field-role categories are visible, but they lack requisition IDs, dates and a Belmont assignment. The 2024 project relationship is not treated as current exact-site demand.
0normalizedApplicant information is current, but no discrete requisition board or project-assigned opening exists. Hiring remains gated by the appeal and delivery milestones.
0normalizedCurrent operator and 24/7 on-site engineering are verified, but no stable public requisition board was found. Monitor the company route and local workforce channels without converting staffing language into vacancies.
0normalizedOfficial role list verified. Current field, network, support and critical-facilities openings are monitored, but none names Las Vegas or 7941 Giles Street in this cut.
0normalizedOfficial customer board route verified; no exact Douglasville facility role is normalized, and the colocation announcement does not imply customer-employed site hiring.
0normalizedOfficial customer board route verified. No exact Douglasville role is normalized and the precise building relationship remains qualified.
0normalizedPrimary filings verify the developer, but no public requisition board or active construction-start notice was found. Monitor entity, incentive and permit records.
0normalizedOfficial consultant board verified. No current opening is assigned to Rock House DRI 4078, 1971 Rock House Road or the Edged Maxwell survey / site-plan work.
0normalizedOfficial developer route verified. The linked CBRE opportunity system still requires full enumeration; no exact Winston or Douglas Waldrop role is normalized.
0normalizedA historical 2024 Douglasville civil-engineer / intern notice was found, but it is not treated as current. Monitor the consultant site and local filings for live intake and additional Waldrop scope.
0normalizedOfficial consultant ATS verified. No current record is assigned to Douglas Waldrop or the denied Hickman proposal; Georgia results still require structured location and worksite matching.
0normalizedThe July 2026 denial controls. Monitor only for appeal, refiling, annexation or ownership change; do not expose forecast jobs from the denied proposal.
0normalizedThe full board exposed 37 current roles and a Las Vegas search returned zero. No role is assigned to LAS01; no Georgia role is assigned to the denied Hickman proposal.
0normalizedThe DRI verifies Eberly's civil-design role on the denied concept. No current requisition or continuing Hickman assignment is normalized.
0normalizedOfficial project-specific local-business intake verified; BorderPlex does not expose a separate public requisition board in this evidence cut.
0normalizedOfficial microgrid-supplier careers route verified; no exact Santa Teresa requisition is normalized in this snapshot.
0normalizedDeduplicated Louisiana and Indiana state-filter results produced 109 current records; 13 Richland-market and 13 Lebanon-capable roles are normalized. The Coravel announcement verifies Turner at Hicks Field, but no current stable posting names that campus, so no Fort Worth role is assigned.
26normalizedOfficial career and subcontractor routes verified. Clayco is resolved to Meta Montgomery through city permits; no stable Montgomery requisition is normalized, and the separate Indiana campus relationship remains qualified.
0normalizedVerified Meta Montgomery builder board and trade-partner route. Exact-site job details remain to be normalized from the current board.
0normalizedOfficial intake lists field, civil, utility, safety and project roles. It does not expose dated requisitions or guarantee Alabama deployment.
0normalizedOfficial company page exposes career listings plus project-manager, journeyman and low-voltage pathways and a registered apprenticeship. Exact Montgomery requisitions remain to be normalized.
0normalizedOfficial employer page currently says applications are not being accepted. Kept on weekly watch to avoid presenting a contractor relationship as a live vacancy.
0normalizedApplications remain temporarily unavailable during DPR's candidate-system transition; the official notice says the refreshed experience returns August 31. Childress and Meta Mesa participation are verified, but no role can be normalized until the official board reopens.
0normalizedLegal project entity is verified in the county agreements. Hiring is expected to route through Lancium or project contractors; no separate entity careers board exists.
0normalizedParcel and agreement party verified. No official employer site, careers system or direct requisition route was located; monitor county filings and contractor disclosures rather than inferring openings.
0normalizedOfficial division portals verified and the Childress hiring relationship is direct from Workforce Solutions Panhandle. No stable Childress-filtered requisition was exposed in this cut.
0normalizedOfficial board and electrical apprenticeship route verified. No current employer posting reviewed names Childress, so the job-fair relationship is not converted into invented vacancies.
0normalizedThe official U.S. marketplace exposed 475 results at review. None was normalized to Childress because the event roster does not identify Siemens Energy's package or a project-assigned requisition.
0normalizedThe official board exposed 513 company-wide results. Childress participation is verified, but no stable exact-project result was identified; current openings remain discoverable through the route without false assignment.
0normalizedThe public workforce event verifies the participant name but does not resolve its legal entity or employer-controlled job board. Do not merge it with Target Hospitality without primary evidence.
0normalizedTwenty-five current Rayville roles, twelve Lebanon roles and six Cedar Rapids regional roles normalized across craft, civil, electrical, power, cabling, safety, quality, scheduling, commissioning and project delivery; one mixed-location record was excluded. Caldwell Valley's operator relationship is now verified, but no current posting names the campus, Lockhart, Uhland, Maxwell or the Farmers Road sites.
43normalizedSix project-specific Lebanon applications and all forty current El Paso-eligible Workday records are normalized; the El Paso set contains seventeen exact-city and twenty-three multi-location postings and remains regional because no individual requisition names Meta.
46normalizedOfficial careers page exposes a dedicated El Paso recruitment contact but not stable individual requisition URLs.
0normalizedOne current El Paso project-execution role normalized as regional because the customer is not disclosed.
1normalizedOfficial local application form verified; Birdsong does not publish discrete requisition pages.
0normalizedNorth Carolina fiber and manufacturing adapter pending.
0normalizedExact near-Hamlet project-engineer role plus one Charlotte-capable mission-critical estimating role normalized.
2normalizedSeven current exact-Rockingham civil and equipment roles normalized from 26 North Carolina records; each remains regional because the employer board does not name AWS or the Hamlet campus.
7normalizedFive current Raleigh / Charlotte engineering, detailing, programming and maintenance records normalized as regional contractor signals.
5normalizedOne current onsite North Carolina purchasing role normalized; customer and project remain undisclosed.
1normalizedOfficial board verified; Richmond-project requisitions remain to be normalized.
0normalizedOfficial mechanical-construction board verified; exact Richmond-project matching is pending.
0normalizedOfficial North Carolina-capable board verified; project-level matching is pending.
0normalizedSite-specific U.S. development matcher pending.
0normalizedTwo current exact-location Burlington data-center operations leadership records normalized from the official board.
2normalizedTwelve current Lordstown data-center construction roles normalized as regional because the customer and campus identity are undisclosed.
12normalizedOfficial company board verified; Fort Wayne openings are not normalized until a stable record identifies relevant project or data-center work.
0normalizedThree current local electrical-construction intakes normalized as regional because none names the Google campus.
3normalizedOfficial Fort Wayne-capable board verified; no stable posting identifies the Google project.
0normalizedOne current Fort Wayne construction-laborer record normalized as regional because the assigned project is not named.
1normalizedFour current multi-location Workday records that include Cheyenne are normalized across project engineering, construction technology and electrical preconstruction; all remain regional because no client assignment is named.
4normalizedTwo current exact-city Cheyenne operations roles and six current Atlanta platform roles normalized. Every record remains regional because T5 does not name a customer, campus or project assignment.
8normalizedAll five pages were enumerated and every current Las Vegas-capable requisition was normalized. Each remains regional across five separately evidenced Clark County programs because the board publishes no campus address, NAP number or building assignment.
31normalizedCurrent operator and 24/7 support contact are verified, but no public requisition board was found. Monitor company news, local hiring and direct operator disclosures.
0normalizedOfficial national board verified. No current record is normalized as a Lithia Springs Georgia Data Center vacancy.
0normalizedApplicant identity and data-infrastructure practice verified. The company exposes no public requisition board or Echo Road hiring route; project disposition and current role remain on record watch.
0normalizedOfficial career board and applicant-system route verified; no Abilene- or Childress-specific role normalized in this cut.
0normalizedThe registered Turkey 1 owner, occupant and operator is a legal project entity without a separate careers board. Monitor Lancium's official board and exact-Turkey filings; do not imply this LLC independently posts vacancies.
0normalizedCounty records verify the reinvestment-zone and abatement applicant name, but no employer-controlled site or direct hiring route exists. Monitor signed agreements, permits and contractor disclosures rather than inventing entity-level openings.
0normalizedOfficial designer career route verified. No exact Fort Stockton, Pecos County or Lockhart project-assigned requisition is normalized in this cut.
0normalizedTCEQ verifies the GW Ranch applicant and proposed power scope but exposes no employer-controlled careers route. Monitor permit milestones, entity disclosures and awarded equipment or construction firms; do not infer Amazon vacancies.
0normalizedOne current exact-city Cedar Rapids data-center maintenance role is normalized as regional; CBRE's Richland workforce relationship is separately verified, while the Cedar Rapids customer and campus remain unresolved.
1normalizedIES's Richland workforce relationship and data center job board are verified; local requisitions were not exposed as stable detail URLs.
0normalizedRayville / Monroe data center HVAC service-management requisition normalized from the official ATS.
1normalizedTwo onsite Richland-market project-controls openings normalized; client identity remains undisclosed.
2normalizedOfficial design-partner board verified. National MEP, BAS, commissioning and QA/QC openings remain unassigned to Atlanta West.
0normalizedOfficial architecture and design board verified. Permits establish Corgan's Hicks Field work, but no current requisition names that address; Atlanta and other regional data-center roles also remain unassigned without a project identifier.
0normalizedOfficial structural-engineering and BIM board verified. Atlanta openings remain regional unless the employer names DC BLOX West.
0normalizedVerified medium-voltage subcontractor exposes company contact and capability but no public requisition board in this evidence cut.
0normalizedOfficial supplier careers route verified. No current opening is tied to the completed DC BLOX West material package.
0normalizedExact-address retaining-wall relationship is verified through the city permit. The company site exposes capabilities and contact but no public requisition board.
0normalizedOne current exact-market Lithia Springs Safety Manager is normalized as regional. A city permit verifies Cleveland at Atlanta West, but the requisition does not name DC BLOX or 1701 North River Road.
1normalizedDeveloper identity and Project Blue role are verified, but Beale exposes no public requisition inventory in this cut. Monitor developer updates, county filings and any later operator disclosure.
0normalizedProject special-purpose entity with no verified employer-controlled careers route. Use records to resolve agreements and ownership; do not invent entity-level vacancies.
0normalizedPower-contract affiliate has no verified public job board. Monitor utility dockets and entity disclosures rather than treating it as a direct hiring company.
0normalizedOfficial board showed 101 company records and one Tucson-capable Project Manager requisition. The role remains regional because its four-location listing does not name Project Blue, the county address or a customer.
1normalizedFour current Tucson construction, materials, equipment and T&D records selected from 17 observed roles. TEP's service agreement is verified, but none of the requisitions names Project Blue.
4normalizedOfficial company board verified. No current exact-Mesa requisition was normalized; the live campus and 24/7 operating model are not vacancy counts.
0normalizedOfficial company route verified. No exact-Mesa, Reno or Florence posting is normalized, and planned campus scale is not converted into current jobs.
0normalizedOne current local sales role was observed and excluded as outside the data-center workforce scope. An older data-center engineer page is explicitly outdated and is not presented as live.
0normalizedNine current exact-city data-center roles are normalized: four in Mesa and five in Sparks. The observed total combines the reviewed city/state searches; retail and unrelated results remain excluded.
9normalizedFive current exact-Chandler requisitions and one Chandler / Mesa / Phoenix night-shift requisition are normalized. Building assignment within the eight-facility Chandler campus is not stated, and multi-location placement is never guaranteed.
6normalizedOfficial board verified for Edged's named local general contractor. Current roles still require structured enumeration and exact-facility assignment review.
0normalizedOfficial utility board verified. The Meta, Edged and Prime PHX01 service relationships do not make general SRP vacancies facility-specific without a worksite, project or infrastructure-package signal.
0normalizedEdged verifies Light Source Communications as the first network provider. No employer-controlled public careers board was verified; monitor provider disclosures and local fiber hiring without inventing vacancies.
0normalizedOfficial company route verified. No exact Goodyear or El Mirage role is normalized; marketed development scale is not a vacancy count.
0normalizedCurrent operating facility and support contacts are verified, but DCX exposes no public requisition inventory in this cut. Monitor the owner site without inventing roles.
0normalizedSix current opportunity or intake pages were observed. Phoenix-area mission-critical roles remain regional because none names DCX-GYR1 or the Goodyear worksite.
0normalizedAn Arizona Cox Business sales role was observed and excluded as outside the data-center workforce scope. No GYR1-assigned network or field role is normalized.
0normalizedOfficial board exposed five current company openings in the checked view, none assigned to a tracked West Valley data-center project.
0normalizedOfficial board and named PHX-13 joint-venture relationship verified. No current exact-PHX-13 requisition is normalized.
0normalizedNamed PHX-13 joint-venture builder and current company route verified. Exact Glendale openings still require structured enumeration and project assignment review.
0normalizedApplicant project and filing routes are public, but no employer-controlled careers system or current requisition inventory is exposed. Forecast employment is not converted into openings.
0normalizedPower entity is verified in public records but has no separate public job board. Monitor construction, air-quality and operating filings before assigning work.
0normalizedLegal land/applicant entity has no verified public careers route. Use it to track case disposition and ownership, not as an assumed employer.
0normalizedCounty record names the district, but no project-specific board or vacancy is verified. Monitor district and county infrastructure records without inventing hiring.
0normalizedOwner and MD-PHX1 scope are current, but no public requisition board is exposed. Monitor owner, city permits and later operating-company disclosures without inventing roles.
0normalizedOfficial board verified. Phoenix permit relationships are exact, but no current role is assigned to Thistle or AZP3 in this snapshot.
0normalizedExact Thistle civil packages are verified through city permits. The company site exposes capabilities and contact, not a stable public job inventory.
0normalizedOfficial heavy-civil board verified. Current Phoenix project matching across PHX02, AZP3 and Union Hills still requires exact worksite and assignment review.
0normalizedOfficial route verified for the permit-named substation and civil contractor. No stable Skyway or Union Hills requisition is normalized.
0normalizedOfficial local contractor intake verified. QTS Phoenix 2 relationships are exact permits, but current position and worksite matching remains unnormalized.
0normalizedOfficial owner board verified. Exact AZP and AZS-1 records remain to be enumerated; no general Phoenix-metro role is assigned without a Scottsdale, Phoenix or facility worksite.
0normalizedOfficial operator route verified. No exact PHX1 vacancy is normalized, and the footprint remains linked inside the Iron Mountain physical campus.
0normalizedOfficial life-safety and fire-protection board verified. Permit relationships are exact at AZP3; current Phoenix assignments still need requisition-level matching.
0normalizedOfficial owner route verified. Current Phoenix operations and PHX II construction records require structured enumeration and exact-location matching.
0normalizedPHX II commercial-shell relationship is verified by the city. No stable employer-controlled job board or exact-project vacancy is exposed.
0normalizedPHX II grading relationship is verified by the city. Public employment inventory and assigned work remain to be resolved.
0normalizedOfficial electrical route verified. The city names Wilson on PHX II fiber trenching, but no current requisition is assigned to Elwood.
0normalizedPHX II fireline relationship is verified through city permits. No stable public jobs inventory is exposed.
0normalizedOfficial local contractor route verified. PHX08 demolition and grading are permit-resolved; current assigned vacancies are not normalized.
0normalizedOne employer-hosted on-site Phoenix data-center / helpdesk technician opening is normalized. The page lacks a requisition ID and posting date, so recheck daily before applying.
1normalizedLa Salle remodel and fire-alarm relationships are exact city permits. No stable public project-specific job inventory is exposed.
0normalizedOfficial operator route verified. No exact PHX1 Townley vacancy is normalized in this cut.
0normalizedOfficial owner board verified. Exact PHX10 and Chandler PHX15 matching remains to be enumerated; general Phoenix roles are not campus-assigned without a worksite.
0normalizedOperating local colocation service is verified, but no public requisition inventory exists. Contact access is not represented as an opening.
0normalizedOfficial company route verified. Exact Lone Cactus data-center operations roles remain unresolved, and older facility specifications are refresh-tagged.
0normalizedOfficial carrier route verified. No exact Grant Street ILA role is normalized.
0normalizedOfficial carrier board verified. Exact 16th Street and PHX10 role matching remains to be enumerated; metro roles are not automatically site-assigned.
0normalizedOfficial company careers route verified. No current Chandler requisition is normalized; the operating facility and customer count are not represented as vacancies.
0normalizedOfficial owner and developer route verified. No requisition is assigned to the Frye Road redevelopment without a Chandler worksite or project signal.
0normalizedOfficial operator route verified. Current public roles still require exact Chandler or Frye Road matching before normalization.
0normalizedThe council denied PLH24-0046, so this entity is monitored only for appeals, refilings, ownership changes or a new application. No active hiring route is asserted.
0normalizedCurrent Tempe facility and 24/7 support services are verified, but no public employer-controlled requisition inventory was found. Service availability is not counted as hiring.
0normalizedCurrent Geneva Drive service page is verified. No public jobs board or exact-site vacancy is exposed, and ownership / Omnis continuity remains unresolved.
0normalizedOne current exact-Tempe data-center engineer contract is normalized across the three registered Tempe facilities. Customer and worksite are withheld, so it remains regional and cannot be assigned to a campus.
1normalizedOfficial employer page and ATS route verified. No current role naming Scottsdale or Paradise Lane is normalized; remote and company-wide infrastructure roles are not assigned to the facility.
0normalizedTen current employer-controlled opportunities were observed. None names Gilbert, AZ01 or Sunrise Boulevard, so no role is assigned to the facility.
0normalizedLegal landowner has no verified employer-controlled careers board. Monitor the cited APNs, recorded waiver, site plans and permits; do not present the ownership entity as a hiring company.
0normalizedIndividual ownership record exists for entitlement tracking only. No employer board or vacancy is asserted; monitor exact parcels for a later applicant, operator or contractor.
0normalizedOwner/applicant has no verified public jobs board. Monitor exact APNs and later cases rather than converting plan approval into hiring.
0normalizedOfficial company route is monitored for legal and planning roles. No requisition is assigned to SunHill without a project or Pinal worksite signal.
0normalizedPlanning-agent relationship is verified, but no stable public requisition inventory exists. Do not infer continuing work beyond the filed case.
0normalizedLandowner is a legal project entity without a verified careers route. Monitor deeds and later planning / permit records; no direct vacancy is public.
0normalizedApplicant identity is verified in the land-use action, but no employer-controlled job board or named field package is resolved.
0normalizedOwner/applicant has no verified public careers route. Monitor parcel 500-12-001B and later cases before exposing project work.
0normalizedOfficial company route is monitored. No current role is assigned to Project Midway without a Pinal worksite or project reference.
0normalizedThe August zoning denial controls. Monitor appeals, new cases and ownership changes; do not normalize forecast employment or company contact as an opening.
0normalized04Research coveragePress, permits, dockets, parcels + local filingsOpen
Coverage spans planned through operating sites. The register shows what has been reviewed—and what still has not.
State data-center + tax registers
WeeklyQualified facilities, effective dates and separate legal owner, occupant and operator identities—including projects with no press release.
A tax qualification proves a state registration, not an exact address, construction start, capacity, delivery or live hiring; every facility needs downstream corroboration.Owner + operator disclosures
WeeklyAnnouncements, construction milestones, capacity, investment and local commitments.
Usually favors large, publicized projects and may omit contractor detail.Official job boards + ATS feeds
DailyCurrent openings, exact locations, role families and employer demand signals.
A local opening is not assigned to a project unless the posting or another primary source makes that relationship defensible.County planning + zoning records
Every 14 daysEarly site plans, rezoning requests, meeting packets and projects outside the press cycle.
Naming is often hidden behind parcel owners, applicants or project codenames.Building permits + inspection logs
MonthlyConstruction starts, scope, valuation, contractor names and phase progress.
Systems differ by jurisdiction and many records are PDFs or local search portals.Tax abatements + development agreements
MonthlyCapital commitments, job promises, timelines, public obligations and legal project entities.
Approval is evidence of intent, not proof that construction or hiring occurred.Air, water + environmental permits
MonthlyGenerator counts, power equipment, construction milestones and site identity.
Technical permits confirm authorized scope; they do not guarantee full build-out.Utility + interconnection dockets
MonthlyLoad requests, substations, transmission work, service dates and power constraints.
Customer names can be redacted and requested load can exceed eventual deployment.Assessor, parcel + entity records
QuarterlyLand assembly, ownership changes, shell companies and smaller undeclared sites.
Entity resolution requires corroboration; ownership alone is not a data-center claim.Court dockets + administrative appeals
Every 14 daysPermit disputes, moratoria challenges, condemnation actions and milestones that can stop or restart a project.
A complaint states one party's allegations; docket mirrors can lag and outcomes must be verified from orders or official records.Public workforce + training systems
MonthlyLocal hiring routes, apprenticeships, credentials, cohorts and workforce commitments.
Program relevance is supporting evidence unless an employer or project partnership is explicit.A zero is published only after a documented jurisdiction review. Queued markets remain unknown.
Mesa
15projects resolvedAll 15 records in the live city data-center layer are preserved, including confidential names and overlapping addresses.
Next checkRetrieve underlying case files, inspections and applicant histories for every early-stage record.Goodyear
6projects resolvedCity company inventory, live agreement portal and current owner pages reconciled into six distinct campus records.
Next checkEnumerate parcel-level building permits, inspections and current trade packages campus by campus.El Mirage
2projects resolvedCurrent owner evidence resolves Microsoft operations / expansion and Compass development.
Next checkLocal parcel, entitlement, permit and building-level records are not yet fully retrieved; map placement remains approximate.Pima County
1projects resolvedProject Blue's county hub, permits, utility record and field evidence are active.
Next checkCountywide facility discovery beyond Project Blue and later vertical permit / inspection records remain incomplete.Buckeye
2projects resolvedThe citywide status page, Tech Corridor planning case and current Tract ownership record were reconciled. Grand View was screened out because the city says data centers are not its primary focus; the SR-85 / Patterson site is preserved as an unresolved lead.
Next checkRetrieve the executed Tech Corridor agreement, parcel and permit history, utility-service record and any first operator or building application.Avondale
3projects resolvedMunicipal planning, budget and permit-index records plus current owner pages resolve three distinct campuses: STACK PHX01, Prime PHX01 and QTS Hermosa Ranch. Generic city references to two groundbreakings are not assigned to a campus without a building-level record.
Next checkComplete the multi-month parcel-level permit and inspection sweep; resolve STACK commissioned buildings, QTS campus code and MW, and Prime building-by-building delivery.Glendale
4projects resolvedCity permits and owner records resolve three Glendale campuses across operating expansion, active fit-out and civil-permit stages. Project Baccara remains in Waddell but is included because Glendale annexation and rezoning cases are pending; postal Waddell labels are not allowed to erase municipal Glendale sites.
Next checkRetrieve adopted Project Eagle annexation and rezoning actions; complete building-level Phoenix 3 and Aligned permit/inspection crosswalks; verify Vantage vertical mobilization; resolve QTS contractor-license identities and current trade packages.Phoenix
17projects resolvedThe live city permit layer, PUD register and current operator portfolios resolve 17 physical or entitled records: campus-scale builds, legacy colocation, small edge facilities and one inactive entitlement. Tenant footprints inside Iron Mountain and Aligned are linked as companies rather than duplicated as land-and-building projects.
Next checkComplete the city Certificate of Occupancy and issued-permit export across every address; retrieve Maricopa deeds and assessor parcels for AWS Laveen and PHX08; resolve legacy PHX1 at 3110 N Central, 5C's undisclosed Phoenix location and enterprise facilities such as CGI, Honeywell, UPS, Phoenix Children's, Dignity and Maricopa storage without confusing server rooms with workforce-relevant data-center campuses.Chandler
8projects resolvedEight physical campus or proposal records reconciled. CyrusOne PHX1–PHX8 is one campus record, Data Canopy is a service relationship inside PHX8 rather than a duplicate site, and the denied PRIC proposal remains visible as inactive history.
Next checkComplete the Citizen Access permit and certificate-of-occupancy export; resolve current deed and operating use for the former 1890 / 1900 S Price complex; enumerate building-level CyrusOne PHX1–PHX8 facts, exact PHX-04 / PHX-06 packages and Frye redevelopment permits; screen smaller enterprise and edge facilities without misclassifying ancillary server rooms at semiconductor, aerospace or office sites.Tempe
3projects resolvedThree physical facilities are preserved: current owner-confirmed EdgeConneX PHX01 and ColoBarn, plus the Geneva Drive data-center building whose service page is current but ownership and active load remain unresolved. Recruiter demand is market-level and is not assigned to a campus.
Next checkComplete Tempe Citizen Access, issued-permit, inspection, certificate-of-occupancy, assessor and deed sweeps across all three addresses; resolve the 2025 Geneva sale disposition and Omnis / Cloudnium relationship; search historical use permits under the current Section 3-429 framework; screen ASU, municipal, semiconductor and enterprise facilities without misclassifying internal server rooms as workforce-relevant commercial data centers.Scottsdale
2projects resolvedTwo current commercial facilities are resolved: owner-confirmed Iron Mountain AZS-1 and 11:11 Systems' Scottsdale colocation / recovery facility. Historical tenant names inside AZS-1 and the former SunGard identity at Paradise Lane are not duplicated as separate land-and-building projects.
Next checkComplete address-by-address SPUR and legacy permit, inspection and certificate-of-occupancy exports; reconcile deeds, leases and current power records at Princess Drive and Paradise Lane; resolve the city primary data center and indexed Caremark, GoDaddy and smaller enterprise / edge leads only where a physical facility and workforce relevance can be distinguished from an internal server room; enumerate exact Scottsdale openings on owner ATS feeds.Gilbert
1projects resolvedOne current commercial facility is resolved. This matches town planning staff's February 2026 statement that they knew of one data center and had received no new data-center applications; OneNeck is retained as acquisition history rather than a duplicate site.
Next checkComplete One Stop Shop permit, inspection and certificate history for 1655 W Sunrise; reconcile parcel, deed, lease, business-license and current utility records; track the pending Land Development Code amendment and all post-February applications; screen GoDaddy, StrongMind, Silent-Aire and other indexed leads without confusing offices, hosting customers, modular-data-center manufacturing or internal server rooms with a separate physical data center.Queen Creek
0verified zeroZero physical data-center projects were resolved inside Queen Creek in this review. Ordinance 801-22 prohibits data centers as a primary use; a minimal ancillary facility directly supporting another business may be considered by conditional use. Pacific Proving is a Mesa project and is deliberately excluded from this town inventory.
Next checkRecheck zoning-text amendments, current cases, Development Nexus, council and commission packets, annexations, county-island filings and ancillary-use permits; screen enterprise facilities without turning internal server rooms into commercial data-center projects.Casa Grande
1projects resolvedOne pre-application campus envelope is resolved across two adjoining ownerships near Bianco Road. The August waiver is preserved as a property entitlement with conditions, not represented as an approved site plan or construction project.
Next checkComplete the citywide planning, CUP, site-plan, building-permit, inspection and certificate sweep; retrieve recorded waivers and current deeds; resolve applicant, end user, power entity, air-quality path, development schedule and every later contractor assignment.San Tan Valley
1projects resolvedSunHill is retained as a county-controlled project in the unincorporated Arizona Farms / San Tan Valley geography. Parcel ownership and the 2024 deed chain are resolved, while the approved comprehensive-plan amendment still does not establish rezoning, permits or a construction start.
Next checkRequest or account-search later county zoning, PAD, site-plan, building, utility, dust and industrial-air records for APNs 210-44-002 and 210-44-004; reconcile Florence planning boundaries and avoid assigning the project to an incorporated city without a controlling jurisdiction record.Florence
3projects resolvedThree distinct Dobson Farms development areas are preserved rather than collapsed into one campus. All three received 2025 general-plan amendments; only the 780-acre Florence Tech Park also has a resolved PUD amendment, while the east EdgeCore plan remains explicitly conceptual and the west parcel retains a mixed data-center / industrial envelope.
Next checkComplete town administrative site-plan, subdivision, building-permit, inspection and certificate sweeps; retrieve any post-entitlement applications, deeds and utility commitments; reconcile SRP service, air-quality paths, final campus identities, financing, operators, builders and contractor assignments for each parcel separately.Eloy
1projects resolvedSouthwest Crossing is resolved to municipal case RZPAD2024-006, Ryan Companies and the 122-acre Estrella / Houser site. The January 2025 P&Z recommendation and February council agenda are verified, but a signed ordinance or official action result was not resolved, so entitlement and construction forecasts remain gated.
Next checkRetrieve signed Ordinance 25-985, Resolution 25-1611 and official minutes or clerk results; sweep current planning, site-plan, building, inspection, utility and air-quality records; reconcile whether the campus remains active, changed scope, transferred, obtained power or received any contractor award.Coolidge
0verified zeroNo physical data-center project was resolved in the complete published 2026 Planning and Zoning index through the September cancellation notice. The city code allows data centers conditionally in Agricultural zoning and as permitted uses in Commerce Park and Garden Industrial districts, so this is a scoped zero-project result rather than a claim that no administrative or industrial filing exists.
Next checkRequest the municipal site-plan, building-permit, inspection and certificate registers; search iWorQ by address, parcel, owner and contractor; screen IPAZ parcels and utility / substation requests; monitor conditional-use, industrial-site-plan, council, assessor and recorder channels.Apache Junction
0verified zeroNo physical data-center project was resolved among the 38 records in the city's current development-project layer. A May 2025 council discussion referenced only a possible location, without a site or application, and the zoning code treats data centers as conditional uses in specified districts.
Next checkSearch MyGovernmentOnline planning and building records, permits, inspections and certificates by parcel / owner / contractor; request pre-application and economic-development records; monitor Legistar, zoning cases, utility requests, GIS updates and Pinal / Maricopa county boundary cases.Maricopa
0verified zeroNo physical data-center project was resolved among 81 named entries in the city's current development StoryMap. Frontier West is deliberately excluded from the city inventory because the controlling county packet places it in unincorporated Pinal County and records the City of Maricopa's objections within its extended planning area.
Next checkComplete VIP / permit, inspection, certificate, public-notice, meeting-packet, annexation, assessor, recorder, utility and economic-development-record sweeps; monitor the southern annexation area and county islands; do not move Frontier West into the city without a controlling annexation or jurisdiction record.Pinal County
4projects resolvedFour county-controlled data-center records are resolved across plan-amendment, pre-build and denied states. La Osa remains inactive after the August 26 zoning denial. SunHill, Frontier West and Project Midway now have parcel and recorder crosswalks, but later delivery approvals remain incomplete; Frontier West's 2026 survey is land activity, not a field start. Project Bella is adjacent permitted power infrastructure, not a data center or verified Midway supply contract. The current industrial-air notice register has no matching project entity, a result scoped only to that live notice set.
Next checkFinish the hearing index and obtain account-authorized or public-record results from Citizen Access; retrieve site-plan, building, inspection, dust, Class II / III air, utility-service and municipal-boundary records. Resolve 2026 amendment cases, county islands, administrative approvals and municipal-edge parcels without duplicating city projects or converting recorder activity and utility adjacency into construction or supply commitments.North Las Vegas
3projects resolvedThree distinct facilities are resolved: Novva, Flexential North and Verizon Belmont. Belmont is explicitly labeled a mobile switching center so telecom resilience infrastructure is visible without inflating the commercial data-center inventory.
Next checkComplete the citywide planning, permit, inspection, certificate, recorder, utility and business-license sweep; retrieve Belmont's final occupancy and air closeout; screen Aligned, carrier, edge and enterprise facilities without duplicating suites or internal server rooms.Henderson
1projects resolvedGoogle's operating Warm Springs Road campus is cross-checked through owner, city, assessor and emergency-planning records. The 520/560 street-address difference is preserved as one campus discrepancy, and Google's $6B figure remains a combined Nevada total.
Next checkComplete city and county planning, building, inspection, certificate, deed, utility and environmental sweeps; resolve building count, current MW and expansions; screen smaller colocation, enterprise and edge facilities without converting server rooms into separate campuses.Boulder City
1projects resolvedOne federal-parcel project is preserved as approved but contested. The separate city-parcel application was withdrawn and is not counted as another facility.
Next checkTrack the administrative appeal and final right-of-way instrument; resolve parcel geometry, utility and emergency-service agreements, financing, permits, contractor, construction timing and any project-specific workforce route.City of Las Vegas
2projects resolvedTwo operating downtown colocation records are resolved inside the city: Flexential Downtown and isp.net Data Center 2. The mailing label Las Vegas is not used to pull unincorporated Sunrise Manor facilities into the city count.
Next checkComplete city permit, fire, inspection, certificate, business-license and assessor crosswalks for both addresses; resolve current DC2 specifications and screen enterprise, carrier and government facilities without classifying ordinary server rooms as commercial data centers.Las Vegas market
14projects resolvedFourteen physical records now separate operating campuses, active earthwork, approved proposals, smaller edge facilities and one telecom switching center. Restoring isp.net's two-facility local portfolio makes a regional operator visible alongside hyperscale and national colocation owners. Clark County records resolve four Switch development envelopes beyond NAP 7–12 without treating permit equipment as IT capacity or regional jobs as exact-site assignments.
Next checkComplete municipal versus unincorporated permit, inspection, certificate, assessor, recorder, utility and environmental sweeps; verify current specifications, fire and occupancy records for both isp.net sites; resolve NAP 13 continuity and building-level delivery across every Switch envelope; screen enterprise and additional carrier sites without duplicating tenants or ancillary server rooms.Storey County
14projects resolvedFourteen distinct Storey County physical campus or land-development records now preserve operating, expansion, late-structure, horizontal-development, permitted internal-infrastructure and entitlement-only states. Peru Ridge is attached to Fleet as a probable underlying 517-acre / 230 MW land envelope rather than counted twice. Redwood remains an internal industrial facility, and every SUP, easement, zoning status or utility schedule stays distinct from a building start.
Next checkComplete building, fire, grading, inspection, certificate, parcel, deed, water, sewer, utility and air-quality crosswalks; retrieve permit numbers and final actions for active campuses and Tract land programs; resolve Fleet / Peru Ridge legal continuity, Vantage building one, South Valley and Virginia Highlands infrastructure, Microsoft or tenant-only footprints, DataBank and smaller private facilities before any county-completeness claim.Lyon County / Silver Springs
1projects resolvedOne owner-controlled planning-stage technology park is resolved near Silver Springs. Its development-agreement reference and 700 MW utility study are preserved as planning evidence, not committed power or construction.
Next checkRetrieve the Lyon County development agreement, exact parcels, zoning and administrative approvals; complete assessor, recorder, building, grading, inspection, certificate, utility, environmental and meeting-record sweeps; identify the adjacent hyperscale property and avoid duplicating it as Sapphire without parcel evidence.Reno–Sparks market
3projects resolvedApple's operating campus and Colovore's two separately marketed facilities are resolved with current exact-market hiring signals.
Next checkResolve jurisdiction, parcel and street address for both Colovore sites; retrieve municipal and county permits, inspections and certificates; enumerate Switch, Google, EdgeCore / PowerHouse, Microsoft, DataBank and other Reno–Sparks facilities before any market-completeness claim.05Source register770 cited records · refresh status attachedOpen
Defines national wage percentiles and explains why newer workers may sit near lower percentiles while experienced or more educated workers may sit near upper percentiles. Gridwork uses that relationship only as an experience proxy, not a guaranteed pay progression.
Reviewed 2026-08-29 · next 2027-08-29 · 365d cadence · high accuracyAuthoritative national cross-industry wage method; not a local offer, union scale, overtime forecast or direct measure of years of experience.Latest national OEWS release used to anchor median wages and broad early-career through senior market bands for Gridwork roles.
Reviewed 2026-08-29 · next 2027-08-29 · 365d cadence · high accuracyAuthoritative national occupation estimates. Role crosswalks are qualified where data-center titles do not map one-to-one to a federal occupation.Documents the typical high-school entry floor, 4–5 year apprenticeship, roughly 2,000 paid on-the-job hours per year and variable state licensing.
Reviewed 2026-08-29 · next 2027-08-29 · 365d cadence · high accuracyAuthoritative national pathway baseline; local licensing and apprenticeship admission rules control.Federal occupation profiles support apprenticeship length, education floor, work conditions and wage anchors for civil, structural and pipe-trade routes.
Reviewed 2026-08-29 · next 2027-08-29 · 365d cadence · high accuracyHigh for national occupation requirements; individual programs, licenses and local wages vary.Reports a May 2025 median of $61,010, a national lower tenth below $40,050 and upper tenth above $95,210, plus typical postsecondary and on-the-job preparation.
Reviewed 2026-08-29 · next 2027-08-29 · 365d cadence · high accuracyAuthoritative national occupation distribution; mission-critical chiller roles may pay differently by market, shift and employer.National pathway and wage evidence for network support and hardware-support routes, including education alternatives and on-the-job learning.
Reviewed 2026-08-29 · next 2027-08-29 · 365d cadence · high accuracyAuthoritative occupation baseline; data-center technician titles span several SOC occupations and employer levels.Defines registered apprenticeship as paid work with mentorship, progressive wage increases, classroom instruction and a portable credential; includes the federal opportunity finder.
Reviewed 2026-08-29 · next 2026-09-28 · 30d cadence · high accuracyAuthoritative program model and search route. Openings, entry tests, schedules and employer assignments vary by sponsor.Explains who must be certified, the four credential types, approved-test requirement and non-expiring credential.
Reviewed 2026-08-29 · next 2027-02-25 · 180d cadence · high accuracyAuthoritative federal requirement. Exam preparation and testing prices are set by approved organizations, not EPA.Defines 10-hour worker and 30-hour supervisor-oriented outreach classes and states that cards are voluntary awareness training, not a certification or substitute for employer-required hazard training.
Reviewed 2026-08-29 · next 2026-11-27 · 90d cadence · high accuracyAuthoritative program scope. Course prices vary by OSHA-authorized provider and some employers or jurisdictions impose additional requirements.Official certification route and knowledge scope for fiber installation, testing, safety and troubleshooting.
Reviewed 2026-08-29 · next 2026-11-27 · 90d cadence · high accuracyHigh for FOA credential requirements; school tuition, lab time and employer preference vary.Official vendor-neutral routes covering hardware support, troubleshooting and network fundamentals used in entry IT and network journeys.
Reviewed 2026-08-29 · next 2026-09-28 · 30d cadence · qualified accuracyHigh for certification scope. Exam versions, recommended experience, bundles and voucher prices change; Gridwork shows rounded cash-planning estimates.Official CHST eligibility and exam route; the current single-exam price is $300 before preparation materials or renewal costs.
Reviewed 2026-08-29 · next 2026-09-28 · 30d cadence · high accuracyHigh for current BCSP requirements and exam price; eligibility requires relevant construction safety experience and is not an entry-level shortcut.Federal route for comparing nearby programs, American Job Centers and occupation-specific state license requirements.
Reviewed 2026-08-29 · next 2026-09-28 · 30d cadence · high accuracyHigh for the federal search route; school tuition, completion, funding and licensing requirements must be confirmed with the provider or state board.First-party self-paced learning route for data-center power, cooling, efficiency and infrastructure fundamentals; completion is not a job guarantee or substitute for field qualification.
Reviewed 2026-08-29 · next 2026-09-28 · 30d cadence · qualified accuracyHigh for the provider's available course catalog; individual modules, access terms and completion recognition can change.5 GW expansion, more than 1,000 operational roles and Louisiana contract activity.
Reviewed 2026-07-20 · next 2026-09-03 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Names Turner, DPR and Mortenson; reports 3,700 construction workers and a 5,000-worker peak forecast.
Reviewed 2026-07-20 · next 2026-09-03 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Official project page confirms Mortenson's Richland Parish scope across civil work, utilities, power distribution, water infrastructure and outside-plant fiber; it reports 7,500+ craft workers at peak construction and 1,000+ long-term roles expected.
Reviewed 2026-07-20 · next 2026-09-03 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Mortenson's official careers index returned 26 Rayville-matched records; 25 current Rayville roles are normalized after excluding one record whose title names Lebanon.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.First facility operating, second under construction for 2028; nearly 10,000 construction contributors and 550 current on-site roles disclosed.
Reviewed 2026-06-23 · next 2026-08-07 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Owner-maintained project log identifies Walsh and Kiewit as general contractors, documents active Phase 2 work and publishes Walsh's subcontractor contact.
Reviewed 2026-06-23 · next 2026-08-07 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Three official records with unexpired application windows observed for Mount Pleasant data-center quality and construction-technology work.
Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Identifies Salem and Falls Townships; 1,250 high-skilled jobs across the planned Pennsylvania investment plus construction and supply-chain work.
Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Current owner project register covering active Falls and Salem construction plus the Kline Township preconstruction campus.
Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Current owner page confirms an operating campus, active construction since October 2025, a 20-building plan and approximately 1,000 permanent jobs at full buildout.
Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Current owner page confirms active construction, NorthPoint Development as partner, up to 10 buildings and a one-million-square-foot retrofit.
Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Current owner page identifies a 380-acre Schuylkill County campus in preconstruction and public review.
Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Local 12-month, 610-hour evening adult route in Frackville; the center also publishes HVAC, MSHA electrical and employer-arranged electro-mechanical training calendars.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Official local workforce route for job matching, training navigation, apprenticeships, recruitment, applicant screening and on-the-job training support.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.State source independently identifies NorthPoint Development as the Falls campus developer and documents the active air-permit process.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.Current Lower Bucks workforce register lists electrical, HVAC, building-trades and industrial-maintenance training, including free pre-apprenticeship options and published cohort information sessions.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Official county workforce route for job placement, candidate screening, recruitment events, on-the-job training and incumbent-worker training.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Official live Pennsylvania records observed across construction, safety, facilities, network delivery and data center operations.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Confirms Talen's power-supply relationship with the Amazon campus adjacent to Susquehanna and capacity for other Pennsylvania sites.
Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Official developer job board; no Pennsylvania project-specific requisition is normalized in this evidence cut.
Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Groundbreaking evidence; 500 high-skilled jobs and thousands of construction and supply-chain roles cited.
Reviewed 2025-10-30 · next 2025-11-29 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.Abilene partially online and expanding; identifies construction, electrical, equipment-operator and technician demand.
Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Current role supports one of two self-build campuses, in the Savannah or Abilene area, and is therefore retained as an Abilene regional match rather than a guaranteed site assignment.
Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Names Shackelford County, Doña Ana County, Lordstown and Milam County development sites.
Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.New Cedar Rapids data center, Council Bluffs expansion and an electrical workforce partnership.
Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Official filtered payload returned nine records; seven project-relevant exact-city, Iowa or multi-location data-center roles are normalized, while two search spillovers are excluded.
Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.City-maintained register distinguishes the Google and QTS campuses from the separately permitted 1515 33rd Avenue SW data center and links public project records.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.Owner factsheet documents a $10 billion, seven-building, 612-acre campus expected to support more than 2,000 construction and permanent jobs.
Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Builder portfolio confirms the Layton–Weitz joint venture is constructing a QTS Cedar Rapids campus building and identifies the client, scale and completion target.
Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Layton's official portfolio confirms its three-building Cedar Rapids delivery scope for the large closed-loop-cooled campus.
Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Issued city permit identifies CLOP Cedar Rapids IA LLC, 98,695 square feet and 10 MW; Iowa's public air-permit portal identifies the facility as Oppidan Cedar Rapids.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.Current Cedar Rapids pathway with industrial-maintenance and automation tracks; related Kirkwood offerings cover HVAC, electrical systems, controls and employer-linked electro-mechanical apprenticeships.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Official state workforce system where a current Cedar Rapids CBRE data-center maintenance record was observed; the customer and campus assignment are not disclosed.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Utility source confirms Alliant's QTS campus relationship and documents construction, trade and initial operating-job commitments.
Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Official location board observed with current Cedar Rapids data center project-management, field-operations and superintendent openings.
Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Official detail pages observed for current Cedar Rapids scheduling, quality, supervision, safety and project-controls roles; the client and campus are not disclosed.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Current QTS Cedar Rapids job-shadow route introduces critical operations, electrical, mechanical and HVAC careers with a 20-student capacity.
Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.New Armstrong and Haskell County campuses and training for 1,700+ electrical apprentices by 2030.
Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Official employer search returned nine exact-Haskell records across server operations, facilities, electrical, mechanical, controls, construction program management and network delivery.
Reviewed 2025-11-14 · next 2025-11-15 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.County register lists Haskell DC Owner, LLC (Crusoe) separately from Google-linked Thelma, Journey, Quest and Ranger records.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.Four current official Haskell construction-management and project-specialist records observed on Crusoe's Ashby board.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Four buildings and a warehouse across 818 acres; 7,000 construction jobs, 1,500 ongoing project-supported jobs, local-priority hiring and an Oracle paid-trainee pathway.
Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.Names STACK as infrastructure delivery partner, BorderPlex as campus partner and Blue Owl-managed funds as capital backing for the more-than-one-gigawatt Stargate campus.
Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Reports 2,700 workers onsite by July 2026, nearly 700 New Mexico residents, 150+ New Mexico firms, UA 412 and Carpenter participation, DACC partnerships, job fairs and a project-specific local-vendor intake.
Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Official Workday location feed returned 16 current Santa Teresa-capable roles across critical operations, controls, EHS, commissioning, training, procurement and leadership.
Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Historical national construction-employment baseline used only as a directional model input.
Reviewed 2023-10-01 · next 2023-11-15 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Adjacent 900 MW Microsoft campus; site preparation underway, mid-2027 first-building target, thousands of construction and hundreds of permanent jobs expected.
Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Owner announcement says the 270-acre, 1 GW campus is expected to begin construction in Q3 2026, with thousands of construction jobs and more than 100 permanent positions. Lancium owns the land and manages energy infrastructure; Crusoe says it will design, build and operate the data center for an unnamed hyperscale customer.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyDirect owner/developer statement. Capacity, schedule and jobs are announced expectations rather than permit-confirmed delivery or audited employment.Lancium's owner-side release confirms a 270-acre, grid-connected campus, Q3 2026 construction target, closed-loop non-evaporative cooling, behind-the-meter solar and storage, thousands of construction jobs and more than 100 long-term roles. It describes Lancium as land and energy-infrastructure developer and Crusoe as data-center designer, builder and operator.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyDirect land and energy developer statement; announced totals and timing are not evidence that the full campus is permitted, built or energized.State register lists Lancium Clean Campus — Childress 1 with March 25, 2025 registration and Lancium LLC as owner, occupant and operator under identifiers LD053115-OW1, LD053115-OC1 and LD053115-OP1. The register predates the Crusoe announcement and does not establish the later campus's full 1 GW as built or energized.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyOfficial state registration record for the named facility and legal roles; registration is not a construction-completion or energization certificate.Executed county agreement names Lancium LLC, Rolling Plains EV Stations LLC and Lancium Childress LLC; sets a minimum Phase 4 threshold of 90,000 square feet and 90 MW; and a December 31, 2030 commercial-operations completion deadline. Its Local Outreach Plan requires commercially reasonable local labor and business efforts, a preconstruction job and contracting session, and active solicitation of local subcontractor proposals, but no numeric local-hire quota.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyExecuted scanned agreement OCR-checked against capacity, completion, contracting and Local Outreach Plan pages. Thresholds are agreement conditions, not proof of current construction or workforce counts.Executed county agreement sets a separate minimum Phase 5 threshold of 90,000 square feet and 90 MW and a December 31, 2031 commercial-operations completion deadline. It repeats the Local Outreach Plan requiring the owner and prime contractor to hold a local job and contracting session and actively solicit local subcontractors.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyExecuted scanned agreement OCR-checked against capacity, completion and outreach pages. Phase thresholds should not be added to the 1 GW announcement as if all capacity were underway.Joint owner/developer announcement says QTS will design, build and operate data-center buildings on Lancium's Clean Campus near Turkey. It projects more than $10 billion of investment, up to 7,000 peak construction jobs and about 350 permanent QTS, maintenance, security and tenant roles; these are forward-looking totals, not observed employment.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyDirect project-party statement establishes the relationship and announced program. Investment, schedule and job totals remain projections until filings, awards, field evidence and operating records corroborate them.Current project page describes a proposed campus near Turkey with up to 11 buildings across an approximately 465-acre facility area. QTS labels the market in development, says planning and permitting continue, and explains that the 6,000–7,000 construction and 350 permanent job figures may evolve.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyCurrent owner/operator page is strong evidence of project scope and status language. The page provides a general-area map rather than parcel coordinates, and its jobs and scale figures are plans rather than completed delivery.State register lists Lancium Clean Campus — Turkey 1 with a January 25, 2026 effective date and Lancium Turkey LLC as registered owner, occupant and operator. The registration predates the July QTS announcement and does not establish that construction, energization or operations have started.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyOfficial state record for the named facility and registered legal roles. Qualification is not a building permit, construction inspection, certificate of occupancy or employment record.County notice describes an approximately 2,014-acre proposed reinvestment zone in southwest Hall County, east of Texas Highway 70 along County Roads AA and 7. It verifies local-government review and general geography, not final abatement terms or construction commencement.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyOfficial hearing notice provides dated geography and proceeding scope. A notice of hearing is not evidence that the zone, an abatement or a construction package was approved.Commissioners Court notice scheduled discussion and possible action on requested amendments tied to approximately $20 billion of data-center-tenant improvements across about 4,575 acres in two Turkey Clean Campus reinvestment zones. It is an agenda notice, not proof that amendments were adopted or that the broader amount matches QTS's later 465-acre program scope.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyOfficial county agenda verifies the requested action, entities, geography and stated improvement amount. Final approval, executed terms and relationship to the later QTS plan require the signed agreements or minutes.Current inventory lists Childress Center pathways in industrial maintenance, electromechanical technology, basic electrical, electrical controls and HVAC, plus welding credentials. No QTS, Lancium or Turkey placement agreement is disclosed.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyOfficial college catalog inventory verifies credential availability and Childress Center location. Current cohorts, seats, schedules and employer placement must be confirmed with the college.State registration covers a new $300 million, 189,060-square-foot data-center building at 6000 TX-18, Fort Stockton, with Amazon Data Services as owner and Gensler as designer. The Aug.–Dec. 2026 dates are filed plans; status remains Project Registered.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for filed address, owner, designer, valuation, area and scheduled dates. Registration does not prove that construction started or finished on schedule.Separate state registration covers Building B at the same address: $300 million, 189,060 square feet, Amazon Data Services owner, Gensler designer, and an Aug.–Dec. 2026 filed construction window. Status remains Project Registered.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for this distinct building filing. It supports summing three separately named building scopes, but not asserting actual field progress.Separate state registration covers Building C at the same address: $300 million, 189,060 square feet, Amazon Data Services owner, Gensler designer, and an Aug.–Dec. 2026 filed construction window. Status remains Project Registered.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for this distinct building filing. Completion remains scheduled rather than observed until inspection, occupancy or later owner evidence is available.TCEQ's preliminary determination describes Pacifico GW LLC's proposed 5,000 MW natural-gas plant on Highway 18 about 17 miles north of Fort Stockton, dedicated to an on-site AI data center and isolated from the local utility distribution system. The record does not identify Amazon or equate plant nameplate with deployed data-center load.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the permit applicant, proposed generating scope and on-site data-center purpose. Relationship to the Amazon address is a geographic inference until parcel, owner or first-party evidence explicitly joins the records.Official location search route for Amazon and AWS data-center roles. No current exact-Fort Stockton posting was normalized in this evidence cut.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the employer-controlled route at observation time; zero normalized openings is a snapshot and must be refreshed daily as mobilization advances.Official regional workforce board lists a Fort Stockton center at 461 South Highway 285 and provides employer, training and job-seeker services. A January 2026 Texas data-center career fair shows sector familiarity, but no Amazon project agreement is disclosed.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for current location and service availability. Project-specific orders, placements and recruiting commitments require direct board or employer confirmation.Regional AAS and certificate pathway covers electrical systems, instrumentation, PLCs, motor controls, industrial automation, installation, maintenance and troubleshooting. No Pecos County Data Center placement agreement is public.
Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for current college-published curriculum. Distance, current cohorts, seats and Amazon employer use require direct confirmation.Official workforce event, held with Crusoe and Lancium, identified DPR Construction, Hoffman Construction, Rosendin, Siemens Energy, Southland Industries and Target Workforce Housing as participating employers building the Childress facility. It advertised electricians, heavy-equipment mechanics, CDL drivers, mechanical/plumbing/piping trades, managers, superintendents, project engineers, safety, support and materials roles with onsite interviews and conditional offers.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyOfficial public-workforce roster tied to the named project and dated event. It verifies participating hiring employers and role families, not every firm's prime/package scope or that an opening remains live after the event.Official careers hub routes applicants across general construction, concrete, mechanical, specialty contracting, layout/modeling, steel and project-support divisions. Workforce Solutions Panhandle ties Hoffman to Childress hiring, but the public careers hub does not expose a stable Childress-filtered requisition set.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyEmployer-controlled application routes are current; project relationship comes from the public workforce event and exact Childress openings remain unnormalized.Official employer hub covers skilled craft, electrical apprenticeship, project management, safety, engineering and support roles. The Childress workforce event verifies Rosendin as a project hiring participant; no employer posting reviewed here names the Childress campus.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyCurrent employer-controlled career route. Project relationship is direct from the workforce event, while individual openings require a Childress location or worksite before normalization.Official United States board exposes engineering, field service, facilities, logistics and project roles. Siemens Energy was a Childress job-fair participant, but its exact equipment or service package and any project-assigned requisition remain undisclosed.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyEmployer-controlled board; the public workforce roster verifies participation, not a specific package or current Childress requisition.Official board spans mechanical, plumbing, piping, HVAC, building automation, project management, safety and support work. The Childress job fair verifies Southland as a participating project employer; no stable posting reviewed here names Childress.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyEmployer-controlled board with current postings; project assignment is limited to the workforce-event roster until a Childress requisition is exposed.Rendered official board observed for Abilene, Childress and Haskell project-region openings.
Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Official careers search returned 12 Mount Pleasant roles; ten first-page records are normalized in this evidence cut.
Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Official careers search returned six fully on-site Abilene data-center records spanning critical-environment engineering, program management and campus operations leadership.
Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Official Amazon Jobs records observed for Hamlet across controls, infrastructure delivery, network installation and data center operations.
Reviewed 2025-10-30 · next 2025-10-31 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Official Amazon Jobs record observed in Berwick, the regional labor market for AWS's Salem Township development.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Current local program register includes electrical construction, HVAC, industrial maintenance, mechatronics, electronics, building maintenance and cybersecurity/networking pathways.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Official college update documents AWS-supported hands-on fiber installation, testing and maintenance training for faculty, with additional local training opportunities planned.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Official Luzerne County workforce entry point for job search, training navigation and employer services; individual postings still require employer and worksite verification.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Project-specific hub for Louisiana positions and construction trade-package interest; also confirms Turner, DPR and Mortenson delivery roles.
Reviewed 2026-07-20 · next 2026-09-03 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Official Cornerstone board returned 109 unique Louisiana- or Indiana-capable requisitions; 26 exact-market or project-descriptive records are normalized for Richland Parish and Lebanon.
Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.DPR says applications are temporarily unavailable while it launches a refreshed candidate experience on August 31, 2026; a notification form remains open.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Official ATS postings observed for onsite data center construction work in Holly Ridge and Rayville, Louisiana.
Reviewed 2026-07-20 · next 2026-07-21 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Official Workday posting for onsite Rayville data center HVAC startup, commissioning and warranty support.
Reviewed 2026-07-20 · next 2026-07-21 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Current four-week local training route with construction, electrical, safety, equipment and fiber-splicing credentials.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.State-maintained route for Louisiana vendors, subcontractors and suppliers seeking Richland Parish opportunities.
Reviewed 2026-07-20 · next 2026-08-19 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.Identifies IES Communications as a Richland Parish data center workforce partner; separate LDCC reporting identifies CBRE's RPL installer pathway.
Reviewed 2026-07-20 · next 2026-08-19 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Lists Gateway Technical College and the four associated IT and data-center courses; students apply through the college.
Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Local project hiring hub naming AWS and Walbridge contractors and routing job seekers to RichmondCC career support.
Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Documents the local no-cost, two-day certificate course, hands-on curriculum, employer networking and a participant hired by a project contractor.
Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Confirms the 15-week Abilene MEI Data Center Operator program, first 12 graduates, fall registration and Google's $3.6 million investment in a 2027 Abilene academy and skilled-trades scholarships.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Announces an Abilene OpenAI Academy intended to connect credentials and local employers; a current enrollment route was not verified in this evidence cut.
Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Official iCIMS posting identifies a data center project near Hamlet, North Carolina.
Reviewed 2025-10-30 · next 2025-10-31 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Official careers API returned 26 current North Carolina records; seven exact-Rockingham craft and civil roles are normalized. RichmondCC identifies Phillips as an AWS Hamlet contractor, but the individual postings do not name the customer.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Official employer pages observed for current Raleigh and Charlotte engineering, detailing, programming and maintenance roles; exact project assignments are not disclosed.
Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Official Pinpoint board observed with a current North Carolina purchasing role; the posting does not identify the customer or project.
Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Separates active Canton / Madison County construction, the Warren County campus and the Hinds County retrofit; reports 2,000 planned statewide jobs and 75+ Mississippi companies already engaged.
Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Vicksburg-area campus announcement with 200 direct jobs, 300 additional regional positions and named Mississippi training partners.
Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.Official live Canton records observed across technician, engineering-operations and site leadership roles.
Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Official live multi-location records cover Vicksburg across technician, engineering operations, network delivery and commissioning; all remain regional until the assigned facility is confirmed.
Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Official live pooling requisition covers active or upcoming AWS data-center sites in Virginia, Georgia, Mississippi and North Carolina; no single-campus placement is guaranteed.
Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Owner update identifies Alston Construction as the Clinton retrofit builder, confirms at least 100 operating jobs and names Hinds Community College and AccelerateMS as workforce partners.
Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Official board currently exposes three Jackson-project mission-critical field and quality roles; postings do not identify the customer, so Clinton matching remains regional.
Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Official Jackson and Vicksburg workforce route provides job placement, training assistance, on-the-job training and employer recruiting services.
Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Owner factsheet confirms a $35 billion plan for multiple new Virginia data-center campuses through 2040 and separates construction, connection, operation and maintenance employment effects.
Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Current state register identifies AWS facilities and recent permits in Spotsylvania, Stafford and Louisa counties, including Cosner Tech Campus and additional IAD facilities.
Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.Twelve current official requisitions are normalized across launch-team operations, network delivery, safety, critical facilities and construction; two multi-location records remain regional matches.
Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.College source documents a paid four-week AWS program covering electrical, HVAC, mechanical and data-center operations, with twenty graduates at the Fredericksburg Area Campus.
Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Owner source documents a planned $10 billion Ohio expansion through 2030, identifies Fayette County as the first new site with an estimated $5 billion investment, and describes Columbus State workforce programs.
Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.State filing identifies the Jeffersonville campus on 359.56 acres, with fifteen data-processing buildings and four ancillary buildings; Phase 1A began in March 2025 and Phase 1B work is scheduled through December 2027.
Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.Current owner impact page states that New Albany investments support more than 1,500 local jobs and provides statewide investment and employment context.
Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Six current exact-city requisitions are normalized across security, engineering operations, facilities and cluster leadership; two multi-location engineering records remain regional matches.
Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Six current exact-city requisitions are normalized across engineering, safety, logistics and operations leadership; one multi-location logistics record remains a regional match.
Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.College source describes the technician certificate, hardware and network curriculum, maintenance and inventory skills, and AWS scholarships worth up to $3,000 per student.
Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Locates the decade-scale campus at the Indiana Enterprise Center near New Carlisle and cites at least 1,000 jobs plus state training support.
Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.Adds 1,100 planned high-skilled roles and documents the Community Workforce Accelerator, Ivy Tech programs and paid pre-apprenticeship pathway.
Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Official exact-city records observed across construction, controls, facilities, network delivery and operations leadership.
Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Clayco describes a confidential Indiana data center campus and separately features the AWS South Bend welcome event on the same official page; the client and New Carlisle assignment are not explicitly linked, so the relationship remains unverified.
Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Groundbreaking evidence for a 1 GW, $10B+ campus with 4,000+ peak construction jobs, 300 operating roles and a Boone County workforce program.
Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Project-specific owner page names Mortenson, Turner Construction and Faith Technologies and directs workers to the Lebanon contractor hub.
Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Confirms Mortenson's Lebanon delivery role, collaboration with Turner and Faith Technologies, and local trade-partner opportunities.
Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Project-specific hiring page verifies FTI's Turner and Mortenson partnership and publishes six official Lebanon application routes.
Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Current construction evidence for the 1 GW El Paso campus; 2,300 workers onsite, 4,000+ peak construction jobs and 300 operating roles, with first capacity expected in 2028.
Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.City project hub identifies Wiwynn, Faith Technologies and Schneider Electric as regional companies expected to provide services to the Meta project.
Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.Documents dozens of local electrical, technician, manufacturing and entry-level roles tied to FTI's new El Paso manufacturing facility.
Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Official ATS location facet returns forty current El Paso-eligible requisitions: seventeen exact-city records and twenty-three multi-location records spanning electrical, controls, low voltage, commissioning, quality, safety, logistics, manufacturing and project delivery.
Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Official live El Paso project-execution requisition; the customer is not disclosed, so it is treated as a regional supplier signal.
Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Local one-year credit or continuing-education route covering commercial and industrial wiring, motors and controls, PLCs, troubleshooting, electrical safety and embedded OSHA 30 certification.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Local IT pathway covering hardware, network administration and troubleshooting, initial network cabling and computer operations; no Meta placement agreement is asserted.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Official Clinton-based civil contractor application route; Amazon separately identifies Birdsong as participating in its Mississippi work.
Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.No-cost skilled-trades pathway with NCCER credentials and a conditional contractor-partner job; pilot states include Louisiana, Indiana and Texas.
Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Ten-building, 1,200-acre campus with 5,000+ construction jobs, 1,600+ ongoing project-supported jobs, local-priority sourcing and closed-loop cooling.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.Four distinct current field-based OCI construction-management requisitions explicitly cover Shackelford County or Shackelford, Texas, including contractor coordination and turnover readiness.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Owner announcement identifies Frontier as a $25B-plus, 1.4 GW campus with 10 data centers, 3.7M square feet and more than 5,000 construction and ongoing-operations workers. It says construction had begun and first delivery was scheduled for the second half of 2026.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect owner evidence for identity, scale and announced status. Investment, workforce and delivery figures remain owner projections until later filings, inspections and observed employment corroborate them.Current owner page confirms the 1,200-acre, 10-building, 1.4 GW and 3.7M-square-foot program and describes liquid cooling, fiber, security and operating systems. First data-center delivery remains scheduled rather than certified complete.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for current owner-published specifications; delivery timing and operating status need inspection or later milestone evidence.State register lists ten Frontier entities effective October 8, 2025: Vantage TX301–TX310 as separate owners/operators and Oracle America Cloud Services as occupant for each facility.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyOfficial record for facility legal roles and effective dates. Qualification does not prove construction completion, energization or occupancy start.Building 1 filing: $950M, 344,796 sq. ft., scheduled Feb. 2026–Aug. 2027; Vantage TX301 owner and Kiewit designer; Project Registered.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for filed scope, owner, designer, value, area and schedule; registered dates are not field milestones.Building 2 filing: $1.185B, 398,117 sq. ft., scheduled Dec. 2025–Sep. 2027; Vantage TX302 owner and Kiewit designer; Project Registered.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for filed scope; status does not verify physical progress or completion.Building 3 filing: $990M, 344,796 sq. ft., scheduled Oct. 2025–Apr. 2027; Vantage TX303 owner and Kiewit designer; Project Registered.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for filed scope; status does not verify physical progress or completion.Building 4 filing: $1.315B, 453,385 sq. ft., scheduled Sep. 2025–May 2027; Vantage TX304 owner and Kiewit designer; Project Registered.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for filed scope; status does not verify physical progress or completion.Building 5 filing: $955M, 344,796 sq. ft., scheduled Oct. 2025–Feb. 2027; Vantage TX305 owner and Kiewit designer; Project Registered.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for filed scope; status does not verify physical progress or completion.Building 6 filing: $950M, 344,796 sq. ft., scheduled Jan. 2027–May 2028; Vantage TX306 owner and Kiewit designer; Project Registered.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for filed future scope; scheduled work is not current construction.Building 7 filing: $1.15B, 398,117 sq. ft., scheduled Nov. 2026–Apr. 2028; Vantage TX307 owner and Kiewit designer; Project Registered.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for filed future scope; scheduled work is not current construction.Building 8 filing: $965M, 344,796 sq. ft., scheduled Sep. 2026–Apr. 2028; Vantage TX308 owner and Kiewit designer; Project Registered.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for filed future scope; scheduled work is not current construction.Building 9 filing: $1.161B, 398,117 sq. ft., scheduled Apr. 2026–Nov. 2027; Vantage TX309 owner and Kiewit designer; Project Registered.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for filed scope; status does not verify physical progress or completion.Building 10 filing: $945M, 344,796 sq. ft., scheduled Jun. 2026–Oct. 2027; Vantage TX310 owner and Kiewit designer; Project Registered.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for filed scope; status does not verify physical progress or completion.Separate $74M support-office filing at Building 11 lists 1,548,000 square feet. Gridwork excludes it from the ten data-center building total because the scope is not a data center and the unusually large filed area requires clarification.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for the filed record as written; qualified for physical area and campus rollup because the support-office classification and 1.548M-square-foot figure may reflect filing error or broader scope.County agenda considered designating the Abilene Fire Department as primary responder for the Vantage Data Center, independently linking the Vantage identity to the county project area.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyOfficial agenda verifies the named emergency-response matter. It does not by itself prove the action taken; minutes or a signed agreement remain the next record target.Official board exposes exact-Abilene data-center roles across fiber, materials, quality and emergency/clinic operations. Six stable detail pages are normalized; additional list-only Abilene results remain discoverable but unnormalized until a stable record is resolved.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for current titles and location at observation time. Kiewit is named on Frontier filings, but postings do not print the Frontier customer or exact building; residual assignment ambiguity is disclosed on each opening.Owner announcement describes a five-facility DFW program: about 140 MW across three leased facilities plus expansion rights for about 100 MW across two more. Turner will lead construction, with staggered service dates through 2028. Gridwork resolves this to Hicks Field from the matching five-building program, ACS legal entities, filing sequence and Fort Worth records; the announcement itself does not print the street address.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for Coravel, capacity, building count, Turner and service-date plan. Exact Hicks Field identity is a high-confidence cross-record resolution because the release omits the address; service dates are not completion evidence.Official council communication identifies a 107-acre, five-building campus at 10059 and 10197 Hicks Field Road and 9401 Wagley Robertson Road. Terms require $481.6M in real-property improvements, $1.685B in business personal property, 37 full-time jobs by 2034 averaging at least $150,000, and 15% hard-construction spending with Business Equity Firms for the full incentive tier.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyOfficial adopted terms for minimum commitments and addresses. Commitment deadlines are not evidence that investment, hiring or local-equity spending has already occurred.Official minutes record council approval of the Hicks Field economic-development agreement.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyHigh for approval status. The minutes do not establish later compliance, construction progress or grant payment.City staff report covers ACS Infra's proposed Oncor substation on 47.231 acres and calls it critical infrastructure for the associated future data center. Staff recommended the platting waiver.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyOfficial evidence of the proposed substation and staff recommendation. The agenda is not final action, energization or proof of campus operation.State register lists ACS DC Hicks Field Road LLC as owner, the occupant field as rendered with Google LLC and Paile LLC, and Vanguard US ServiceCo LLC as operator, effective August 18, 2026.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyOfficial legal-role record. The page's occupant formatting is preserved rather than silently normalized; qualification does not establish service start or public hiring.DFW11 filing: $280M, 251,303 sq. ft., two data halls and scheduled Jan. 2026–Jun. 2027; ACS DC Hicks Field Road owner and Corgan designer; Project Registered.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for filed scope, value, parties and schedule. Project Registered and scheduled dates do not verify field progress or completion.DFW12 filing: $100M, 283,274 sq. ft., four data halls and scheduled Aug. 2026–May 2028; Vanguard Project Co. DFW12 owner and Corgan designer; Project Registered.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for filed scope. The August start is scheduled, not a verified mobilization date.DFW13 filing: $100M, 283,274 sq. ft., four data halls and scheduled Jan. 2026–Jan. 2028; Vanguard PropCo 1 owner and Corgan designer; Project Registered.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for the record as filed. The owner name and design-firm address contain apparent filing typos, so Gridwork preserves the source while using corroborated entity relationships for the campus graph.ACS consolidated affiliate list includes ACS Digital USA, Vanguard PropCo entities and Vanguard US ServiceCo, supporting the legal-entity resolution behind Coravel's U.S. platform.
Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · high accuracyHigh for ACS group-affiliate membership. The affiliate list alone does not allocate each entity to Hicks Field; the state and building records make that project link.Fort Worth 12-week pathway covers maintenance fundamentals, electrical troubleshooting, HVAC, plumbing, safety, job-search preparation and EPA 608 certification.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for current published curriculum and duration. No Hicks Field, ACS, Turner, Coravel or Google placement agreement is asserted.County workforce board offers job matching, workforce centers, hiring events, training support and no-cost employer recruiting services.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for published services. No Hicks Field recruiting agreement or employer participation is public in this review.Owner campus page presents an eight-building, 205-acre, 384 MW and 2,000,000-square-foot Lockhart plan with onsite Bluebonnet substation service and closed-loop air and liquid cooling. All eight buildings are labeled Development / Available; Gridwork does not treat that status as construction or completion.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for the owner-published campus plan and marketing status. The page's 144 MW figure appears only under AUS01-01 and is not multiplied across buildings; filed building scope is controlled separately by TDLR.Owner technical sheet identifies AUS01-02 at 3300 FM 2720 as a 250,000-square-foot hyperscale building with liquid cooling in development and available for customers.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyDirect for owner-published product specifications. Marketing availability is not a permit, construction milestone or executed lease, and the PDF path month is used as the document date because no separate publication date is printed.State registration covers two new 380,000-square-foot shell buildings at 1395 Bob White Road: 760,000 filed square feet, $400 million stated cost and a scheduled June 2026–September 2027 window. Lockhart Property LLC is owner, no tenant is assigned and Gensler is designer.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for the record as filed. Project Registered and scheduled dates do not verify mobilization, inspection, completion or a separately filed AUS01-03 building.Active construction authorization identifies Lockhart Property AUS01 at 1395 Bobwhite Road, Sundt Construction as operator, 88.81 disturbed acres, a March 11, 2026 estimated start, March 19 coverage, July 31, 2027 estimated end and receiving waters in the Plum Creek watershed. The registry supplies site coordinates 29.924164, -97.753544.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for authorization status, operator, dates, disturbed acreage, address and coordinates as recorded. Coverage and estimated dates authorize and describe construction; they do not independently prove the quantity of work completed or vertical-building progress.State register names the large data center project AUS 01 02 03, Lockhart Property LLC as owner and operator, and Paile LLC as occupant, effective August 17, 2026.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyOfficial legal-role and project-name record. Qualification does not prove physical progress, service or hiring, and Paile's wider corporate identity is not inferred beyond the register here.County recap records an initial three-building campus at FM 2720 and Bob White Road, three Chapter 312 abatements and three Chapter 381 agreements. It estimates $1.3 billion in aggregate improvements, $280,000 per property per year under the abatements and minimum employment conditions whose numeric threshold is not printed on the served page.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyHigh for approved program structure and stated amounts. The recap references minimum employment requirements but does not disclose the count, so Gridwork leaves the threshold unresolved.Official minutes record approval of Prime Reinvestment Zone #1, the three tax-abatement agreements, the three Chapter 381 agreements and the $1.3 billion aggregate improvement estimate.
Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · high accuracyHigh for formal approval. The minutes do not prove later compliance, construction progress, hiring or tax payments.Execution version identifies Lockhart Property LLC, approximately 205.756 acres and the Prime Data Centers AUS01 development, and sets drainage, site-development and variance terms. County recap confirms approval on April 23, 2026.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the parties, acreage and adopted development framework. An agreement authorizes and conditions development; it is not a field-start or completion record.County workshop recap distinguishes Prime's separate approximately 206-acre facility from Tract's 3,000-acre Caldwell Valley Technology Park. Gridwork uses this record to prevent the projects, capacity and job signals from being merged.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyHigh for the county's explicit project separation and approximate acreage. Negotiation status was current at the March workshop and was superseded by the April development-agreement approval.Owner careers page displayed 36 total positions and seven exact-Lockhart listings across commissioning, two construction-scheduler postings, construction project management, controls operations, QA/QC and construction leadership. Five were simultaneously visible in the official Rippling index; the controls and VP records remain separately disclosed rather than silently collapsed.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · qualified accuracyHigh for titles and Lockhart locations observed on the owner page. Qualified for cross-system availability because the owner frontend and Rippling index were not perfectly synchronized at review time; refresh daily.Official job-board review found 46 current data-center results, including four that name Lockhart: Data Center MEP Manager, Quality Manager – Data Center Construction, Concrete Field Superintendent – Data Centers, and a multi-location HSE Manager – Data Center Construction role that includes Lockhart. Gridwork links these roles directly to AUS01 because TCEQ independently names Sundt as the site's construction-permit operator.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · qualified accuracyHigh for observed titles, locations, posting dates and official requisition URLs. The job descriptions do not print Prime or AUS01, so the project match relies on the independent TCEQ operator record plus Prime being the disclosed Lockhart data-center site; refresh daily because openings can close without notice.Official trade-partner portal states that subcontractors must prequalify before award, routes firms through BuildingConnected / SubQual, requires annual status refresh and asks applicants to identify self-performed CSI MasterFormat scopes. The route is company-wide and does not expose an AUS01-specific bid package.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for Sundt's company-wide prequalification process and portal. Qualified for AUS01 opportunity because no public package, bid date or Lockhart solicitation is shown; firms should name the project and verify an active package with Sundt.Two active construction authorizations name M. A. Mortenson Company as operator for Caldwell Valley Technology Park infrastructure. TXR1593YF covers 50 disturbed acres at the 727 Farmers Road LCRA access, began May 13 and estimates work through July 16, 2027. TXR1535YV covers 35 disturbed acres at the Farmers Road construction entrance, began July 14 and carries the same estimated end date. Both identify industrial construction, a common plan of development and Clear Fork Plum Creek receiving waters.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for permit status, operator, site labels, dates, disturbed acreage, locations and coordinates as recorded. The authorizations verify access and entrance construction scope; they do not establish a data-hall building start, installed power, tenant or percentage complete.Official company-wide program requires trade partners to complete prequalification before contract award, uses TradeTapp / BuildingConnected and provides a separate bid-list contact route. It does not publish a Caldwell Valley package, bid date or award on the served page.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for Mortenson's company-wide eligibility and bid-list process. Qualified as a Caldwell Valley opportunity route because no campus-specific solicitation is public; firms should identify Caldwell Valley and verify an active scope.Official Lockhart center provides no-cost recruitment, employment and information services to employers and job seekers in Caldwell County.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for published center location and services. No Prime-, Tract- or contractor-specific intake or placement agreement is public in this review.Current Lockhart schedule and center pages identify hands-on training in HVAC, plumbing, welding and construction, including Basic Electricity for HVAC and Introduction to the Construction Industry at the 20,000-square-foot Ford Building.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for published programs and observed 2026 course schedule. Live sections, seats, prerequisites and future terms change; no Prime or Tract placement agreement is disclosed.County recap records approval of the Chapter 312 agreement for a turnkey data center, identifies Edged Energy as expected owner/operator, places the campus on approximately 330 acres off SH 142 near LCRA's Timmerman Powerplant in the Maxwell area and publishes a $7.3 billion improvements estimate.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the county action, named public operator, approximate geography and county estimate. The acreage is rounded; the two executed development agreements control the exact 319.936-acre total. The estimate is not verified spend or taxable value.The statutory newspaper notice reproduced in the March 26 county packet names CDE Acquisitions LLC as owner of the property and EDC Austin LLC as the tax-abatement applicant. It also publishes the four-corner Caldwell 142 Reinvestment Zone #1 coordinates and the $7.3 billion best-estimate capital figure. The packet's agenda cover instead calls EDC Austin both property owner and applicant, so Gridwork preserves the notice and agenda wording as a public-record discrepancy.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for what the published legal notice states. Qualified for current ownership because the same packet's agenda cover, executed agreement, later development agreements, land survey, TDLR filing and Texas register assign owner-like roles to different entities. The notice is not a deed, title report, permit or field-start record.Executed agreement projects construction by April 15, 2026 and substantial completion by August 15, 2028. It targets 30 full-time-equivalent jobs in abatement year one and 50 in years two through ten at a $67,500 average salary; qualifying jobs may be with the owner, affiliates, tenants or vendors whose full-time workplace is the project. It also sets a 215-gallon-per-month-per-megawatt water limit, excluding the initial non-potable cooling-system charge.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for executed terms, targets and definitions. Construction dates are contractual projections, not field evidence. Job and salary targets are incentive metrics rather than guaranteed payroll; missing them changes abatement and PILOT calculations but is expressly not a default.County recap records unanimous approval of two development agreements for the Maxwell-area campus and states that Edged Energy will own and operate it. It reports the rounded 330-acre and $7.3 billion scope and describes closed-loop server cooling with a finite initial non-potable fill and potable water limited to ordinary fixtures and food preparation.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for approval and the county's public project description. Exact acreage, parties and permit conditions are taken from the executed agreements; the owner/operator statement is county attribution and should be rechecked if the project is assigned or sold.Executed phase-one agreement names EDC Austin LLC as developer of 127.328 acres. It sets the two-step mass-grading / permanent-road floodplain process, a two-stage site-and-foundation then vertical-building permit path, closed-loop cooling, contemplated interim onsite natural-gas generation, later LCRA or other utility interconnection and an illustrative Kimley-Horn site plan with two SH 142 entrances.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the legal party, exact acreage, adopted conditions and credited consultant. The agreement vests and permits a development path; its site plan is expressly illustrative and nonbinding, and it does not prove that a permit was issued or work began.Executed phase-two agreement names EDC Austin LandCo LLC as developer of 192.608 acres and applies the same closed-loop cooling, interim onsite-generation, utility-interconnection, floodplain, grading, foundation and vertical-permit framework. Together with phase one, the executed footprint totals 319.936 acres.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the legal party, exact acreage and adopted development conditions. It is authorization and entitlement evidence, not proof of construction, power delivery, final building configuration or completion.State accessibility registration identifies 11255 Hwy 142 in Maxwell, a $2.8 billion privately funded new 869,684-square-foot one-level data-center building, a filed June 2026–June 2028 schedule, Capital Land Investments I LP as building owner, no assigned tenant and MG2 Architecture Corporation as designer.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for the record as filed. Review Complete is the accessibility-plan status; it does not prove a building permit, mobilization, inspection, substantial completion or operation. Dates and cost are applicant-supplied and require refresh.The 2026 appraisal roll identifies property 11780 / geo ID 0100188-184-000-00 on Hwy 142 in Maxwell as 320.35 acres with no improvements and Capital Land Investments I LP as 100% owner. The district's deed-history index shows a July 24, 2020 special warranty deed from JDB Turner Crest LLC to Capital Land Investments I LP, instrument 2020-003860 / page 2020-003851. The legal description spans the Thomas Maxwell A188 survey and part of Hector McNeill A199, matching the tract scale and landholder named in the Edged development exhibits and TDLR filing.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for the 2026 roll and indexed deed fields as displayed. Qualified for current legal title and exact acreage because the appraisal district labels its data research-only, directs users to verify legal descriptions and acreage, and reported ownership processing only through April 29, 2026 at review time. A later deed, assignment or unprocessed record may not appear; use the county clerk's official public records or a title report for legal title.Gridwork reviewed all eight regular-meeting agenda packets from May 14 through August 27. County engineer payment registers name Prime AUS03 site-plan review in May, Prime AUS01 site-plan review in June and August, and Prime AUS01 Buildings B&C review in August. They also continue Caldwell Valley traffic, driveway, floodplain CLOMR and LCRA-access-drive reviews. No reviewed register entry exactly names Edged, EDC Austin, CDE Acquisitions, Capital Land Investments, 11255 Hwy 142 or Kimley-Horn project 060027703.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for the exact invoice descriptions found and for the scoped no-match across the reviewed packet text. An invoice description proves county engineering review activity, not permit issuance, physical work or completion. A missing exact name does not prove no application exists under another label, parcel, consultant or unindexed county system.The adopted resolution supports appropriately designed and sited data centers while requesting stronger state and local authority over grid reliability, water, roads, drainage, agriculture and public reporting. It favors closed-loop cooling, non-potable water where feasible, and independent impact analysis.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyHigh for the county's adopted policy position. The resolution requests safeguards and legislation; it is not a permit decision, zoning ordinance, construction moratorium or revocation of an existing development agreement.The August 13 recap records adoption of portions of the 2024 International Fire Code with fire-marshal inspections for covered buildings and Resolution 34-2026, which pauses new county economic-incentive and tax-abatement agreements for large data centers until the 90th Texas Legislature adjourns. The county says future developers may still pursue development agreements without incentives.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the adopted county actions and their stated scope. The incentive pause is not a construction moratorium and does not by itself cancel Prime, Tract or Edged agreements. Fire-code applicability and inspection status must be checked at the building level.July 23 county minutes record a pre-sale agreement with a land-acquisition company interested in a potential data center. The August 13 county recap says the judge and all parties had been released from that agreement. No parcel, acreage, buyer legal name, project code, capacity, investment, application or permit is public in the reviewed record.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for the existence and subsequent release of the disclosed pre-sale agreement. Qualified as a project signal because the site, company and development scope were not disclosed, and a released land option is not an active data-center proposal. Monitor only for a new filing or materially new agreement.Official owner careers route for North American development, construction, commissioning and operations roles. No reviewed owner posting names Maxwell, EDC Austin or 11255 Hwy 142; one current employer-attributed Data Center Commissioning Manager listing says remote U.S. with greater-Austin candidates preferred and remains a regional lead only.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · qualified accuracyHigh for the official careers route. The Austin-preference detail is employer-attributed through LinkedIn because the owner page's open-role module is not reliably indexable; assignment to the Maxwell campus is unverified and must not be implied.Current employer-attributed full-time Edged listing is remote within the contiguous United States and says a candidate in greater Austin, or willing to relocate there, is highly preferred. The post does not name the Maxwell campus, EDC Austin or the Hwy 142 worksite.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · qualified accuracyQualified current hiring signal. Title and location preference are employer-attributed, but the listing is not the owner-controlled careers page and project assignment is unresolved. Recheck availability and application routing daily.Official MG2 posting for a fully remote project architect with data-center expertise and no stated closing date. TDLR separately names MG2 on the Maxwell building, but the requisition does not name Edged, Maxwell or the Texas filing and is retained as a regional supplier lead only.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · qualified accuracyHigh for the posted role and requirements at review. Qualified for project matching because no site assignment is disclosed; reconfirm that applications remain accepted before relying on it.Owner register labels Caldwell Valley Owned & In Development and publishes a 2,973-acre, 4,000 MW plan, 2028 site-energization target, 345 kV transmission access, the Kinder Morgan Permian Highway gas-pipeline corridor and multiple campus options.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for the owner's current plan and infrastructure description. Capacity and energization are development targets, not installed load, service or completed buildings.Owner announcement records two closed acquisitions adding 1,458 acres to the original 1,515-acre park. It says Tract, Bluebonnet and LCRA are planning a scalable onsite substation, with the first 250 MW contracted for Q1 2028 delivery, and that onsite generation planning has begun.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for closed acreage and owner-named planning parties. The 4 GW-plus potential, 1.6 GW substation scale, 250 MW delivery date and onsite generation remain forward-looking until utility, regulatory or energization records verify delivery.County-served agreement names TXLCO Caldwell County LLC as developer and covers ten tracts totaling approximately 1,515.309 acres. It allows data centers and related power, transmission, water and wastewater infrastructure; requires whole-property utility, drainage and traffic plans with the first preliminary plat; and states a $15 million road-improvement obligation. Exhibits show conceptual development areas, potential substations and Norris Design authorship.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · qualified accuracyThe county recap and meeting record establish approval, but the PDF served online is an unsigned copy of the approved terms. It resolves the recap's obvious acreage typo to 1,515.309 acres. The agreement says SH 2720 while county geography and later records identify FM 2720; Gridwork preserves that discrepancy and does not infer construction.County recap records approval of the first amendment adding approximately 1,500 acres to the Technology Park at Caldwell Valley development-agreement area near FM 2720 and Jolley Road. It describes data-center and innovation-center uses.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · qualified accuracyHigh for approval, purpose and approximate location. Tract's later closed-acquisition record supplies the more precise 1,458-acre addition and 2,973-acre total.Sealed minutes record Tract developer Mitch Nelson's request to add approximately 1,500 acres without changing the agreement's terms, Commissioner Theriot's recusal and unanimous approval by the participating court.
Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · high accuracyPrimary approval record. The minutes use an approximate acreage; the owner's later acquisition announcement controls the exact increment and total used in Gridwork.County payment register identifies active engineering review entries for Caldwell Valley's floodplain CLOMR and driveway access plus a Tract LCRA access drive. The May 28 register also names the campus traffic-impact assessment.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect evidence that named civil submissions were under county engineering review in May–June 2026. Invoice descriptions do not establish permit approval, physical mobilization, contractor award, completion or utility service.Official careers route and Tract resource index were reviewed. No current posting observed in this evidence cut names Caldwell Valley, Caldwell County, Lockhart, Uhland or Maxwell; older Denver and remote resource pages are not treated as current campus vacancies.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · qualified accuracyHigh for the absence of an exact project location on the reviewed official route. The page is JavaScript-rendered and older indexed role pages can persist, so the board requires weekly recheck.Official board publishes Texas roles across transmission, engineering, project management, telecom, facilities, power operations and maintenance. No reviewed requisition names Caldwell Valley or the Tract LCRA access drive.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · qualified accuracyHigh for the current official career route and categories. Individual requisitions change and remain regional until LCRA names the Caldwell Valley worksite or assignment.Official board covers field operations, trades, safety, engineering and project management. No reviewed posting names Caldwell Valley or an onsite-generation package.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · qualified accuracyHigh for the current official job route. The owner's pipeline-corridor reference establishes proximity, not a Kinder Morgan construction contract or project assignment.Official careers page exposes Texas and other office filters plus a general application route. No reviewed posting names Caldwell Valley.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · qualified accuracyHigh for the official route. A Texas office posting is not assigned to Caldwell Valley unless Norris Design names the project or worksite.Utility careers page publishes year-round recruiting for its Department of Labor-certified lineworker apprentice pool, with 672 hours of technical instruction and 8,000 hours of on-the-job learning over roughly four years.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the employer's current program description. Entry into the application pool is not a vacancy, hire or assignment to either the Prime or Caldwell Valley substation program.Names SB Energy as the builder and operator of OpenAI's 1.2 GW Milam County Stargate site, with initial service beginning in 2026.
Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Reports more than 1 GW under construction, 10,000 construction jobs and nearly $100 million in county revenue for the Milam campus.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.Official Greenhouse-backed board exposes current Building Engineering Lead and Site Operations Lead roles in Burlington, Texas.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Official employer postings name a Lordstown hyperscale data center construction campus, but do not disclose the customer or connect the work to Stargate.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Current OpenAI data-center role covers community relationships, workforce, education, incentive compliance and community benefits across Ohio; the posting does not name Lordstown as its sole assignment.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Local applied pathway with hands-on labs in circuits, electronics, robotics, automation and industrial controls; no Stargate placement agreement is asserted.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Official regional workforce board serves Haskell and Shackelford counties and offers employer, labor-market, training and job-seeker services.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Official regional workforce board explicitly includes Hall and Childress counties in its 26-county service area and provides job matching, training, rural access and employer recruiting services.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyOfficial service-area and program source. The separate August 4 event record establishes a Childress-specific recruiting relationship; no Turkey-campus recruiting agreement is yet public.Official Central Texas workforce system serves Milam County through Rockdale and Cameron offices with recruiting, training and job-seeker services.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Confirms the 120,000-square-foot Waco center is open with Building Construction, Electrical Construction, HVAC, Plumbing and Pipefitting, and Solar Energy programs.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Data-center employers describe direct demand for TSTC instrumentation, electrical power, controls, wiring, diagrams and troubleshooting skills; the programs are based at Waco.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Year-round adult offerings include industrial electricity, motors and controls, PLCs, instrumentation, piping, rigging, OSHA 10 and customized employer training.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Current owner page identifies Fort Wayne as operational, Michigan City and Morgan County as developing, and promotes the Indiana STAR skilled-trades pathway.
Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Current multi-location Google operations-lead requisition includes Michigan City and Aurora; the posting does not identify a specific facility assignment.
Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Current official requisition names Michigan City as its sole location and covers server, network and infrastructure deployment and maintenance; the posting does not name a specific campus.
Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Current official requisition names Michigan City as its sole location and publishes a $105,000–$146,000 base-pay range plus bonus and equity; the posting does not name a specific campus.
Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Current official exact-city role leads Michigan City colocation electrical, cooling and IT infrastructure; its third-party-data-center scope means it is a local market signal, not proof of assignment to Google's developing owned campus.
Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Current official board exposes a Michigan City Data Center Associate, Data Center Team Lead and Data Center Supervisor at the Royal Road location; DSV does not identify its customer.
Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Official county ordinance creates the Morgan County Data Center Project I Planned Unit Development District and permits data-center development under its concept plan.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.Official Region 1 register lists the Michigan City WorkOne office and routes residents to local career, training and job-search services.
Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Current program register lists industrial mechanical, interdisciplinary workforce and safety pathways at Michigan City, with data center engineering operations available at Valparaiso and four other Indiana locations.
Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Official Region 5 workforce board confirms Morgan County coverage for job-seeker, training and employer services.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Current employer-scheduled training covers chiller and cooling-tower operation, maintenance, controls, water treatment and performance; Ivy Tech identifies a dedicated Morgan County employer consultant.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Current official Workday board exposes four multi-location records that include Cheyenne: Project Engineer, Construction Technologist and two electrical preconstruction leadership roles.
Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Official BuildingConnected / TradeTapp route adds qualified trade firms to Hagerman's bidder network for suitable upcoming opportunities; no Google package award is implied.
Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Official earn-while-you-learn pathway covers electrical, HVAC, building automation, low voltage and other trades used in data-center construction; Fort Wayne availability requires a live local-board check.
Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.City source reports 1,000 construction jobs, 200 expected permanent roles and names Shambaugh & Son, Hi-Tech Electric, Hagerman Group and Brooks Construction as local project companies.
Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.Current exact-city operations opening for deploying, troubleshooting and maintaining Fort Wayne data center infrastructure.
Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Official exact-location search and detail pages expose ten current Monrovia roles across site leadership, facilities, controls, electrical, mechanical, maintenance planning, business programs and security.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Confirms the first paid Fort Wayne STAR cohort and that graduates moved into sponsor-company work at the Google site or other local projects.
Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Current official intake lists a project manager, journeyman electrician and electrical foreman for Fort Wayne and Northeast Indiana.
Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Current official Fort Wayne construction-laborer application; the posting does not identify the Google project.
Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Announces the 715,000-square-foot campus, more than $800 million investment, 1,000 peak construction workers, about 100 operating jobs and Fortis as builder.
Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Builder portfolio verifies Fortis's Cheyenne delivery role and directs subcontractors to the public plan room.
Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Confirms Meta support for the Laramie County Trades Academy and its industry-led construction, electrical, HVAC, fiber and heavy-equipment pathways.
Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Official Lever board exposes two current Cheyenne operations roles; the customer and facility are not identified.
Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Current Cheyenne pathway for high school seniors and adults covers HVAC, electrical systems, safety and basic facility operations.
Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Current program register includes Data Center Technician, Electrical Technology, Industrial Maintenance, networking and cloud administration at the Cheyenne campus.
Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.County project register documents the special-exception process for parcel 00710034 on Randall Hunt Road and links the official planning, DRI and Board materials. The register is the discovery hub; the linked packet and DRI carry the underlying facts.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyOfficial county index to the filed special-exception and regional-review record; final signed disposition is not posted on the index page.Filed packet identifies parcel 00710034, a 400 MW full-buildout request, City of Thomson water and sewer, no existing sewer or natural gas at the site, $1 billion estimated buildout, 125 estimated full-time jobs and no requested tax abatement at the staff-report date. It reports 30,000 gallons per day of water, which conflicts with the DRI's 0.1 MGD figure and remains unresolved.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyOfficial filed staff report and Planning Commission materials; projections are applicant or regional-review estimates, not audited commitments. Water-demand conflict is retained explicitly.Public regional-impact record reports six buildings totaling 950,000 square feet, a 2029 projected buildout, $1 billion estimated value, 125 estimated full-time jobs and a 400 MW request. It says sufficient power was not then available; Jefferson Energy, Georgia Transmission and Georgia Power were studying upgrades. It reports 0.1 MGD water demand, conflicting with the county packet's 30,000 gallons per day.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyOfficial regional-impact filing. Capacity, timing, investment and employment are filed estimates; utility availability and conflicting water figures remain unresolved.Applicant-maintained page says the Planning Commission and Board approved the special exception with conditions. Because the county index does not surface signed final minutes or a resolution, the final disposition remains qualified pending retrieval of the official action record.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyDirect applicant statement, useful for status but not a substitute for the signed county disposition.Developer site identifies Cameron Grogan as founder and development lead and lists completed or permitting data-center work in Greensboro and Burlington, North Carolina. McDuffie County's filing names Grogan as Project Azalea's representative; the record does not identify the end user.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyCompany identity and portfolio are first-party; the Azalea relationship is established by the county filing naming Cameron Grogan, while ownership and end-user identity remain undisclosed.Official board currently lists Engineering Technician, Facility Maintenance Technician and Facility Worker. The DRI names Jefferson Energy as the planned electric supplier, but none of the requisitions names Project Azalea, parcel 00710034 or a Thomson worksite; all three are regional utility signals only.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh confidence that the openings are live on the employer's board; project attribution is deliberately limited to regional because the postings do not name Azalea.Official board exposes engineering, technician, planning, land, relay, substation and project roles at the Tucker headquarters. The DRI names Georgia Transmission only as a participant in ongoing upgrade studies; no Azalea construction award or project-assigned vacancy is asserted.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyLive employer-controlled openings are accurate as observed; the connection to Azalea is limited to the DRI's study-participant statement.Official careers route for statewide power and infrastructure work. The DRI says Georgia Power was participating in upgrade studies; it does not establish a delivery package, construction award or project-specific vacancy.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyEmployer-controlled careers route; any Azalea relationship beyond study participation remains unverified.Official regional workforce system explicitly serves McDuffie County with employment services, training support, assessments, job fairs and employer recruitment.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyOfficial service-area and program route; it does not prove a Project Azalea hiring partnership or placement.Current college register lists electrical systems, industrial systems, mechatronics, HVAC, welding and engineering-technology pathways in the Augusta labor market.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyCurrent official program catalog; no exclusive Azalea cohort or placement agreement is claimed.State environmental register confirms Vantage's 672-acre Lighthouse construction site, wetland and stormwater actions, sewer and water reviews, transmission coordination and permits for 45 emergency generators.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.Owner project page reports a $15 billion-plus investment, four data centers, nearly 1 GW and 2.5 million square feet, with 4,000-plus construction jobs, 300-plus Vantage positions and 700 customer positions at completion.
Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Owner account documents a local-first, union-first career expo attended by more than 200 job seekers and names Oracle, Gurtz Electric, H.J. Martin, Michels, Turner, McCarthy, Weitz and WRTP | BIG STEP as hiring partners.
Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.First-party labor pledge commits to local union labor to the fullest extent possible and describes a three-year peak construction window requiring more than 4,000 skilled workers.
Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Official employer board lists a current Commercial Drywall Carpenter opening in Port Washington; the page does not identify the assigned project.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Official workforce intermediary publishes apprenticeship-readiness, entry-level construction skills, tutoring and career-navigation routes for Wisconsin residents and employers.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.County filing identifies the applicant and developer entities, four parcels totaling 960.32 acres, a roughly 475-acre data-center footprint, a $10 billion estimate, up to 1,000 peak construction workers, 200 long-term employees, adjacent power development and an 18-month substantial-action condition.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.Current college catalog documents a Roosevelt-based 720-hour electrical apprenticeship classroom pathway delivered with employer-provided on-the-job training.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Official statewide job, employer-recruiting, apprenticeship and workforce-services route, including an Eastern Utah service network. It does not imply a Nine Mile Data placement.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Developer project page identifies the Grassmere Business Park site, a 69,200-square-foot 10 MW first-phase building, a $380 million-plus estimate, hundreds of peak construction workers, local-union intent and an evaluation-stage status.
Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Passed city record creates small, medium, large and campus classifications and adds siting, cooling, generator, noise and annual-compliance requirements. It is a policy record, not proof that Grassmere is approved.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.Passed and mayor-approved ordinance authorizes Metro to acquire the 23.49-acre project parcel through negotiation or condemnation; authorization does not establish that an acquisition has occurred.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.Third-party docket mirror records the August 11 federal complaint and a November 16 initial case-management conference. Later filings must be rechecked against PACER or the court docket.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyQualified docket metadata from a third-party mirror; recheck the official court system for later filings and outcomes.Official Ashby feed exposes five current corporate openings, all at the Atlanta office; no Nashville, Birmingham or Huntsville requisition is normalized in this evidence cut.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.Current two-year Nashville program covers electrical systems, industrial automation, PLCs, controls, motors, generators, power distribution and troubleshooting.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Current program register includes HVAC/R, industrial maintenance and mechatronics, commercial and industrial electricity, construction, networking and cybersecurity, and welding pathways.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Owner project page separates a contracted 5 MW, 36,500-square-foot expansion scheduled for Q2 2026 through Q4 2027 from a larger 60 MW, 263,000-square-foot adjacent concept that remains under evaluation.
Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Owner facility page identifies the operating campus at 433 6th Street South, its 2019 opening, initial 31,000-square-foot facility, Tier III certification, current colocation service and expansion-ready power and acreage claims.
Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Official city route for tracking permit applications, review steps, fees, documents and inspections. A project-specific expansion permit number was not exposed in this review and must be resolved through the address search or a public-records request.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.Official city register documents 20 current hyperscale-data-center conditions covering separation, load and phasing disclosure, water and closed-loop cooling, utilities, noise, backup power, site plans and neighbor notification. Application to a specific expansion still requires permit-level confirmation.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.Current Birmingham workforce course covers safety, electrical theory, NEC, raceways, test equipment, conductors and construction documents; the college describes it as grant-funded with ongoing enrollment but publishes no DC BLOX placement agreement.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Current Bessemer program offers short-certificate, certificate and AAS routes covering industrial equipment, motors, motor controls, PLCs, maintenance and troubleshooting; no DC BLOX placement agreement is disclosed.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.State employment-service page identifies AlabamaWorks as the statewide 24/7 job-matching and employer-recruiting system. Individual employer, worksite and project relationships still require verification.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Owner facility page identifies the operating Tier III colocation site at 333 Diamond Drive NW, a 9,000-square-foot initial facility expandable to 52,400 square feet and up to 13.5 MW, and a Huntsville portfolio count of two facilities operational or in development.
Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Owner announcement identifies a new Huntsville site designed to provide 5 MW to a hyperscale client. It does not disclose the parcel, construction team, delivery date or whether later 333 Diamond Drive permits serve that node.
Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Official address query returns permit 654979 for $24.0377 million of commercial new construction issued October 16, 2024 and permit 689774 for $18.71382 million of industrial alteration issued April 30, 2026. The layer does not name the contractor or detailed scope, so neither permit is assigned to the separate 5 MW node without further records.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.Current Huntsville pathways cover industrial wiring, transformers, NEC, motor controls, PLCs, drives, automation, robotics and preventive maintenance; degree, certificate and short-certificate options are published without a DC BLOX placement agreement.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Current Huntsville HVAC pathway offers an AAS, certificate and short certificate and publishes HVAC Excellence accreditation; intake and seat counts require college confirmation and no DC BLOX placement agreement is disclosed.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Owner campus sheet places MGM1 at 7610 Bill Joseph Parkway in Hope Hull and describes an 18-acre, one-building, 113,000-square-foot planning-stage campus. Its diagram shows an initial 5 MW building and future halls; later delivery still requires permit evidence.
Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Authoritative city layer exposes permit number, issue and completion dates, status, work description, declared cost, owner, contractor, contractor address, job description, physical address and parcel. Permit issuance records authorization and declared scope; it does not prove final cost, completion or operation.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for city-recorded permit fields. Contractor identity is resolved separately when the permit lists only a person and address; issued status is not completion.City records show grading and NPDES work, a $23 million 37,066-square-foot data-center building permit, underground medium-voltage and telecom, temporary power, building electrical installation and 2026 DC BLOX signage. Most records remain issued rather than completed, so Gridwork classifies the site as active fit-out—not operating.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for the six cited permit records and declared scopes. Valuation is permit-reported, contractor names may be individual license holders, and issued status does not prove completion.Company profile identifies BCEI as a Houston data-center design/build engineering firm and publishes careers@bcei.com. The MGM1 building permit names Jeremy Dreiling at BCEI's 10400 Rodgers Road address; Gridwork treats the firm match as strong entity resolution while keeping the project role qualified because the permit names the license holder, not the company.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyExact permit name-and-address resolution is strong, but the public permit does not print BCEI's company name. Recheck the contractor-of-record field or owner disclosure before treating BCEI as an unqualified general-contractor award.Official company site identifies Jeff Luca as president and publishes the same Powder Springs headquarters carried by MGM1 temporary-power and building-electrical permits. This resolves Luca Electric as an active electrical contractor at the site; the public permits do not disclose crew count or package value.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for company identity through exact name and address matching to city permits; scope and status remain limited to the cited permit descriptions.City agenda separately identifies DP-2025-004 for DCB Montgomery LLC / DC BLOX at Bill Joseph Parkway and DP-2025-006 for CLOP Montgomery AL LLC on Perimeter Parkway. The agenda proves two filings and hearings, not either disposition or construction start.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.Official agenda records CLOP Montgomery AL LLC's request for a special exception to build an electrical substation on the Perimeter Parkway project parcel. Agenda placement proves the application and hearing, not final approval, energization or data-center construction.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.Issued city records cover grading, a $30.585 million 61,544-square-foot building, a 5 MW Phase 1 electrical package, plumbing, temporary job-trailer power and 2026 cooling/mechanical work. The records name CLOP Montgomery AL LLC, call the temporary-power job Oppidan Data Center and identify permit contacts for Caddell, Wayne J. Griffin Electric, AL-CLY Plumbing and Hardy.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for the six cited permit records, declared value, size and 5 MW Phase 1 scope. Permit issuance is not completion; the tenant and total build-out remain undisclosed.Official company page publishes Caddell's 445 Dexter Avenue, Suite 11000 headquarters—the exact address on the CLOP building permit—and routes applicants to current openings. The address match resolves the permit contact to Caddell; it does not disclose a project-specific requisition or subcontract package.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for entity resolution and the current Caddell intake route. A role is not CLOP-specific unless its posting names Montgomery, Oppidan, CLOP or the Perimeter Parkway worksite.Official board lists current Alabama apprentice, electrician, foreperson and project-engineer intake plus a debt-free NCCER apprenticeship. The permit's Mike Irby contact and 296 Cahaba Valley Parkway address resolve to Griffin's Pelham office; no posting names the CLOP project.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for current statewide Alabama intake and company identity. Openings are regional signals until employer confirmation ties a worker to 6220 Perimeter Parkway.Official employer page lists apprentice, journeyman and gas-fitter opportunities. Founder Albert Lee Hagler and the Alton address resolve the plumbing permit contact to AL-CLY; the hiring page is statewide and does not assign applicants to the Oppidan site.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the live company intake and permit entity match. Treat all three openings as regional until the employer confirms a project assignment.Official employer page publishes current openings and a general application at 350 Industrial Drive. The CLOP mechanical permit explicitly says the cooling systems are furnished and installed by Hardy and names a contractor at that exact address.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for Hardy's named mechanical scope and official application route. Individual openings and crew assignments can change without notice.Meta's original announcement identifies a company-owned and operated 715,000-square-foot campus, more than $800 million of investment, roughly 100 operations jobs and more than 1,000 peak construction workers. It directs construction inquiries to Hensel Phelps.
Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Meta adds two buildings and updates the campus to nearly 1.3 million square feet and more than $1.5 billion, with more than 1,000 skilled tradespeople at peak and more than 100 future operations jobs. The disclosure does not provide IT MW.
Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.The contractor directly confirms Meta awarded Hensel Phelps the Montgomery campus, repeats the original 715,000-square-foot and $800 million-plus scope and states an expected end-2026 completion. Meta's later expansion and city permits supersede the original size while the contractor relationship remains current evidence.
Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.City records show 2024 grading; DCB1 and DCB2 building and electrical work; renewed 2025 permits; two $330 million, 144,000-square-foot expansion buildings; 2026 erection, mechanical and electrical packages; and continuing grading through August 2026. The mixed building and MEP activity supports a multi-building construction classification, not an operating-status claim.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for city-recorded permit fields and named license contacts. Declared valuations are not audited spend, individual permits may be revisions, and active construction does not establish turnover or operation.Plateau publishes mission-critical sitework capability, an active field-career intake and its 375 Lee Industrial Boulevard shop. Its staff page identifies Sean Whitaker as a senior project manager; the same name and address appear on Meta's 2024 grading permit.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for entity resolution and the official careers route. The permit establishes the grading contact; it does not disclose Plateau's full subcontract value or present crew size.Official site publishes electrical project-manager, journeyman and low-voltage career paths, a registered NCCER apprenticeship and the 2830 Commerce Boulevard office. That exact address and Marathon project manager Jamie Stephens appear on Meta electrical permits.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for entity resolution and current career routes. The city permits establish electrical work, but individual postings remain regional unless they identify the Meta Montgomery site.Clayco's official mission-critical page publishes its 8640 Evans Avenue headquarters and career, subcontractor and vendor routes. Meta's 2025-26 expansion permits name Matthew Drobak at that exact address, resolving Clayco as the expansion-building contractor while the page does not name the confidential client.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for exact permit-to-company address resolution and active mission-critical capability; the contractor page itself does not name Meta Montgomery, so scope stays bounded to the cited permits.Official site confirms the 3153 Bellwood Drive company address and HVAC, plumbing and piping capability. Meta's 2026 mechanical permit names Joseph D. Martin at that exact address. RJ currently says it is not accepting applications, so Gridwork exposes the contractor relationship without an active-opening count.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for exact company resolution and the no-current-intake status observed on August 28, 2026. Recheck weekly because employment status can change.Industry directory reports a planned single-story 61,554-square-foot Montgomery data center attributed to Oppidan / Connect. The city filings establish the project parcel and entity, but the reported area still requires a building permit or owner project page before it is treated as filed scope.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyQualified directory record; reconcile the building area, end user, capacity and status against the city permit file or a named owner disclosure.Official company roster identifies Dylan Rusk as an Oppidan developer and names dedicated data-center development, preconstruction, construction and operations staff. Combined with Montgomery's agenda naming Rusk as the CLOP presenter, this resolves Oppidan's project relationship but not the undisclosed tenant.
Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.City agenda records a final-plat approval request at Bill Joseph Parkway and Wasden Road. A meeting-calendar entry is not treated as proof that the plat was approved.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.Current Montgomery pathway covers electrical principles, National Electrical Code, residential and commercial wiring, controls, transformers and PLC applications; no DC BLOX placement agreement is disclosed.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.AIDT lists the Montgomery Regional Workforce Training Center as a local route for entry-level, upskilling, two-year-college and K-12 workforce training. Current data-center-specific cohorts and seats are not published.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Current owner page confirms groundbreak and site preparation beginning in September 2024 at 1726 Farmer Road, shows dated construction images through October 2025 and markets four data centers totaling 747,787 square feet and 154 critical MW. This current configuration is narrower than the county's seven-building approved-campus description.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.The contractor's project page directly identifies Evans as DC BLOX's design-build contractor in Conyers and describes ATL2-A as a single-tenant building with 2 MW fitted on day one, an 8 MW cold-dark shell, N+1 electrical and cooling, a lift station and an offsite sanitary force main. It documents the first building, not every future campus package.
Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Evans identifies its Advanced Technology team as design-build lead for DC BLOX's Conyers campus and records its early master-planning, entitlement, design, permitting and procurement role. The announcement does not identify lower-tier trade awards or current vacancies.
Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Owner-published completion update says Building 1 at Atlanta East was completed and celebrated with Evans and the Conyers–Rockdale community. It supports physical completion of the first structure, but does not by itself establish tenant acceptance, production operation or the status of later campus buildings.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the owner's stated Building 1 completion milestone. Commissioning, tenant acceptance and live IT load still require separate evidence.Georgia's issued-permit index records the final SIP permit on February 26, 2025. The linked narrative covers six Caterpillar 3516E emergency generators staged across 2025–2028, says construction began in October 2024 and anticipates final installation and operation in November 2028. Emergency-generator nameplate is not critical IT load.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for permit number, issuance date, regulated equipment and the applicant's installation schedule. An air permit does not establish building occupancy or IT operation.EPD granted ATL2's State-waters buffer variance subject to erosion controls, Rockdale land-disturbance conditions and prior USACE Section 404 authorization. The approval governs specified buffer impacts; it is not a blanket construction or occupancy permit.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the granted variance and its conditions. Compliance and separate federal/local authorizations must be tracked independently.The final regional review records a 68.41-acre ATL2 plan at 1726 and 1830 Farmer Road with three two-story buildings totaling 1,016,828 square feet, a substation and 30/80/40 MW building labels. Those planning labels are not audited critical-load commitments and differ from the owner's later four-building configuration.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyHigh for the filed 2024 plan and review comments. The plan is a historical design state and must not override newer owner or permit records without reconciliation.UES directly identifies DC BLOX as its client and documents geotechnical evaluation, slab/subgrade recommendations, tilt-wall and foundation inspections, civil-improvement inspection and code-compliance oversight for the 10 MW first phase. Its 85,000-square-foot area differs from Evans' 78,000-square-foot completion post and is retained as a source discrepancy.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for UES's own scope and client relationship. Area and phase labels require reconciliation with owner, contractor and permit records.Industry-association project profile identifies Evans as general contractor and Martin Concrete Construction as concrete contractor and supplier for the 77,000-square-foot, 55-panel ATL2-A structure. The profile is useful project-team evidence but remains a member-submitted association record rather than a county permit.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyQualified team roster from a recognized industry association. Reconfirm Martin's package against an owner, contractor or permit disclosure when available.Official contractor route covers company openings and field, project-management, estimating and safety internships. No current listing in this evidence cut names ATL2-A or Conyers.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the official intake route. Any project assignment requires employer confirmation.Official national board for engineering, materials testing, inspection and technician roles. Georgia openings are regional signals and are not assigned to ATL2-A without a named worksite or employer confirmation.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for live postings at observation time; project assignment and availability can change without notice.State notice and Terracon's attached request identify a separate 52.84-acre, nine-parcel ATL03/Pippin site west of Farmer and Lester Roads with three buildings, a substation, five ponds and associated roads and parking. The applicant estimated regulated construction for October 2026 after 401/404 authorization; the notice is an application record, not approval or evidence that work began.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed scope, parcels, consultants and applicant schedule. Authorization, land control, local permits and actual mobilization remain unresolved.Official Georgia board includes environmental, NPDES, geotechnical, inspection and materials-testing roles. No posting in this cut names ATL2, ATL3 Pippin or DC BLOX, so the route is regional only.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for live Georgia postings at observation time; exact project assignment is unverified.Official board covers civil/site, water-resources, field and design roles across the firm's footprint. The ATL3 plan establishes project work, but no current posting is assigned to the Pippin site.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for current official openings; exact DC BLOX assignment requires employer confirmation.Official staff report identifies DC BLOX Atlanta East LLC as applicant and owner for 1726 and 1830 Farmer Road, records a 68.41-acre undeveloped site and recommends denial of a parking-location variance. The staff recommendation is not treated as the Board of Adjustments' final disposition.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.State air-permit advisory records DCB Atlanta East LLC's application to construct a new data center at 1726 Farmer Road. An application under review is not proof of permit issuance or construction completion.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.State advisory records application 29932 for construction and operation of 97 diesel-fired emergency generators rated at 3 MW each at the Atlanta East address. Generator nameplate is emergency equipment capacity and must not be represented as critical IT load; issuance remains unresolved in this evidence cut.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.County agenda identifies DC BLOX as applicant for 71.5 acres at 1726 and 1830 Farmer Road, with land-use, rezoning and substation special-use requests. Agenda placement is evidence of application, not disposition.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.Adopted ordinance redesignates 1726 and 1830 Farmer Road from Medium Density Residential to Office Institutional / Technology Park for a DC BLOX data center.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.County budget identifies a $250 million Phase 1 data center by DC BLOX as recent economic activity. The figure is a county-reported phase estimate, not an audited spend-to-date value.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.County fact sheet says the approved DC BLOX Farmer Road campus has seven planned buildings, its first phase is being built, and the completed site is expected to support 50–60 staff. It also records the 2026 county moratorium; the seven-building approval and current owner-marketed four-building configuration must be reconciled on refresh.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.Current regional program covers industrial wiring, motors, controls, PLCs, instrumentation, electronics, mechanical systems, pumps and piping. It is a skills pathway, not a DC BLOX placement guarantee.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Official regional register lists the Conyers career center and job-seeker, training-provider, recruitment and employer upskilling services. Individual results require employer and worksite verification.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Current owner page locates Atlanta West at 1701 North River Road and markets three data centers across 100 acres, 1.37 million square feet and 200 critical MW, with one remaining 498,000-square-foot, 80 MW building. Its 'operational & in development' label is campus-wide and does not enumerate each building's acceptance or live IT load.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for the owner's current marketed campus configuration, address and coordinates. Aggregate operating/development language does not prove each building is live, and current scope must be reconciled with the two-building air permit and older 55-acre plan.Original owner announcement records a 55-acre, 750,000-square-foot, twelve-data-hall plan, more than $1.2 billion in expected capital investment, 180 MW of committed gross power and Evans as design-builder with DLB Associates, Corgan, Thomas & Hutton and Bennett & Pless. It is a historical scope, not the current 100-acre campus state.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyHigh for the original 2023 plan and named design team. The Q3 2025 customer-move-in target and original dimensions require later milestone corroboration and are superseded where the current owner register differs.Owner financing release says the loan supports a 120 MW Douglas County data center plus 80 MW of expansion capacity available as early as 2027. Financing capacity is not spend-to-date, and the release does not establish building turnover.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the closed financing amount and stated financed capacity. Do not treat loan proceeds as audited construction spend or the 2027 availability target as completion evidence.City register records a $373,377 retaining-wall permit at 1701 North River Road with Reinforced Wall Systems LLC as applicant. The declared package value is not total campus investment, and issuance does not establish completion or current crew demand.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for permit number, issue date, exact address, applicant and declared value. Closeout, subcontract tier and current staffing require separate evidence.City register records a $9,821,480 electrical permit at 1701 North River Road with Cleveland Electric Company. This exact-address record verifies the contractor relationship; it does not prove the employer's current Lithia Springs opening is assigned to Atlanta West.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for permit number, issue date, exact address, contractor and declared value. The permit does not disclose crew size, package completion, building assignment or requisition assignment.City register records Evans General Contractors on a 499,444-square-foot commercial new-construction permit at 1701 North River Road. The register reports a zero-dollar declared value, so Gridwork uses the floor area and contractor but does not infer package cost.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for permit number, issue date, exact address, contractor and permitted area. The zero-dollar field is retained as reported and is not evidence that the work had no cost.City register records Evans General Contractors on a separate 128,000-square-foot commercial new-construction permit at 1701 North River Road with a $100 million declared value. The relationship between this package and the 499,444-square-foot permit remains unresolved.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for permit number, issue date, exact address, contractor, permitted area and declared value. Do not combine floor areas or values into a campus total until package and building overlap is reconciled.Official company site describes an Alpharetta-based retaining-wall contractor specializing in MSE, cast-in-place and culvert systems with in-house crews. It exposes company contact but no public requisition board or Atlanta West staffing count.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for company identity and capabilities. The city permit, not the marketing site, establishes the exact Atlanta West relationship; current hiring remains unverified.Issued-permit index and narrative cover a two-building data center at 1701 North River Road with 76 emergency generators: 60 rated 3.0 MW and 16 rated 2.5 MW. The narrative records January 2024 site work, corrects building construction from 2027 to 2025 in its addendum and schedules generator installation from November 2025 through August 2027. Generator nameplate is not critical IT load.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the issued permit, regulated equipment, fuel limit and applicant schedule. Installation dates are planned dates in the permit record, and an air permit does not establish actual commissioning, occupancy or live customer load.County minutes record DC BLOX assigning project rights to wholly owned DCB Atlanta West LLC, a 0.4-acre public cul-de-sac conveyance and unanimous acknowledgement of amended bond and tax-incentive documents. The minutes do not disclose construction completion or a current building count.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyHigh for the entity assignment and board action recorded in adopted minutes. The underlying incentive schedules and final bond exhibits should be refreshed if the county publishes them separately.Authority minutes approve security and estoppel documents requested by DCB Atlanta West for a construction loan under the DC BLOX Project Series 2023-A bond transaction. The action corroborates active financing, not an amount funded or a delivery milestone.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the recorded resolution. Recheck later authority minutes for amendments, releases or project updates; financing authorization is not proof of construction completion.Supplier case study directly identifies The Outside Line Company as the DC BLOX West medium-voltage subcontractor and State Electric as material supplier. It records a seven-person crew completing 260 terminations across metering, distribution and 26 transformer cabinets over three weeks, followed by a zero-comment client QA/QC inspection.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the firms' own completed package, crew size and equipment count. The case study does not identify a general electrical contractor, contract value, building number or current onsite headcount.Official UKG posting remains open for a full-time Safety Manager working in Lithia Springs and requiring industrial-construction experience, OSHA 30 and OSHA 510. The official title does not name DC BLOX; third-party job indexes add a DC BLOX West label, so Gridwork retains the opening as a qualified market-level signal rather than a direct project match.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · qualified accuracyHigh for employer, live status, role and Lithia Springs work location. Project assignment remains unverified because the official posting does not name DC BLOX or 1701 North River Road.Official engineering career route for the Atlanta West design partner. Current openings are national or office-based and must not be presented as campus assignments without employer confirmation.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the official intake route and live employer openings; exact Atlanta West assignment is unverified.Official architecture and design board for the Atlanta West design partner, including Atlanta and data-center practices. No current requisition in this evidence cut is assigned to DC BLOX West.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the official hiring route; project assignment requires employer confirmation.Official structural-engineering board for the Atlanta West design partner with Atlanta, BIM and engineering routes. Current openings remain regional unless the employer names the campus.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the official hiring route; exact DC BLOX assignment is unverified.WGTC opened a hands-on datacenter training lab at its Douglasville campus with Microsoft support, mentorship and IT career pathways. It is a strong regional talent route but no DC BLOX placement agreement is disclosed.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the academy, location and Microsoft partnership. Employer placement, cohort capacity and DC BLOX hiring linkage remain unverified.Official register lists the Douglasville center at 5903 Stewart Parkway with job-search, training and employer services. Referrals require employer, worksite and project verification.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for center location and services. It is a navigation route, not evidence of a DC BLOX partnership or placement outcome.Current operator sheet identifies ATL1 at 375 Riverside Parkway, reports 102,421 square feet, 81.5 MW utility capacity, 9.2 MW UPS capacity, 24/7 on-site staffing and 14 connectivity providers. These figures conflict with the operator's 2024 sheet and require building/suite reconciliation.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for current operator identity, address and published configuration. Utility capacity is not equivalent to live IT load, and the changed area/power figures require clarification before longitudinal comparison.County business register records 375 Riverside Parkway A LLC at suites 125, 135, 145 and 150 and 375 Riverside Parkway B LLC under the operator's Coppell headquarters. It supports active local entities, not employment or commissioned-load counts.
Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · high accuracyHigh for registered entities, addresses and filing month. The register does not establish ownership, headcount, suite utilization or capacity.Current public address-range geocoder matched the operator-published address and returned representative point -84.582821, 33.743617. The point locates the address range, not a surveyed building centroid.
Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracySuitable for map placement at street-address scale. It is not parcel geometry or a surveyed facility coordinate.Official operator route links to current openings. No requisition in this evidence cut is normalized as an exact ATL1 or Lithia Springs vacancy.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · qualified accuracyHigh for the hiring route; current exact-site vacancy count remains zero until the linked ATS is fully enumerated and location-matched.Current owner page identifies the operating 1700 North River Road facility at about 205,000 square feet with 22.5 MW critical power, 34 MW standby generation and 25 MW cooling.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for owner-published address, design and service configuration. Critical-power design is not a disclosure of customer load or utilization.Current owner page identifies the operating 1750 North River Road facility with 36 MW critical-load UPS capacity, high-density and liquid-ready infrastructure.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for owner-published address and design configuration. Published UPS capacity does not establish current energized customer load.City register records Brasfield & Gorrie on two commercial alterations at 1700 North River Road: $40 million / 89,670 square feet and $20 million / 204,704 square feet. Gridwork combines the declared values to $60 million but does not add the floor-area fields because the scopes may overlap.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for permit numbers, issue dates, exact address, contractor, declared values and reported floor-area fields. Package overlap, closeout and relationship to the owner's roughly 205,000-square-foot facility area require reconciliation.Official employer route exposes current jobs plus mission-critical, trade, student and entry-level pathways. No current stable requisition in this cut names 1700 North River Road or Flexential Douglasville 1.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the official hiring route and employer pathways. The city permits establish the project relationship; current project assignment still requires an employer-named worksite.City register records Corgan Associates on a partial-demolition permit at 1750 North River Road with a zero-dollar declared value. The record establishes early alteration activity but does not disclose demolition area, cost, completion or current staffing.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for permit number, date, exact address and applicant. The zero-dollar field is retained as reported and is not evidence that the work had no cost.City register records Corgan Associates on a 326,751-square-foot commercial alteration at 1750 North River Road with a $165 million declared value. The permitted area differs from the owner's 358,000-square-foot gross facility figure and is kept as a separate scoped field.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for permit number, date, exact address, applicant, declared value and permitted area. The permit is not audited spend-to-date, facility gross area, final inspection or occupancy evidence.Owner announcement reports acquisition of Douglasville 2, describes it as a 358,000-square-foot, 36 MW facility and says Douglasville 1 had been acquired in 2023. It establishes real-estate control, not workforce headcount.
Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · high accuracyHigh for transaction disclosure, addresses and operator-published facility scope. Customer utilization and building-level staffing remain undisclosed.Flexential identifies a phased DigitalOcean GPU deployment across two connected halls at Douglasville 1. The announcement does not disclose local jobs or customer-utilized MW.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyHigh for named facility and customer deployment relationship. Deployment completion, utilization and hiring effects are not quantified.Flexential names CoreWeave as a customer in its new Douglasville facility and reports a 9 MW allocation to the Georgia deployment within an 18 MW two-market agreement. The exact building is inferred as Douglasville 1 from the 2023 campus chronology and remains labeled qualified.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · qualified accuracyHigh for customer, metro and Georgia allocation. Exact suite, building and current utilized load require confirmation.Official operator careers route covers data-center operations and technical roles. The linked Greenhouse board currently includes an exact Las Vegas North technician opening and a separate multi-city customer-success role; neither is reassigned to Douglasville or Phoenix.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · qualified accuracyHigh for the employer route and current Greenhouse inventory. Facility assignment is direct only where the requisition prints the owner location; multi-city roles remain regional.Current official requisition assigns a Data Center Technician I to NV – Las Vegas North, lists $19–$21 per hour, accepts a high-school diploma or equivalent with 0–4 years of experience, and describes four weeks of weekday training before varied shifts.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyDirect for the current title, owner location, pay, qualifications and training language. The posting names Las Vegas North but not the Lone Mountain street address; the exact facility match is supported by Flexential's separately verified two-site market register.Current official requisition lists Denver, Las Vegas, Portland and Salt Lake City as eligible locations and publishes an $84,000–$94,000 base range plus expected commission.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · qualified accuracyDirect for the role and eligible cities. It is a multi-city commercial opening, not evidence of a vacancy at either Las Vegas facility, so Gridwork preserves it only as a regional market signal.Current public address-range geocoder matched 1700 North River Road and returned representative point -84.617891, 33.728721.
Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracySuitable for address-scale map placement; not parcel geometry or a surveyed building centroid.Current public address-range geocoder matched 1750 North River Road and returned representative point -84.616202, 33.731694.
Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracySuitable for address-scale map placement; not parcel geometry or a surveyed building centroid.Primary regional-impact record identifies East Village Dothan, Eberly and NV5; eleven data-center buildings totaling 6.22 million square feet plus 66,000 square feet of flex space on 736 acres; 538.8 retained open-space acres; two substations; and the Liberty / Tyson Road site. The site plan is stamped not issued for construction.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyHigh for the 2025 filed concept, applicant, consultants, parcels and environmental / traffic review. This superseded concept was later revised and denied; it is not build evidence.County agenda records the 700-acre Tyson Road data-center application and its November 2025 deferral. It is useful hearing history, not a final disposition.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyHigh for case numbers, applicant, parcels, acreage and deferral. Later July 2026 disposition controls current status.Local hearing coverage records the later five-building, 700-plus-acre proposal and the developer's claim of 200–300 permanent jobs. Those jobs were proposed, not observed or committed hires.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · qualified accuracyStrong for the revised hearing scope and quoted applicant claim. Retrieve the final revised site plan and applicant economic exhibit before treating dimensions or jobs as primary-record facts.Industry reporting records a 4–1 county denial of the revised five-building, approximately 4.4-million-square-foot proposal and reports EdgeConneX as the developer behind the applicant. The operator relationship remains qualified pending the applicant record or EdgeConneX disclosure.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh-confidence corroboration of the July 2026 denial and revised scope. The signed decision, vote sheet and primary EdgeConneX relationship record remain outstanding.Public road geometry for Tyson Road was reconciled with Liberty Road way 613973072 and the filed DRI site plan. Gridwork uses representative point -84.889, 33.724 for the denied campus footprint; it is a digitized campus-scale point, not parcel geometry.
Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracySuitable for a denied campus-scale marker constrained by the two filed roads and I-20. Do not use for title, surveying or building-level placement.Official operator route embeds a structured Rippling board. The board exposed 37 current roles and zero results for a Las Vegas search on August 28; no role is assigned to LAS01, and none may be attributed to the denied Hickman proposal.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · qualified accuracyHigh for the current board inventory and zero Las Vegas search result at observation time. Job boards change quickly; the Hickman relationship remains secondary-reported and the project was denied.Brokerage transaction table records a November 2024 sale of 129 acres at 7800 Strickland Street for $64.7 million, with Amazon as buyer and TPA Group as seller. It is land-sale evidence, not a data-center plan, permit, construction start or operating record.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · qualified accuracyStrong for the reported address, acreage, month, price and parties. Retrieve the recorded deed and transfer-tax filing before treating the table as the controlling title record.CoStar reports that Amazon paid just over $64.7 million for a 129-acre Douglasville tract in November 2024 and names TPA Group as seller. The article says AWS did not disclose specific Georgia data-center locations and separately identifies the Echo Road / Rockhouse purchases.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · qualified accuracyUseful corroboration and essential for separating the TPA tract from Amazon's other Douglas County assemblages. It does not establish a campus scope, permit or delivery phase.AWS announces an estimated $11 billion Georgia infrastructure expansion and at least 550 high-skilled jobs across Butts and Douglas counties. The announcement names neither 7800 W Strickland nor any site-level allocation, schedule, building count or megawatt figure.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for the statewide / multi-county company commitment and described role families. Dollars and jobs cannot be assigned to this tract—or any single Georgia campus—without an allocation record.Gridwork searched all 31 city monthly permit reports from January 2024 through July 2026 for 7800, Strickland, Amazon, TPA and data-center terms. No exact-address, Amazon or TPA construction record was found. This is a bounded negative result: differently addressed, county, state, utility or unindexed permits may still exist.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for the searched city reports and date range. Absence from this index does not prove absence from every permitting authority or from records using a different project address.Historic regional-impact filing places a proposed 78.62-acre quarry and production facility at 7800 W Strickland, north of US 78, with access from W Strickland. It provides address and site-history context only; it is not evidence of Amazon's current scope.
Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · high accuracyHigh for the 2019 proposal, address, access and historic site context. Parcel boundaries and current post-sale use require current title, zoning and permit records.City redevelopment-plan parcel table lists 7800 W Strickland as parcel 190025-9 with 45.55 acres and then-current light-industrial zoning; adjacent acreage appears under separate parcel records. The 129-acre Amazon transaction therefore should not be represented as one legacy parcel polygon.
Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracyHigh for the dated parcel table. Ownership, acreage assembly, zoning and assessed value are stale after the 2024 sale and require current assessor/deed retrieval.Public road geometry places the western W Strickland terminus near the historic filed property. Gridwork uses representative campus-scale point -84.790, 33.747, reconciled with the historic DRI's north-of-rail / west-of-S Flat Rock description. Census returned no exact address match.
Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracySuitable for market navigation and distinguishing the tract from Echo Road sites. It is not a surveyed centroid, parcel boundary or building location.Current company site identifies TPA Group as a real-estate investment, acquisition and development firm with a digital-infrastructure practice. It does not publish a 7800 W Strickland project page, current role board or continuing post-sale assignment.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for company identity and service line. The sale relationship is established by transaction reporting, not this first-party page; ongoing project involvement is not asserted.Primary regional-impact record identifies TC Atlanta Development, 2912 Post Road, a revised two-building plan totaling 1,760,850 square feet on about 166 acres, a $2.2 billion filed build-out estimate and a 2027 target. It records a plan, not construction or realized investment.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the filed applicant, site, revised scope, study assumptions and target schedule. The filing does not prove construction, operator identity, commissioned capacity or spend-to-date.County agenda records the 164.7-acre land-use, rezoning and special-use requests for a data center, substation and watershed impervious-surface exception at Veterans Memorial, Mason Creek and Old Post Road after two prior tablings. The packet is an application record, not the adopted order.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for case numbers, hearing history, parcels, acreage and requested uses. Retrieve the signed decision and conditions before treating the agenda itself as approval evidence.Local reporting says commissioners approved TC Atlanta Development's revised two-building campus and substation with added conditions on February 4, 2025. The signed county order and full condition schedule remain outstanding primary records.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyStrong corroboration of the approval vote and revised building count, but the final order, vote sheet and conditions should replace this source when retrieved.Current public address-range geocoder matched the DRI address and returned representative point -84.824481, 33.727057.
Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracySuitable for address-scale map placement. It is not parcel geometry or a surveyed campus centroid.Current first-party office record confirms the 3550 Lenox Road address used in the DRI, names the local team and reports an Atlanta pipeline that includes data-center development. It does not publish a Douglas Waldrop construction start or end customer.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for company identity, office, team and current market presence. Project execution and employment must be verified separately.Official developer career route. No current requisition in this evidence cut names Winston, Douglas Waldrop, TC Atlanta Development or 2912 Post Road.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · qualified accuracyHigh for the employer route. Exact-site vacancy count remains zero until the linked CBRE system is enumerated and worksite-matched.First-party historical recruitment notice for the Douglasville civil engineer that prepared the filed Waldrop site plan. It is retained as a local talent-route signal, not a current vacancy or proof of project staffing.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for the historical role, location and employer. It is stale for vacancy status and cannot be attributed to Douglas Waldrop without employer confirmation.Official recruiting system for the transportation consultant named in the Waldrop traffic study. No current requisition is normalized as a Douglas Waldrop assignment.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · qualified accuracyHigh for the employer hiring route. Project and exact-worksite linkage require employer confirmation.Primary regional-impact record identifies 1971 Rock House Road, Taylor Mathis as developer, four buildings totaling 1,465,000 square feet on about 117 acres, an accessory substation and a 2028 target. It is a plan, not evidence of construction or operation.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for filed applicant, address, plan and target schedule. All scope and timing remain proposed until local approvals and permits are retrieved.County agenda records a 118-acre future-land-use amendment, rezoning and substation special-use request at Rockhouse and Echo Roads. The agenda does not contain the final disposition.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for applications, parcels, acreage and hearing date. Approval, conditions and subsequent permit status require the adopted minutes and orders.County case-study deck identifies T5, STACK and Rock House as three Project Lighthouse sites, reports a $10 billion minimum package and 252 committed jobs, and says Rock House construction awaits incentive execution. It separately labels TPA/AWS as complete or coming online in 2025 and ATL II colocation, Atlanta Data Center, Google, PWC and Switch as existing/operational. Gridwork treats those labels as leads requiring address-level records—not proof of commissioning. Package commitments are not assigned to individual sites.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyUseful for county program identity, local naming and aggregate commitments. Its status labels are not a substitute for deeds, permits, inspections or operator records; retrieve those and allocation schedules before assigning phase, dollars or jobs to one site.Current public address-range geocoder matched the filed DRI address and returned representative point -84.607818, 33.750447.
Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracySuitable for address-scale map placement; not parcel geometry or a surveyed campus centroid.Current owner page markets the Atlanta Keep core campus at up to 150 MW and shows a Q2 2025 Keep 2.0 expansion update. It also describes a separate 2,000-plus-acre multi-gigawatt expansion campus; planned expansion is not live capacity.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for current owner identity and published plan. The page does not disclose building-level commissioned capacity, utilized load or completion dates.Current public address-range geocoder matched the operator-published address and returned representative point -84.597431, 33.741343.
Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracySuitable for address-scale map placement; not parcel geometry or a surveyed building centroid.Owner announcement says Atlanta 1 was open and 72% committed, buildings 2 and 3 were breaking ground, later phases would add 50 MW and 35 MW, and full build-out was expected to exceed 1.3 million square feet with $2.5 billion including customer hardware.
Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracyHigh for the dated milestone and historical plan. Forecast opening dates and aggregate investment require current building-level confirmation.County page attributes a $2.5 billion Switch data-center investment to the 2017 recruitment. It is an announced aggregate, not audited spend-to-date.
Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracyHigh for the county's stated recruitment claim; the page does not provide project accounting, building allocation or current employment.Official owner ClearCompany board was enumerated across all five pages. Thirty-one current requisitions list Las Vegas as a work location; each remains a regional Switch signal because the postings do not print a Core-campus street address or building assignment.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · qualified accuracyHigh for current requisition identity, title and displayed location. Las Vegas does not by itself prove assignment to the Core campus, NAP 17–18 or a particular building.OpenStreetMap building record places 1 Switch Way at approximately -84.58727, 33.75503. The Census address-range service returned no match, so this community-map point remains a qualified placement aid.
Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracySuitable for approximate map placement and corroborated by owner-published address; retrieve parcel GIS or permit coordinates for authoritative geometry.Current operator page identifies 2480 Rock House Road, 10 MW critical power, 19,500 square feet of critical space, a 79,570-square-foot building and about 18 acres. It also lists expansion space and 24/7 support.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for current operator-published address and configuration. Design capacity does not reveal current customer load or utilization.Operator sheet corroborates 10 MW critical power, 19,500 square feet of critical space, 79,570 square feet total and an expansion area. It does not disclose live customer load or staffing.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyHigh for the dated configuration. Capacity and available expansion are not utilization or commissioned-load measures.PwC's assurance report identifies its Lithia Springs Georgia Data Center as the primary processing facility for named production environments and says PwC Technology and facilities personnel manage infrastructure and physical/environmental controls.
Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · high accuracyHigh for PwC's operating role at the reporting date. Recheck lease and facility arrangements for later changes.Industry acquisition report identifies 2480 Rock House Road, 79,682 square feet, a reported $101 million October 2021 sale and PwC as single tenant with about eight years then remaining. Recheck deed and lease records before treating these terms as current.
Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracyUseful for transaction chronology and tenancy. Dollar value, lease term and current ownership require primary deed/lease confirmation.T5's first-party flyer describes a 130,000-square-foot, 10 MW critical-load, server-ready multi-tenant facility with 24/7 operations and future expansion. It is historical configuration evidence and requires current building-level reconciliation.
Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracyHigh for the historical marketed configuration. Current area, power, occupancy and relation to later ATL068/ATL078 construction require updated owner or permit records.State notice names Amazon Data Services as applicant for ATL 088 off Rock House and Echo Roads, provides the representative coordinate 33.7420, -84.6049 and records 84 acres of proposed disturbance with 769 linear feet of permanent buffer impacts. It is an application notice, not construction approval or an operating record.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for applicant, project identifier, filed location and environmental scope. Proposed disturbance and impacts require the approval record and later construction evidence.EPD's revision corrects a scrivener's error in the June 6 approval and confirms ATL 088 is in Douglas County. The variance authorizes the filed buffer impacts subject to eight conditions and a five-year completion window; it does not replace federal, local or other state permits.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyHigh for the approved buffer variance, corrected county and conditions. This authorization alone does not establish a building permit, occupancy or operation.The December county register records issued permits 2502498-DC and 2502499-DC for soil-nail retaining walls 1 and 4 at 2341 Echo Road and names JE Dunn Construction. The register reports no declared value or wall area for these two records.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for issued permit numbers, address, scope and contractor. Retaining-wall permits establish early construction activity, not the main building's completion.County register records an issued commercial building permit at 2341 Echo Road for ATL 088 and an exterior equipment yard: 414,000 square feet, $310 million declared value and JE Dunn Construction as contractor. The declared value is not audited spend-to-date or total campus investment.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the issued permit, address, area, declared value and named contractor. It does not establish inspections, occupancy, commissioned power or operating status.County register records an issued commercial electrical permit at 2341 Echo Road for service panels, fixtures and floodlighting and names Lin R. Rogers / Rogers Electrical Contractors. The line repeats 414,000 square feet and publishes no separate declared value.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for permit date, address, scope and contractor. It does not disclose package value, crew size, completion or energization.County register records an issued retaining-wall permit for ATL 088 at 2341 Echo Road with a $413,350 declared value and Contour Retaining Walls as contractor. The tabular extraction reports 19,774 square feet; confirm the field definition against the permit file before treating it as wall face area.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for the permit, address, value and named contractor; qualified for the extracted 19,774-square-foot field because the county report does not clearly label its dimensional meaning in search text.Official location search exposes current controls, engineering-operations, network-installation, infrastructure-delivery and technician roles naming Lithia Springs or the Douglasville/Lithia Springs market. No requisition in this cut names ATL 088 or 2341 Echo Road.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for live requisitions, locations and compensation at observation time. All remain regional until Amazon confirms an ATL 088 assignment.Official paid Lithia Springs requisition describes a 12-month work-and-training program for data-center operations technicians with a published $23–$40 hourly range. It is a local AWS pathway but does not identify ATL 088 as the assigned facility.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the current role, duration, location, requirements and compensation. Cohort seats, start date and facility assignment are controlled by Amazon and can change.Amazon documents no-cost fiber installation and repair training hosted with West Georgia Technical College and Southern Crescent Technical College. The page establishes the program relationship but does not publish the next WGTC cohort date, seat count or ATL 088 placement agreement.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the completed Georgia training activity and partners. Current enrollment and project assignment require direct reconfirmation.Official career route covers craft, early-career, project-management and construction-supervision openings. The county permits verify JE Dunn at ATL 088, but no current requisition in this evidence cut names 2341 Echo Road.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the official hiring route. Exact project assignment requires an employer-named worksite or hiring confirmation.Official company site links the employer's current career intake for construction, service, maintenance and lighting work. The county electrical permit verifies the ATL 088 relationship; current Georgia roles still require project confirmation.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the official employer intake and verified permit relationship. A metro or Georgia opening is not automatically an ATL 088 assignment.County agenda identifies T5 Data Centers as applicant for an 80-acre data-center rezoning across Trae Lane, Douglas Hill Road and Factory Shoals Road. It establishes the original tract and applicant, not final approval, construction, tenancy or delivered capacity.
Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · high accuracyHigh for the filed applicant, location, parcels, acreage and requested use. The agenda contains apparent OCR/date errors and does not itself prove disposition or execution.Historical owner marketing describes an 80-acre Atlanta III campus with 217 MW total design capacity, a 19.8 MW initial build and feeds from the Grover Lake and Factory Shoals substations. These are dated design and availability claims, not commissioned load or current tenant capacity.
Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracyHigh for what T5 marketed in August 2021; qualified for current scope and delivery because the flyer is historical and its availability date has passed.T5's current portfolio groups Atlanta III with pre-leased sites under construction. The page supports current phase classification but does not expose building-level turnover, tenant identity, live load or a completion date in accessible text.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for T5's current under-construction classification. Building count, schedule and capacity require supporting project records.State narrative says Amazon plans two new co-located campuses at 1456 Trae Lane under ATL068 and ATL078, with 188 diesel emergency generators: 180 critical, six house, one booster-pump and one security unit. Generator count and nameplate ratings are not IT capacity or energized utility load.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for applicant, addresses, proposed campuses and equipment schedule at filing. It is application evidence and does not establish completed installation, occupancy or commissioned load.The state draft permit covers construction and operation of the two co-located campuses and 188 emergency generators. Its published copy has a blank issuance date, so Gridwork treats it as proposed until a signed final permit is retrieved.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for proposed permit number, scope, applicant and address. Not evidence of final issuance because the retrieved document is explicitly a draft with no issuance date.Trade coverage quotes T5's public topping-out announcement and reports final steel on an Atlanta III building. Reported 300 MW, one-million-square-foot and five-building full-build figures remain secondary until reconciled to a current T5 plan or permit set.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyStrong corroboration for the June 2025 structural milestone; qualified for full-build scale because the retrieved primary portfolio does not expose those figures in accessible text.T5's public Lever feed returned six current Atlanta records across construction leadership, logistics, preconstruction, safety and recruiting. The postings support T5's regional delivery platform and headquarters; none names Atlanta III, ATL068, ATL078, Trae Lane or Factory Shoals Road.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for live titles, locations and direct application URLs at observation time. Campus assignment is unresolved and every record requires daily availability refresh.County agenda identifies Grind Capitol LLC as applicant for rezoning and a special-use permit for a data center exceeding 50,000 square feet on 13.5 acres across land lot 175 parcels 7, 28 and 29 on Echo Road. The record is treated as a precursor / parcel-assembly signal within the later ATL 088 envelope, not a separate campus, pending deed or site-plan confirmation.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for applicant, parcel set, acreage and requested use. Qualified for relationship to ATL 088: corridor, address proximity and later project envelope align, but the retrieved agenda does not name Amazon or record a transfer.County tax notice resolves one Grind filing parcel to 2421 Echo Road and identifies the owner as of January 1, 2025. It is a dated ownership snapshot and predates a May 2025 reported sale; current ownership and grantee require deed retrieval.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the county's parcel-to-address and dated owner record. It is not a current title report and does not establish the buyer or project assignment after January 2025.Federal address match places 2421 Echo Road at approximately 33.738088, -84.601164, about half a kilometer from ATL 088's representative state-filed coordinate. Proximity supports entity review but does not replace parcel geometry, a survey or a deed chain.
Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracyQualified for parcel-level boundary analysis because geocoded address points are representative locations, not surveyed tract geometry.The company's current site identifies it as an Atlanta commercial-real-estate developer with a data-infrastructure practice. It does not list the Echo Road proposal, publish a project roster or expose a public jobs board.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for company identity, location and stated business line. No current project status or employer demand can be inferred from the general company page.STACK's current Atlanta portfolio identifies ATL02 in Lithia Springs as a 160 MW campus. The accessible owner page does not disclose how much capacity is energized, leased, commissioned or still under construction.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for operator, campus identity, location and marketed scale. Treat 160 MW as campus capacity, not verified live IT load.Regional and county filing identifies SI ATL02A LLC c/o STACK, IPI Atlanta II LLC and Bohler; plans two three-story buildings totaling 878,886 square feet on 44.3 acres at 800–808 Factory Shoals Road, estimates $380,930,665 at build-out, 0.031 MGD water demand and a May 2026 completion target. All figures are application estimates, not audited delivered results.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for filed developer, owner, consultant, site plan, estimated value, utility assumptions and target schedule. Current built area, spend, load and occupancy require later permits and inspections.County agenda carries the 44-acre SI ATL02A request at 808 Factory Shoals Road after it was tabled from January 2024. The agenda verifies the hearing trail but not the final adopted vote or every condition.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for applicant, address, acreage and requested substation/data-center uses. Retrieve adopted minutes or the ordinance for final disposition and conditions.State approval authorizes SI ATL02A's filed stream-buffer impacts for sanitary-sewer improvements subject to six conditions and a five-year completion window. It names ECS Southeast on the project correspondence and requires any county land-disturbance permit to carry the conditions.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyHigh for applicant, authorized buffer work, conditions and ECS correspondence. It is not a building permit, occupancy record or proof of completed sewer service.County agenda identifies SAC III Acquisitions as applicant for a 37-acre data center across Factory Shoals and Linda Lane parcels. It is retained as a qualified adjacent expansion / assembly signal for the ATL02 research envelope; the filing does not name STACK and the final disposition remains unresolved.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for the separate applicant, parcel set, acreage and requested use. Qualified for connection to ATL02 until ownership, affiliate status, approved site plan or project naming is confirmed.Official employer route links STACK's North America requisition board. No current record in this evidence cut names Lithia Springs or ATL02, so national, Denver, Alpharetta and Santa Teresa roles are not assigned to this campus.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the official hiring route. Exact ATL02 demand remains unverified until a requisition names Lithia Springs, ATL02 or 808 Factory Shoals Road.Official career route for the civil and site-plan consultant named throughout ATL02's DRI. No current requisition is linked to 808 Factory Shoals Road in this evidence cut.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the employer route and filing relationship. Office or Atlanta roles are not project assignments without employer confirmation.Official career route for ECS Southeast, copied on ATL02's issued state buffer approval. The record establishes environmental / geotechnical correspondence, not a continuing construction package or exact-site vacancy.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the employer route and state-record relationship. Current scope, contract value and project staffing are undisclosed.County zoning packet identifies Big Power Developments 5 LLC as applicant for a data center and electrical substation at 2250 Rockhouse Road. It records land lot 947, parcel 1, 36 acres and commission district 2. This is an application record, not an approval, permit or construction start.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for applicant, address, parcel description, acreage and requested uses as filed. The packet does not establish approval, ownership, an end user or executed development.Revised county packet returns the 36-acre application after a February deferral and describes a data center exceeding 50,000 square feet plus an electrical substation at 2250 Rockhouse Road. The agenda proves the matter was scheduled; it does not itself record the final vote or adopted order.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for the scheduled case, applicant, site, minimum floor-area threshold and requested uses. Final disposition requires adopted minutes, an order or another official decision record.Transcript-derived meeting report says commissioners voted 5–0 to deny the special-use request and describes a proposed five-acre substation. It is retained as qualified evidence until Douglas County publishes adopted minutes or an order; automated summaries can misstate speakers, motions or vote details.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyQualified: it reports a recorded public meeting but is an automated secondary summary, not adopted county minutes. The 5–0 vote and five-acre substation detail require official confirmation.Local report independently describes rejection of the Rockhouse Road proposal after public comment. It corroborates the reported outcome but is not the adopted county decision, so the project remains tagged for official-record retrieval.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyQualified for final legal disposition because the underlying adopted minutes or order has not been retrieved. Useful as independent corroboration of the reported denial.Commercial listing describes approximately 36.72 acres at 2250 Rockhouse Road. It is a watch signal only: listing status can lag a sale, contract, withdrawal or redevelopment and does not establish current ownership or an active data-center plan.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyQualified for acreage and current marketing status; broker listings can be stale and are not substitutes for assessor, deed, applicant or permit records.Google's current location page identifies Douglas County as an active data-center community, says the site opened in 2007, records a $300 million expansion announced in 2015 and links Georgia electrical-skills and careers routes. Its $3 billion-plus investment total covers Georgia digital infrastructure since 2003 and is not assigned wholly to this campus.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for operator, operating status, opening milestone, 2015 expansion announcement and current owner routes. Statewide investment and community figures cannot be treated as campus spend or payroll.State public notice identifies Google's data-processing and hosting center at 300 Riverside Parkway SW and records approximately 0.6 MGD of cooling-tower blowdown and filter-backwash wastewater. The permitted discharge figure is not total water withdrawal, consumption or current average use.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for facility identity, address, permit number and authorized discharge description at the notice date. Current compliance, actual flows and later permit terms require a refreshed permit record.State advisory identifies Google at 300 Riverside Parkway SW and describes the operation as a data center / internet service provider seeking synthetic-minor nitrogen-oxide limits. It verifies operating use and address, not generator count, IT capacity or current permit compliance.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for facility, address, application number and stated operation at filing. Retrieve the current issued permit before asserting equipment totals, emissions limits or expansion scope.Google reports that more than 90% of cooling water at the Douglas County facility was recycled in 2023 and describes a $42,000 Mercer University Workforce Innovation Lab grant. The report's approximately 11,000 annual jobs supported, $1.46 billion of activity and $941 million of labor income are Georgia data-center-community impact estimates for 2021–2023, not campus headcount or payroll.
Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracyHigh for Google's disclosed programs and recycled-water share; qualified for modeled statewide economic impacts, which include direct, supplier and induced effects and must not be recast as onsite jobs.Current official requisition names Lithia Springs as its sole location and covers server deployment, troubleshooting, repair and preventive maintenance. The posting does not name 300 Riverside Parkway, so it is retained as a regional Google market match rather than a campus-assigned vacancy.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for employer, title, location, qualifications, responsibilities and compensation at observation time. Exact campus assignment and continuing availability require daily recheck.County agenda identifies Stream Data Centers' request for a data center exceeding 50,000 square feet with a substation on 146 acres at Jason Industrial Boulevard and Polk Road in Winston. This is the initial application footprint, not proof of construction or the final assembled campus area.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the 2024 applicant, use request, initial parcel set and acreage. Later state and owner records describe a larger footprint, so 146 acres is retained as filing history rather than current total site area.State notice identifies SDC ATLA as a Stream affiliate and proposes up to eight data-center buildings, an onsite substation and supporting infrastructure on a 215.61-acre tract northwest of Veterans Memorial Highway and North Baggett Road. It provides the representative coordinate 33.735500, -84.810406. Certification review is not a building permit or construction start.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for applicant relationship, filed coordinate, tract, proposed building maximum and environmental-review scope. Final authorized impacts and actual buildout require issued approvals and local permits.State narrative evaluates 315 proposed Tier 2 diesel emergency generators rated at approximately 2.5 MW each, with 2027 installation dates, and a requested 99-ton-per-year nitrogen-oxide limit. Generator nameplate is backup generation—not critical IT load, utility service, energized capacity or proof all units will be installed.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for proposed equipment, ratings, installation schedule and modeled permit basis. Application scope is prospective and must be checked against the final issued permit and actual construction.State advisory identifies the facility address, application 29802 and a proposed permit for construction and operation of a data center with 315 2.5-MW emergency generators. The comment period expired May 1, 2026; this record does not establish that a final permit was issued.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for proposed permit status, address, equipment count and comment deadline. The final permit and any subsequent modification remain refresh targets.Stream's current portfolio labels ATLA in Atlanta as an in-development 274-acre hyperscale campus. The owner page does not publish current construction, building-level delivery dates, IT capacity or a tenant for ATLA.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for current owner designation and 274-acre marketing footprint. 'In development' is not treated as sitework, a permit issuance or a tenant commitment.Official company career route is active, but no stable current Winston or ATLA requisition was exposed in this evidence cut. Corporate or Atlanta-capable roles must not be assigned to the project without a named worksite.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the official employer route. Zero normalized ATLA openings means none was defensibly linked, not that Stream has no hiring anywhere.Microsoft's current community page says it is building datacenters in Douglasville, Palmetto and East Point. The page establishes current owner activity and community commitments, but does not publish Douglasville building-level turnover, energized capacity or a completion date.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for Microsoft's current statement that Douglasville remains in its Georgia build program. The page is metro-level and cannot establish which FTY01 buildings are commissioned or operating.Final DRI record describes four approximately 245,000-square-foot data center buildings totaling 980,000 square feet on 159.48 acres, with build-out projected by 2031. The filed exhibit identifies Microsoft as owner, Thomas & Hutton as site-plan engineer, A&R Engineering as traffic consultant and HRC Engineers as surveyor.
Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · high accuracyHigh for the approved 2021 development configuration and named filing team. The 2031 date is a projected build-out, and later permits govern actual construction scope and sequence.City permit register records a 245,948-square-foot industrial new-construction permit at 1601 North River Drive with a $31,255,072 declared value and Skanska USA Building as contractor. The value is one permit record, not total campus investment or audited spend.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for permit number, issue date, address, contractor, declared valuation and permitted floor area. A building permit does not establish final inspection, occupancy, commissioning or customer load.City register records Skanska USA Building on a 244,678-square-foot commercial new-construction permit at 1601 North River Road with a $32,364,350 declared value. Gridwork treats it as a separate building package, not total campus investment.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for permit number, issue date, exact address, contractor, permitted area and declared value. Building sequence, final inspection, occupancy and commissioning require separate evidence.City register records E2 Optics on an electrical permit tied to J23-0721 at 1601 North River Road. The record publishes a zero-dollar declared value and no crew count; it verifies an exact-address package, not current hiring or completion.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for permit number, date, exact address and contractor. Package scope, value, completion, subcontract tier and current staffing remain unresolved.City register records permit-named Morrison Hershfield on a $200,000 commercial alteration at 1601 North River Road. Stantec had acquired Morrison Hershfield in February 2024; Gridwork preserves the name appearing on the permit and identifies Stantec only as the current parent.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for permit number, date, exact address, permit-named firm and declared value. The record does not define design discipline, current internal team or package completion.City register records Skanska USA Building on another 244,678-square-foot commercial new-construction permit at 1601 North River Road with a $32,241,220 declared value. Together with the 2023 and 2024 records, this establishes three near-245,000-square-foot building permits, not three completed buildings.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for permit number, issue date, exact address, contractor, permitted area and declared value. Building turnover, inspections, occupancy and live load remain unresolved.Official employer route describes low-voltage IT integration, current openings and company-wide on-the-job, low-voltage, weekly safety and BICSI training. Those pathways are not presented as Microsoft- or FTY01-specific without employer confirmation.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the official employer route and company-wide training. No stable current requisition in this cut names FTY01 or 1601 North River Road.Stantec's official acquisition history records Morrison Hershfield joining in February 2024. The corporate lineage supports a current-parent label; it does not prove which Stantec team owns the later FTY01 alteration work.
Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · high accuracyHigh for corporate acquisition timing and parent identity. The city permit remains controlling for the name attached to the FTY01 package.Official current careers route for the parent of permit-named Morrison Hershfield. Georgia, buildings or mission-critical roles remain regional unless Stantec identifies the FTY01 worksite or package.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the official hiring route. Corporate parentage and a Georgia opening do not establish project assignment.State narrative identifies Microsoft FTY01 at 1601 North River Road and the initial 21-generator configuration: twenty 3,000 kW emergency generators and one 500 kW unit. Generator nameplate and air-permit status are not critical IT load or proof of operation.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for regulated equipment and facility identity. The permit authorizes construction and operation subject to limits; it does not establish actual generator installation, occupancy or live compute capacity.Application 29541 narrative records 21 generators authorized for Building 1 in 2022, 21 additional generators for Building 2 in June 2024 and a Building 3 expansion proposing twenty 3,000 kW units plus one 500 kW unit. The resulting three-building permit trail covers 63 generators; a fourth DRI building remains outside this retrieved air-permit chain.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the permit history, equipment counts and Building 3 proposal. The narrative contains the phrase 'twenty [20]' and is interpreted as 20 based on the bracketed count and GN43–GN63 sequence; installation and commissioning require separate evidence.County report states Microsoft is developing almost one million square feet for East US 3: four 245,000-square-foot technology facilities totaling 980,000 square feet on a 160-acre parcel at 1601 North River Road.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyHigh for the county's reported current development program and aggregate floor area. The report does not enumerate completed, commissioned or operating buildings.Owner fact sheet forecasts about 2.1 million construction work hours and more than 510 jobs at peak activity across Douglasville, Palmetto and East Point, plus about 50 employees per operational building. These are multi-site planning figures and must not be assigned wholly to Douglasville.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for Microsoft's regional forecast, qualified for any campus allocation. The record is not payroll, current onsite headcount, a local-hire percentage or a guarantee of 50 direct Microsoft employees per building.Official fully onsite role explicitly lists Palmetto, East Point and Lithia Springs. It is a verified Microsoft Atlanta-metro operations opening and a strong Douglasville-market signal, but the posting does not promise assignment to one building or campus.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for employer, role, live posting date and named Lithia Springs eligibility. Project assignment remains regional because three Georgia markets are listed.Official hiring route for the contractor named on Douglasville permit J22-0338. Current roles must be checked for Georgia, mission-critical scope and worksite before project assignment.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the official employer route. The permit verifies Skanska's building relationship; no current requisition is assigned to FTY01 without an employer-named location or project.Current owner page identifies ATL-01 at 1551 North River Road and markets 24x7x365 access, onsite security, N+1 power and cooling, liquid-cooling readiness and operational certifications. It does not publish total building area, critical IT MW, live customer load or remaining expansion scope.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for address, owner-presented operating services and technical configuration. Marketing availability does not disclose occupancy, contracted load or campus-wide capacity.State advisory records a proposed permit to construct, operate and maintain Aligned ATL01 at 1551 North River Road with emergency generators. The retrieved advisory does not expose the issued permit number, generator count or installation status.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for applicant, facility, address and proposed regulated activity. This advisory is not the final permit and does not establish operation or generator installation.City register records Holder Construction Group on a 281,140-square-foot commercial alteration at 1551 North River Road with a $167 million declared value. The package area closely tracks the property's reported gross area but is not treated as a new-building area or total development spend.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for permit number, issue date, exact address, contractor, declared value and permitted area. Final inspection, occupancy, package completion and current Holder staffing remain unresolved.Official employer route covers current opportunities across project management, field supervision, safety, scheduling, MEP and building technology. No current stable requisition in this cut names ATL-01 or 1551 North River Road.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the official employer route and career families. The city permit establishes the project relationship; current assignment requires employer confirmation.City register records Aligned Data Centers ATL Propco as applicant for a 47,104-square-foot commercial alteration at 1551 North River Road with a $3,992,912 declared value.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for permit, applicant, scope area and declared value. The alteration record does not establish total facility size, final inspection, tenant fit-out or total capital spend.City register records NetPlanner Systems on an electrical alteration at 1551 North River Road. The permit establishes an exact-address trade relationship but publishes no valuation, floor area, package detail or current crew count.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for permit number, date, address and named contractor. It does not prove ongoing staffing or identify the customer system being altered.Active FCC license ties Aligned Energy to 1551 North River Road and provides a representative facility coordinate of 33.7257222, -84.6182222. The radio license supports exact mapping and site activity, not power capacity or compute status.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for licensee, active grant, control-point address and filed coordinates. Coordinates identify the licensed facility area and are not a surveyed building centroid.Brokerage market report lists Aligned Data Centers acquiring the 280,140-square-foot property from The Carlyle Group for $64 million. The transaction is site-control context, not construction investment, current appraised value or facility capacity.
Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracyQualified secondary transaction record. Use deed and assessor records for controlling ownership history; do not treat acquisition price as campus capex.Official Workday board exposes exact ATL-01 maintenance and commercial roles plus multi-site operations, design, power, compliance, training, procurement and customer-delivery positions that include ATL-01.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for live requisitions and listed eligible worksites. Multi-site roles are regional until Aligned confirms assigned home campus.Official employer route for the exact-address electrical-alteration contractor. Current Georgia technology and structured-cabling roles remain regional unless the company names ATL-01.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the official hiring route. The permit verifies one ATL-01 package; it does not establish current project assignment for regional vacancies.Official council packet records Project Wisteria's $22.65 million contractual minimum investment, October 15 first reading and December 17 second reading. Draft blanks in the packet mean final enactment must be corroborated separately.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.Executed county agreement identifies DCB North Augusta LLC as the company formerly known as Project Wisteria and records Aiken County Ordinance 25-01-01 enacted January 7, 2025. It confirms the incentive entity and park structure, not construction completion.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.SCETV transcript quotes DC BLOX EVP Chris Gatch stating the company was building a $75 million network-focused data center on Atomic Road. This reported legislative testimony is strong current-status evidence but the investment conflicts with the earlier $22.65 million FILOT minimum and requires permit- or owner-level reconciliation.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyQualified transcript of attributed public testimony; recheck the underlying filing, permit or owner update before treating the stated cost or phase as final.Current owner portfolio map includes North Augusta among operating, under-construction and planned markets. The portfolio graphic does not independently disclose this site's parcel, capacity, contractor or precise phase.
Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.Current college route includes employer-led registered HVAC and industrial-maintenance apprenticeships combining paid work with technical instruction. Employer participation, intake and DC BLOX linkage require confirmation.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.Official statewide system provides job search, center navigation, training and employer recruiting services across all 46 counties. Search Aiken, North Augusta and Atomic Road, then verify every employer and worksite relationship.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.County page routes unincorporated Aiken projects to Citizenserve searches for commercial permits, development projects, parcel, address and status. The public search is reCAPTCHA-protected; no Project Wisteria or CLOP permit number was retrieved in this review.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for the county's permitting jurisdiction and available search fields; project-specific permit scope remains unverified because no result was retrieved.Local business reporting identifies Oppidan as the builder of a $32 million, 60,000-square-foot data center on the west side of Bettis Academy Road in Sage Mill Industrial Park. Construction status, capacity, employment and contractor packages still require county- or owner-level corroboration.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyQualified local reporting; recheck the FILOT, parcel, building permit and owner milestone before treating cost, area or phase as final.GLEIF-backed record identifies active Delaware entity CLOP Aiken SC LLC and its Excelsior, Minnesota headquarters address. The address aligns with Oppidan's official headquarters, supporting entity resolution without proving site control, permits or construction.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyQualified entity metadata from a GLEIF-backed mirror; legal-entity identity is strong, while the inferred Oppidan relationship still requires project-record corroboration.Statewide register separates facility, effective date, legal owner, occupant and operator. It identifies LBB01 as owned by Aligned Data Centers (Abernathy) Propco, occupied by Lambda Procurement and operated by Lambda; Fluidstack Abernathy as owned and operated by FS AB with Anthropic as occupant; and EDC AUSTIN, LLC as owner, occupant and operator of its large project effective January 9, 2026. Registration is not proof of construction, address, capacity or active hiring.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the state-published registration fields and legal roles at the observation date; corroborate site, phase, capacity and employment from permits, filings, owners and job boards.Owner announcement places the 540 MW, 313-acre, six-facility campus outside Abernathy; identifies LBB-01 as the first facility with a Q1 2027 service target; names Ryan Companies as a construction partner; and states that the multi-year buildout will create thousands of construction jobs and local vendor contracts without publishing a numeric permanent-job total.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for Aligned's announced scope, location, partner and target date; delivery, job totals and later phases require permit, inspection and updated owner corroboration.Current owner facility page publishes LBB-01 at 1498 County Road 315, Abernathy, Texas 79311 and describes its power, cooling, security and operating design. Marketing availability does not establish commissioning completion or vacancy availability.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the owner-published address and facility design at review; recheck construction, service and occupancy milestones independently.Filed quarterly report states the Abernathy joint venture was formed to construct and operate a 168 MW critical-IT campus; documents $1.3 billion of construction financing and site-preparation, design and construction-management agreements; and records TeraWulf's July 6, 2026 sale of its full 50.1% interest to Fluidstack and other purchasers.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for filed corporate, financing and ownership facts through June 30 plus the disclosed July sale; current field progress and post-sale control require newer operator or permit evidence.Anthropic names Fluidstack as its Texas and New York data-center partner and gives program-wide estimates of approximately 800 permanent and 2,400 construction jobs. Gridwork does not allocate those multi-state totals to Abernathy without a site-specific disclosure.
Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · qualified accuracyHigh for the partnership and program-wide estimates; qualified for Abernathy because the announcement does not name individual sites or allocate jobs.Official structured feed returned two current exact-Abernathy openings: Staff Electrical Operator and Staff Mechanical Operator. Older search-engine snippets with Abernathy among multiple locations were excluded because those records are no longer listed that way in the live feed.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for titles and exact location at the observation time; roles may close or change without notice and the board does not print an internal building assignment.Regional program teaches commercial and industrial wiring, power distribution, motor controls, PLCs, electrical safety and NEC practice through certificate and associate-degree pathways. No Caprock or Fluidstack placement agreement is asserted.
Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for current curriculum and credentials; project relevance is skills-based unless an employer partnership is later published.Regional HVAC pathway covers electrical systems and controls, refrigeration, airflow, heat pumps, troubleshooting and EPA 608 preparation. It is a feeder route, not a disclosed data-center placement program.
Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for current curriculum and credentials; confirm enrollment, campus and employer use directly with the college.Owner announcement identifies Lambda as the future DFW-04 occupant and says the Plano facility was under construction for high-density liquid-cooled GPU infrastructure. It does not disclose a completion date, employment count or contractor roster.
Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for the named relationship and May 2025 construction status; current phase requires later filed or owner evidence.Current owner portfolio page lists DFW-04 at 601 North Star Road, Plano, on a 44-acre campus with Tier III design, 24/7 accessibility and high-density air/liquid cooling. Marketing availability does not by itself prove fit-out completion or customer service.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for current owner-published address and facility attributes; verify delivery and occupancy through inspections, filings and later milestones.State accessibility registration covers a privately funded $120 million, 190,550-square-foot tenant fit-out at 601 North Star Road, with a June 2025 start, August 2026 scheduled completion, Aligned as owner and Corgan as design firm. Registered dates are plans, not inspection or completion evidence.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for filed scope, address, owner, designer and scheduled dates; the TABS record explicitly remains a registration rather than proof of field completion.Separate state registration covers a $120 million, 169,600-square-foot data-hall tenant fit-out at the same address, scheduled October 2025 through December 2026, with Aligned as owner and Corgan as design firm. Gridwork does not add the two $120 million registrations because package overlap has not been ruled out.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for this filed package and schedule; avoid summing it with the earlier registration until contract/package boundaries are resolved.Local 21-credit certificate prepares learners for data-center and network hardware work through hands-on infrastructure coursework and industry-certification preparation. No Aligned or Lambda placement agreement is disclosed.
Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for current program structure; employer linkage and current enrollment availability require direct confirmation.Local certificate and AAS pathways teach electrical installation, testing, troubleshooting and repair; students can earn up to 414 on-the-job hours toward Texas licensure requirements. No DFW-04 placement relationship is asserted.
Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for the college-published credentials and licensure pathway; verify current sections, prerequisites and employer use directly.Official workforce-board locator confirms a Plano center serving Collin County with job-seeker and employer services. It is a public matching route, not proof that DFW-04 employers have placed orders with the center.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for current center coverage; individual employer listings and project assignments must be verified at application time.County project hub for the 290-acre site north of the Pima County Fairgrounds. It describes a four-building first phase, up to ten buildings at full buildout, a possible 2027 first opening and economic-model estimates for construction and permanent employment.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for county-held site, agreement and process facts. Building count, timing and employment figures are plans or model outputs rather than completed deployment or verified hiring.County memo records the June 2025 specific-plan and land actions, December 2025 land-sale closing and Project Blue permit history through March 2026. The inventory includes issued site-construction, capacity-letter and related approvals, plus open or correction-stage right-of-way and revision records.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for the dated county inventory and listed permit statuses. Recheck the live permit system because corrections, withdrawals, inspections and later vertical permits can change phase interpretation.County enforcement correspondence and the contractor response identify Ames Construction at 11295 S Harrison Road under fugitive-dust permit P25FD0278. The response describes active site preparation, temporary suspension of major earthwork after loss of a water source, native-plant work and corrective dust-control measures.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for the named contractor, address, permit and May 2026 field conditions. The record proves civil/site activity, not a vertical general-contractor award or current operating status.Board memo presents a proposed agreement with Humphrey's Peak Properties covering closed-loop air cooling, renewable-energy reporting and $15 million in education and workforce donations, including an initial $5 million for STEM scholarships and trade schools.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyThe memo and attached draft are official, but this evidence cut does not establish board adoption or a fully executed agreement. Treat every listed benefit as proposed until a signed record is retrieved.Commission statement records the December 3, 2025 approval of Tucson Electric Power's special contract for Project Blue, developed by Beale Infrastructure and affiliate Humphrey's Peak Power LLC. The initial service request is described as 286 MW in the commission record set.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for commission approval and named parties. Approved service capacity is infrastructure evidence, not proof that the full load has been built or energized.Developer statement identifies Beale's Project Blue role, a planned $3.6 billion investment, more than 3,180 modeled construction jobs, TEP coordination and a possible 2027 first phase. The operating customer is not disclosed.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for Beale's role and stated plan; investment, jobs and delivery remain forward-looking until spending, payroll or operating milestones are independently verified.Official Workday board showed 101 company openings and one current Tucson-capable Project Manager record. The posting lists several Arizona locations and does not name Project Blue.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the observed official requisition. Location eligibility is regional and must not be read as a Project Blue assignment; recheck before applying.Official Workday board showed 17 current Tucson roles. Four construction, material, equipment and T&D records are normalized as regional utility signals because none names Project Blue.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the observed TEP records and displayed deadlines. The commission-approved utility relationship does not make any Tucson requisition project-assigned.Local routes include electrician, HVAC-R, plumbing and construction credentials, plus fast-track programs. The college's April 2026 center expansion adds commercial and industrial HVAC, refrigeration and heavy-equipment training.
Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for college-published programs and facilities. No Project Blue placement agreement or employer-sponsored cohort is asserted.Public workforce route for job matching, resume support, training referrals, employer services and on-the-job training in Pima County. No Project Blue employer order or placement channel is verified.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for current county services; specific openings, funding eligibility and employer participation require direct confirmation.Live city layer returned 15 data-center records with exact coordinates, addresses, planning or permit case numbers, and statuses ranging from pending planning through construction complete. It includes codenames and confidential projects that do not appear in owner press releases.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the city-published address, case identifiers and displayed status at observation time. A GIS status is not proof of current field activity, occupancy or a disclosed operating customer; query the linked cases before advancing a phase.State report names seven FY2025 pre-approved applicants and two post-approved applicants. Minimum statutory investment is reported at applicant level; actual project allocation is confidential and must not be assigned to a particular facility without corroboration.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for applicant identity and minimum statutory threshold. Certification or post-approval does not reveal a facility address, actual spend at one site, construction progress, capacity or hiring.Owner page identifies 10256 E. Elliot Road, a 102-acre Mesa campus planned for seven buildings and 240 MW, with PH1 providing 36 MW and a 24/7 in-house security and operations team.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for NTT's current published campus and PH1 specifications. The seven-building plan is buildout capacity, not proof that every building is complete or energized.Official Workday route for global data-center construction, commissioning, operations, engineering and corporate roles. No current Mesa requisition is normalized in this cut.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the official employer route. Re-enumerate daily and require Mesa or a defensible campus identifier before project matching.Owner milestone says the Mesa campus is serving traffic, supports more than 200 operational jobs, averaged 2,000 skilled trades workers at peak construction and will represent more than $1 billion when fully built out. DPR Construction and Salt River Project are named partners.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for the operating milestone and named partners. The investment is a full-buildout statement and employment counts are owner-reported baselines, not a current vacancy inventory.Owner portfolio describes an 84-acre Mesa campus planned for five data centers, 2.7 million square feet and 496 MW of critical IT load using closed-loop air cooling.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for current owner-published campus design. Totals describe planned campus capability; the city GIS separately establishes only that a permit is issued for the listed address.Official owner route for development, construction, engineering and operations roles. No exact Mesa detail record is normalized in this snapshot.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the current career route; openings need daily re-enumeration and location-level matching.Owner operating milestone identifies the 36 MW Mesa facility, Haydon Companies as local general contractor, Salt River Project as utility partner and Light Source Communications as the first network provider.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for opening, capacity and named partners as disclosed by the owner. Current staffing, vacancies and awarded follow-on packages require separate evidence.Official data sheet identifies EdgeConneX's Mesa presence on Elliot Road. The city GIS provides the current 3203 S. Hawes Road permit record; the documents are related at city/operator level without assuming a completed build.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for EdgeConneX's Mesa market presence. The data sheet and city permit do not by themselves prove current field activity or a live customer deployment at the new address.Current owner facility page identifies the 3223 S. Ellsworth Road Mesa data center and its North and South American service role. A separate company record names Weitz as construction contractor.
Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for current address and operating facility identity. The page does not publish present headcount or a complete vacancy inventory.Official Phoenix/Mesa career page and facility contact. One current sales record is visible, but no current data-center operations opening is normalized.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the official location board. An older Data Center Engineer page is explicitly outdated and is not presented as an opening.Apple reports that its Mesa global command data center came online in 2016 and began serving customers in March 2017, with operational control taken in October 2015.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for Apple's operating history. The report is a 2024 publication and does not establish current hiring or later expansion activity.Official search returned 28 Mesa-filtered records. Four current exact-Mesa data-center operations, controls, BIM and mechanical project roles are normalized; retail and unrelated records are excluded.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the four observed Apple detail records. Recheck daily because search totals and posting availability change without notice.Official company route to the current opportunity portal. No exact 3255 S. 96th Street or Mesa requisition is normalized in this cut.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the employer route; enumerate the ATS daily and require a Mesa identifier for local matching.Current 22-credit 2026–27 certificate prepares learners for entry-level mechanical, electrical and controls technician work, including PLCs, motors, power distribution, preventive maintenance and safety.
Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for the college-published pathway. Course availability, admission and employer placement require direct confirmation; no project-specific placement guarantee is asserted.City workforce center offers job search, occupational training, apprenticeships, hiring events, candidate matching and employer recruiting support in partnership with ARIZONA@WORK.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for current public services. Employer participation and project-specific job orders must be verified for each hiring event or referral.Official Arizona contractor route for craft, building, civil, internship and professional opportunities. Edged identifies Haydon as the Mesa facility general contractor; current roles remain regional unless the worksite is named.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the official career route and owner-verified relationship. Recheck current positions daily and verify assigned project before applying.Official utility route spanning engineering, skilled trades, power systems, IT and operations. SRP is named on the Meta and Edged Mesa projects; no current requisition is assigned to either campus in this cut.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the current utility career route. Project matching requires the employer to name a worksite, project or defensible infrastructure package.City inventory names Compass, Microsoft, Stream and Vantage in Goodyear. Gridwork uses it as jurisdiction-level discovery evidence, then checks current owner and agreement records facility by facility.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyStrong for companies publicly identified by the city, but the page is not a complete parcel or permit ledger and does not prove current phase by itself.Live city portal marks the Compass agreement Executing from July 2019 through July 2034. The portal tracks agreement administration, not building completion.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for agreement status and dates. The record does not measure construction percent, operating capacity or current hiring.Live city record describes Microsoft-owned water, wastewater and industrial-discharge infrastructure and an executing agreement through 2030. A portal progress percentage is administrative, not physical completion.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the agreement scope, status and dates; qualified for field phase because the city portal is not a construction-progress system.Live city record covers roughly 145 acres southeast of Citrus Road and Indian School Road, an executing agreement through 2040 and current on-track administrative status.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for filed location, agreement status and described infrastructure conditions. It does not establish installed IT load or building-by-building completion.Council packet places the campus on 279 acres between Broadway and MC-85 and records PHX11 nearing completion while PHX12 permitting was requested in 2023.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the 2023 filed boundaries and amendment context. Historical construction language must not be presented as the current building phase without a later record.Current owner page says Microsoft operates datacenters in El Mirage and Goodyear, is building new West Valley facilities and projects 763 employees and contractors across operational Arizona facilities by the end of 2026.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for owner identity and metro-wide operating/building language. The workforce projection is not allocated to a facility and is not a vacancy count.Owner fact sheet reports roughly 430 facility workers in 2025 and about 8.4 million construction hours with more than 2,050 peak construction jobs across new Arizona work.
Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · qualified accuracyOwner estimates are metro/state aggregates and subject to change. They are not current openings and cannot be assigned to a single campus.Contemporaneous city announcement describes two Goodyear campuses and a 150-acre El Mirage campus at CenterPoint Logistics Park with an initial 254,000-square-foot building.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for the announced 2019 site program. Job and construction figures were forward-looking at publication and are not treated as current.Current college page documents hands-on server, storage and network labs, industry-certification preparation, scholarships and eligibility to apply for Microsoft internships.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the published learning route. Internship eligibility is not acceptance, placement or a project-specific employment guarantee.Official network lists the Goodyear partner site and West Valley Career Center and connects residents and employers to job matching, hiring events, training referrals and paid-work pathways.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for public services and locations. A listing does not establish any exclusive campus intake, seat count or placement outcome.Current owner page markets developing Phoenix sites at 212 MW in Goodyear and 108 MW in El Mirage.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for current marketed development scope. Marketed megawatts are planned campus figures, not proof of energized capacity, completed buildings or a local opening.City announcement identifies a 225-acre site northwest of Bullard and Yuma and an original eight-building concept. Gridwork defers to the current owner page for marketed MW.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for the announced site and original concept. The older 350 MW plan is superseded in this register by the owner's current 212 MW market page.Current owner page identifies 2950 S Litchfield Road, one tenant-serving 40 MW building, PHX II in development and seven planned facilities totaling 280 MW at full build.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for address, owner-stated live first building and current campus program. Full-build MW and building count remain forward-looking.Owner workforce essay describes a seven-building, 10–12-year Goodyear build with an estimated 500–2,000 people onsite daily during construction.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyForward-looking workforce range, not observed headcount or vacancies. Recheck as later buildings and contractor packages are identified.Current owner page places the campus at 45 S Bullard Avenue and describes five facilities, 176 MW and more than one million square feet once developed, with building five in progress.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for address and current owner-stated expansion. Full-campus scale is a buildout figure; it is not installed power or a vacancy count.City milestone names McCarthy as general contractor for phase two; Vantage's earlier topping-out record names Layton on the first facility.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for the named phase-two builder and 2022 milestone. It does not prove either firm holds a current unannounced package or opening.City milestone records DCX GYR1 operational with 6 MW and two suites online, names TBL Mission Critical for infrastructure operations and Cox Business for connectivity.
Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for the 2022 operating milestone and named partners. Expansion capacity was prospective and current status is checked against DCX directly.Current owner page labels Goodyear online and move-in ready with 6 MW total ITE power, high-density racks, three fiber networks and zero-water operation.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for current owner-stated availability and specifications. Move-in ready is a commercial availability claim and does not disclose occupancy or hiring.Current city status page says no data center is operating, under construction or actively permitting in Buckeye. It separately identifies the Buckeye Tech Corridor and the former hydrogen-hub site as possible future locations, and says Grand View is not primarily a data-center proposal.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the city's current permit and operating-status statement and its characterization of candidate sites. Recheck frequently because a first building application would immediately change the lifecycle picture.Official planning packet for the former Cipriani master plan establishes the technology and employment land-use process and the requirement for a development agreement. It is entitlement evidence, not a building permit or construction start.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the filed planning case and land-use process. Later agreements and permit records control current obligations and physical phase.Current owner page labels the park owned and in development and markets 2,019 acres, 1,800 MW and 22 parcels. These are land-development and planned-capacity figures, not energized load or a data-hall construction milestone.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for current owner identity, acreage and marketed plan. Capacity, parcel count and development status remain owner-reported and must be reconciled with utility, permit and delivery records.Historical acquisition record identifies Cipriani Holdings as seller and describes an anticipated program of as many as 40 individual data centers and utility work up to 1.8 GW. The current owner page supersedes its acreage figure.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for the 2024 acquisition and then-stated concept. Building count and power were forward-looking; current acreage is taken from Tract's live project page.City budget classifies Prime Data Center as ongoing construction-inspection workload and Hermosa Tech Park, including the QTS data center and infrastructure, as upcoming work. This is a current municipal lifecycle distinction, not a building-level permit inventory.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the city's ongoing-versus-upcoming classification as of budget preparation. Individual building permits, inspections and occupancy records remain the controlling granular evidence.City economic-development record identifies Prime Data Centers and a 1.3-million-square-foot campus with an adjacent commercial site. Later owner and builder records control the current building count and phase.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for the city's attraction record. The document predates the 2026 groundbreaking and is not used as current field-progress evidence.Official monthly PDF and spreadsheet register is the refresh route for applicant, address, permit type, valuation and issuance evidence. The current project cut still needs a complete multi-month parcel-level reconciliation.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for issued entries in each monthly report. Project identity can require address, parcel and legal-entity reconciliation; absence from one month is not evidence of no project.Current owner page markets PHX01 at 225 MW on 100 acres in Avondale. It does not publish building-by-building commissioning or occupancy status.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for current owner, market, acreage and marketed critical capacity. Operating versus expansion phase remains qualified until occupancy, commissioning or owner milestone records are reconciled.Independent facility registry labels PHX01 operating and preserves dated satellite imagery. Gridwork keeps the operating label qualified because the current owner page does not publish building-level commissioning or occupancy.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyUseful independent operating-status evidence with source-level traceability, but not a municipal certificate of occupancy or owner commissioning notice. Reconcile against permits and owner milestones.Contemporaneous owner record documents the original 79-acre acquisition, more than 150 MW of planned capacity and one million square feet of buildout. The current campus page supersedes these scale figures.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · qualified accuracyHigh for the 2020 acquisition and original plan. It is historical and does not establish current commissioned capacity, occupancy or hiring.Current owner campus page identifies five 48 MW buildings, 240 MW total critical power, 66.5 acres, 1.3 million square feet, SRP service and an onsite substation. PHX01-01 through -04 are labeled construction and PHX01-05 development.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · qualified accuracyHigh for current owner-published building specifications and commercial status. Construction labels are not percentages complete, and full-campus MW is planned rather than energized load.Owner milestone documents construction start for the first three 267,000-square-foot, 48 MW buildings; all three are leased to an undisclosed hyperscaler. It reports phase one of the 250 MW substation commissioned and a $3B-plus planned investment.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for groundbreaking, initial building scope and owner-reported substation milestone. Investment and future campus capacity remain program figures, not audited spend or energized tenant load.Builder record names ARCO for major site development, underground coordination, private-substation coordination and core-and-shell construction on the first three PHX01 buildings.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for ARCO's disclosed scope on buildings one through three. It does not assign later buildings or every trade package to ARCO.Current owner board exposes two exact-Avondale construction records: Construction Project Manager and Construction Scheduler. Older indexed Avondale roles no longer visible on the live board are excluded.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for titles and exact city observed on the current official board. Openings can change daily; recheck the detail or employer list before applying.Official council packet establishes a data-center campus and supporting commercial development at the southwest corner of Avondale Boulevard and Lower Buckeye Road. Later city budget records identify QTS and classify the project as upcoming.
Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for entitlement geography and approved planning context. The packet does not establish current vertical construction, installed MW or an operating date.Current QTS portfolio lists Phoenix 2 and Phoenix 3 as in development. Gridwork uses the City of Avondale budget and Hermosa Ranch packet—not the portfolio naming alone—to identify the separate Avondale campus.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for QTS's current Arizona development portfolio. The public portfolio does not clearly map the Phoenix code to Hermosa Ranch, so no code or MW is inferred for the Avondale record.City milestone records the PHX-13 groundbreaking, 72 MW, four planned facilities on 100 acres, closed-loop cooling and an APS 230 kV transmission connection.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the dated groundbreaking, disclosed PHX-13 scale and city-described campus plan. It does not establish current percent complete, energized load or occupancy.Current owner portfolio identifies PHX-07 at the Glendale/Waddell campus. Owner construction material separately identifies PHX-13 and the planned PHX-12 and PHX-14 facilities.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for owner identity and current facility naming. Commercial availability does not disclose occupancy, commissioned MW or completion of later facilities.Named builder page confirms the Lewis–GCON joint venture and a two-story, 445,000-square-foot, 72 MW facility delivered across two phases.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the named construction team and disclosed PHX-13 scope. It does not assign every subcontract or certify current field completion.Official index for monthly issued-permit reports. Gridwork reconciled January through July 2026 entries for Aligned and QTS; one-month absence is never treated as evidence of no project.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for issued entries, declared valuations, addresses and named applicants. Valuation is package value rather than total project spend; entity and address reconciliation can still be required.Current owner page labels Phoenix 3 in development and exposes five Glendale building addresses: DC1, DC2, DC9, DC13 and DC14.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · qualified accuracyHigh for owner identity, current development label and published building addresses. The page does not establish full-campus building count, commissioned capacity or individual completion dates.City budget highlights Aligned and classifies the 400-acre QTS campus as under construction. Building-level phase is reconciled against monthly permit entries and the owner register.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for the city's project identity, acreage and under-construction classification at publication. It is not a live inspection ledger or installed-capacity statement.Official register includes a $116.1 million QTS tenant-improvement permit at 17236 W Camelback Road plus fire-system work. Permit value is not campus spend.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for issued permit, address, applicant and declared valuation. Tenant-improvement issuance does not prove completion or occupancy.Official register includes a $35 million QTS tenant-improvement permit at 17316 W Camelback Road and fire-system work across multiple campus addresses.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for issued permit, address, applicant and declared valuation. Package values must not be summed into total project investment without scope reconciliation.Official register includes a $12.4 million Aligned tenant-improvement permit at 8785 N Reems Road and related campus records at 8907 N Reems Road.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the issued package and addresses. Permit valuation is not total campus spend, and address-to-facility assignment still requires owner reconciliation.Official register includes continuing Aligned commercial work at 8907 and 8895 N Reems Road, including one $205,251 and three $84,855 alteration entries.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for issued packages, addresses and declared valuations. Repeated address records are not separate campuses and are not summed into total investment.Official register carries additional Aligned fire and miscellaneous work at 8895 N Reems Road, establishing continuing campus permitting through July.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the issued records and address. Fire and miscellaneous permits do not prove building commissioning, occupancy or a new campus phase by themselves.Official register names Vantage Data Centers at the southeast corner of Bethany Home Road and Cotton Lane and records issued grading and drainage permits.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for applicant, location and issued civil permits. The records do not establish a vertical building start, MW, building count or commissioned facility.Applicant project page describes two data-center buildings and onsite natural-gas generation near Waddell. Filed county and state records control entitlement and power figures.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for applicant-stated concept and public participation routes. It is advocacy material; county, ACC and municipal filings control approvals, conditions and current jurisdiction.State record reports a 5–0 approval of the certificate for a 700.2 MW gas-fired power plant intended to serve the proposed campus.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the commission vote and certificated generating capacity. Approval is not construction, financing, operation or proof of data-center power consumption.County record describes 160 acres, two two-story data-center buildings, Baccara Power, an APS substation, Electric District No. 7 and forecast construction and operating employment.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for filed scope, parties and entitlement context. Job counts, $370 million building value and $8.2 billion equipment value are applicant projections—not observed employment or audited spend.City notice identifies pending cases AN-273 and ZON26-05 for 160 acres north of Olive Avenue between Reems and Litchfield roads. Gridwork retains Waddell as the project city until annexation is adopted.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for filed case numbers, meeting date and geography. A neighborhood meeting is not final annexation, rezoning approval or a construction permit.Official Workday board exposes exact PHX-07 and PHX-13 roles plus multi-site roles that list PHX-07 as an eligible worksite.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for current title and published eligible worksite. Multi-site roles are not guaranteed Glendale placement, and every detail should be rechecked before applying.Live municipal permit layer reconciled by project number, address, permit status, issue date, scope and named professional. It identifies active packages for STACK PHX02, Menlo Thistle, Iron Mountain AZP3, phoenixNAP II, Aligned Union Hills and PHX08, QTS Phoenix 2 and 1GServers.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the city-maintained permit fields at retrieval. OPEN can include review or issued work; DONE means the city record is complete, not that an entire campus is commissioned. Project numbers can contain unrelated legacy addresses and require parcel-level reconciliation.Official staff report for the city's data-center Special Permit process and utility, fire, health, noise and design review requirements.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the adopted-review context documented by the city. It is a citywide policy source, not proof that any particular parcel has received a Special Permit.Official case index used to retrieve McDowell Road Data Center Z-62-17, 2950 E Broadway Road Z-42-17 and Laveen technology-corridor entitlements.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for case identity, geography and adopted status. An entitlement permits a use; it does not establish a current operator, construction start or continuing development intent.Reported land-record review says Amazon Data Services acquired roughly 220 acres near Loop 202 and Dobbins Road for $277 million; AWS described the purchase as continued evaluation, not a committed build.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyUseful for buyer, price and approximate acreage, but the deed and parcel set are not linked directly and AWS did not announce construction. Treat as an owned potential site with no active workforce forecast.Owner page identifies 4801–4811 E Thistle Landing Drive, five buildings, 1,022,400 square feet, 257 MW utility and 180 MW critical IT. Its displayed construction percentage is older than later city foundation and shell permits.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · qualified accuracyHigh for owner-published program scope and address. The page's construction 0% indicator conflicts with newer city-issued Clayco foundation and shell permits, so it is not used as current stage evidence; target dates remain forecasts.Current owner page markets a 51-acre, five-building program with nearly 250 MW of planned critical capacity and an onsite substation; the city permit layer establishes the active first-building package.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for owner, campus program and marketed capacity. The page does not state building-by-building delivery, commissioned load or occupancy; city permits control active stage.Current owner register identifies DC1–DC5 at 1200, 1250, 1400, 1450 and 1500 N 40th Street on an 80-acre campus with 210 MW-plus marketed critical capacity.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for current owner, address set and marketed campus scope. The page does not disclose energized capacity or building-level occupancy; municipal permits and certificates control those milestones.City legislative record covers the multi-building McDowell Road campus and public-park obligations at 40th Street and McDowell Road.
Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for the agreement and municipal obligations. It does not by itself establish current building occupancy, installed MW or open hiring.Current owner page identifies a 39-acre, three-facility Phoenix campus with more than one million square feet and 125 MW combined program capacity. City records show AZP3 core, shell and current data-hall fit-out at 5100 E Roosevelt Street.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for owner-published campus scope and facility set. Availability and leased status are commercial statements; the city permit layer controls current AZP3 package activity and does not prove energized tenant load.Current operator sheet identifies a 40,456-square-foot, 13.3 MW multi-tenant environment at 615 N 48th Street inside the larger Iron Mountain campus.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for Centersquare's current operated footprint and address. It is an operator within the physical Iron Mountain campus and is therefore linked as a company, not duplicated as a separate land-and-building project.Current owner page confirms the operating 3402 E University Drive flagship. Owner collateral reports 100,000 square feet operating and a 530,000-square-foot expansion underway; city permits place phoenixNAP II at 3225 E Elwood Street.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for the operating flagship and owner-stated expansion. The city-issued grading and shell permits control the second building's stage; collateral square footage is program scale, not occupied area.Current owner page lists four facilities at the 55-acre 2500 W Union Hills Drive campus. The city permit layer separately identifies PHX08 civil and demolition work at 3202 W Behrend Drive.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for the current Union Hills facility set. Commercial availability is not occupancy or energized-load evidence, and the page does not yet publish PHX08; the city permit record controls that separate site identity.Current operator page identifies the operating Deer Valley facility at 1850 W Deer Valley Road with 5.02 MW critical load and a 109,476-square-foot footprint.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for current operator, address and published specifications. It does not disclose current vacancies, utilization or a live expansion package.Current operator page identifies the operating 2475 W Townley Avenue facility with 3.6 MW critical IT load and 46,000 square feet.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for current operator, address and published specifications. It does not establish current hiring, utilization or expansion.Current owner page identifies the operating four-story, 275,000-square-foot downtown internet gateway and data-center facility.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for current ownership, address and building size. Product availability is not current occupancy or vacancy evidence.Current owner page identifies 3719 E La Salle Street, limited live cabinet availability and a planned second expansion phase. City records show a 2026 remodel, fire-alarm and battery-system package.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for owner, address, live service and stated phase-two intent. It does not publish campus MW or completion percentage; city permits control the active fit-out evidence.Employer-hosted local opening for an on-site Phoenix data-center and helpdesk technician, with application by resume and cover letter.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the employer-published role and Phoenix worksite observed. The page provides no requisition ID or posting date and can change without notice; confirm availability before applying.Current operator page identifies the live colocation facility at 2922 W Clarendon Avenue and publishes cabinet, cooling and connectivity options.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for current service, operator and address. Marketing specifications do not establish utilization, expansion or active vacancies.Property memorandum identifies a 16,000-square-foot NexusTek network operations center and data center at 1919 W Lone Cactus Drive, including approximately 6,500 square feet of data hall and 741 kW capacity; NexusTek still publishes the address as its Phoenix office.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyGood historical physical-facility evidence but not a current operator specification sheet. Retain as a small operating-support facility with a current-status refresh flag; do not infer expansion or hiring.Current provider map identifies an ILA colocation location at 1710 E Grant Street and distinguishes it from the city's larger third-party campuses.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for provider-published location and ILA colocation role. It does not publish building scale, staffing or a construction program; classify as an edge/network facility.Current carrier register lists 811 S 16th Street as a Phoenix 400G-enabled network location; Lumen's product documentation separately confirms Phoenix edge compute and storage availability.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for the current network address and Phoenix edge availability. The source does not publish data-hall scale, staffing or a new build, so the record is classified as a network-edge facility rather than a hyperscale campus.Adopted 7.67-acre PUD authorized a data-center use at 2950 E Broadway Road. Current city environmental records identify Cereus Graphics at the property and no current data-center building permit was found, so the entitlement is retained as inactive rather than presented as a live project.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for the adopted entitlement and address. Current non-data-center use and absence from the active permit sweep do not legally extinguish the PUD; they support an inactive/watch classification, not cancellation.City map and case-document route used to reconcile data-center zoning, addresses and proposed or approved PAD cases. Building and inspection records still require Citizen Access or a public-record request.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for city-published case geography and linked planning documents at retrieval. Map status is not a certificate of occupancy, current operator confirmation or complete permit export.Official city summary establishes that primary-use data centers require explicit PAD approval and documents sound-study, generator-testing and neighborhood-communication requirements.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyHigh for the citywide approval framework. The ordinance does not identify every facility, prove a building permit or establish current operation at a particular address.Current owner page identifies one Chandler campus containing eight facilities, approximately two million square feet of technical space and 169 MW total IT capacity.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for current owner, eight-facility campus identity and combined marketed specifications. It does not publish building-level occupancy, energized load or current construction packages.Official Workday board exposes current Chandler operations, maintenance, service-delivery and facility-management roles plus one Arizona multi-site night-shift pipeline.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for current published title, city and requisition at observation. Chandler is assigned to the only resolved CyrusOne campus in the city; individual PHX building placement remains undisclosed and every requisition must be rechecked before applying.Current reseller page places Data Canopy service at 2605 S Ellis Street inside CyrusOne PHX8. Gridwork links the company to the campus instead of creating a duplicate physical project.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for Data Canopy's published service location and PHX8 attribution. It does not establish separate land, a separate building or operator control outside the CyrusOne campus.Current owner page identifies the operating two-story, 508,000-square-foot PHX15 data center in Chandler.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for current owner, address, operating service and building size. Commercial availability and total metro statistics do not establish occupancy, utilized load or a live construction package.City Council record approves a sustainable water-service agreement with Digital 2121 Realty South Price LLC for the data center at 2121 S Price Road.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the legal party, address and approved water agreement. It is not an expansion permit, utilization measure or employment commitment.Current operator page identifies the 2600 W Germann Road facility, 180,000 square feet, 26 MW of capacity and 40 customers.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for current operator, address and published facility specifications. Customer count and capacity are operator claims; no current expansion permit or utilized-load figure is exposed.Current owner register separately lists PHX-04 at 2501 S Price Road and PHX-06 at 2955 W Innovation Street in Chandler.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for current facility identifiers, addresses and operating service. The page does not disclose building-level occupancy, commissioned MW or current construction packages.City-hosted project notice identifies Aligned's approximately 17.28-acre Continuum II site at the southeast corner of Price Road and Innovation Street.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for applicant, parcel, acreage and filed proposal geography. A neighborhood meeting is not a building permit or certificate of occupancy; the current owner portfolio supplies operating identity.Official Workday board exposes current multi-site land, customer delivery, procurement and quality / commissioning roles that include PHX-04 as an eligible worksite.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for published eligible worksite and requisition at observation. These are multi-site roles, so placement at PHX-04 is possible rather than guaranteed; none is assigned to PHX-06 without explicit posting evidence.Owner announcement identifies a partially occupied 191,000-square-foot facility at 2500 W Frye Road, 28 MW of confirmed utility power and a planned 16 MW turnkey buildout with cooling upgrades.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for owner-stated acquisition, address, existing facility and intended redevelopment. Planned turnkey capacity, water savings and delivery are forward-looking until permits, inspections or owner milestones confirm them.Current operator-hosted page identifies HorizonIQ's Chandler flagship at 2500 W Frye Road. Lincoln's later owner record controls current property redevelopment scope.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyGood for the continuing operator association and address. The page originated under the INAP brand and does not resolve current leased halls, tenant identity or Lincoln's construction progress.Reported acquisition record describes 1890 and 1900 S Price Road plus 3200 W Germann Road as a three-building former Digital Realty complex that was vacant at sale, with retrofit intent by the buyer.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyUseful historical evidence for address set, vacancy and sale context, but it does not identify the current owner, prove retrofit completion or establish a current operator. Retain as an inactive redevelopment lead pending deeds and permits.Official results show a unanimous 7–0 motion to deny the proposed 422,877-square-foot AI data center, associated tech park rezoning and development agreement at 3380 S Price Road.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the filed scope and council denial. The denial prevents this proposal from being presented as an active build; a future application or appeal would require a new controlling record.Current city code limits data centers to specified industrial and mixed-use districts through a use permit, requires residential separation and enclosed generators, and adds economic-impact and extreme-water-use review.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyHigh for current land-use controls. The ordinance defines where and how a facility may be approved; it does not identify every existing site or prove a pending project.Official entry point for planning submissions and document retrieval used to extend the city inventory beyond indexed council and activity packets.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the city's current submission and retrieval process. A portal route is a discovery source, not evidence of a specific approval or construction milestone.Current owner data sheet identifies the operating PHX01 facility in Tempe at 3011 S 52nd Street, 79,200 square feet, 17,300 square feet of raised floor and cloud on-ramps; PHX11 is separately tracked in Mesa.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the current owner-published address, facility configuration and service availability. Marketed power and availability remain commercial specifications rather than utilized load.City activity record identifies BP221674 for mechanical and electrical equipment additions at 3011 S 52nd Street; related city ledgers also preserve battery replacement, roof, interior demolition and low-voltage work.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the filed permit title, address and scope. The ledger does not establish current completion, equipment count, energized load or later inspections.Current operator page identifies 8905 S Beck Avenue in Tempe as a 28,000-square-foot facility with 18,000 square feet of raised floor, 2 MW N+1 power and remote-hands support.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the current operator-published address and marketed facility specifications. It does not disclose utilized load, customer count or binding local hiring.Current service page markets a Phoenix data-center facility at 1005 W Geneva Drive in Tempe. Property ownership, active customer load and the relationship to the former Omnis operation remain unresolved.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyGood for the currently marketed address and services, but the page does not establish property ownership, occupancy, utilized load or continuity from the former Omnis operation.Reported property listing describes a roughly 15,000-square-foot data-center building at 1005 W Geneva Drive and names Omnis at the same address.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyUseful for the sale listing and historical Omnis association. Recheck deed, listing disposition, permits and a current operator record before treating ownership or active service as resolved.Current recruiter-hosted contract posting names Tempe and hands-on rack, stack, cabling and hardware-turn-up work. The customer and facility address are not disclosed.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the posting at observation time. The exact employer customer and worksite are withheld, so the role must remain a Tempe-market signal rather than a campus assignment.Official city records hub links building permits, certificates of occupancy, planning cases, GIS and public-record requests. Scottsdale's SPUR portal began handling new planning and permitting activity in January 2026 while older cases remain in legacy systems.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the city's current record-access routes and system transition. A portal is a discovery source; project stage still requires a permit, inspection, certificate or case record tied to an address.Current owner page identifies AZS-1 as an operating 121,000-square-foot facility on 4.5 acres with 5.8 MW of power, four data halls, 16-plus on-site providers and potential expansion to 9.6 MW.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the current owner, marketed facility configuration and service availability. Potential capacity is not energized load, expansion construction or a vacancy count.Finalled city remodel permit ties 8521 E Princess Drive to parcel 215-07-212A and DC-8521 East Princess Drive LLC; the record includes a certificate of occupancy route and names Cannon & Wendt as builder.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the historical permit, legal owner field, address, parcel and finalled status. It is a 2016 remodel record and must not be presented as evidence of a current expansion.Current operator facility sheet confirms an active Scottsdale data center offering colocation, managed IT, recovery and workplace-recovery services; the detailed 2025 revision reports 102,400 square feet, including 16,000 square feet of raised floor and 29,000 square feet of managed-services space.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for current operator service at a Scottsdale facility. The current sheet omits the street address and detailed configuration, so 7499 E Paradise Lane and detailed area figures remain qualified against the prior operator sheet and city parcel records.City planning record identifies Scottsdale parcels 215-44-041 and 215-44-043 at 7499 E Paradise Lane and names AX Gardsun LP as the parcel owner.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for the parcel addresses and owner listed in the 2024 city record. The mailing list does not establish the data-center operator, current lease, occupancy, permit stage or title after the document date.Official employer careers page routes candidates to the current ATS and states that individual postings specify work-location requirements.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the employer-controlled recruiting route. No exact Scottsdale or Paradise Lane requisition is normalized in this review, so company-wide roles are not assigned to the facility.Official minutes record staff's statement that Gilbert had one known data center and no received data-center applications while the commission initiated research and a Land Development Code amendment for future standards.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for staff's February 2026 inventory statement, absence of applications known to staff and code-amendment initiation. It is a dated municipal snapshot, not proof that no filing arrived later.Official municipal portal for planning applications, commercial building permits, engineering records, inspection scheduling and inspection results.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the town's current record-access route. A portal is a discovery source; project stage requires an address-linked application, permit, inspection or certificate record.Current operator page identifies AZ01 at 1655 W Sunrise Boulevard in Gilbert, with 1,000 kW generators in 2N redundancy, 500 kW UPS in 2N, 1,500 kVA utility feeds, N+1 cooling and a 1998 build year.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the current operator, exact address and published infrastructure configuration. The page's zero-value total-space and workload counters are treated as missing display data, not literal zero capacity.Owner announcement identifies the acquisition of OneNeck IT Solutions and OneNeck Data Center Holdings, including the Phoenix-area data center; US Signal later states the transaction closed in September 2024.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the buyer-stated acquisition scope and operator succession. It does not identify current site staffing, capital work or individual customer occupancy.Official employer ATS exposed ten current opportunities at review; none named Gilbert, AZ01 or 1655 W Sunrise Boulevard.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the current requisition inventory at observation. The absence of Gilbert roles is time-sensitive and does not establish that the facility is unstaffed.The official council packet adopts P22-0205 / Ordinance 801-22, codifying a prohibition on data centers as a primary use. It separately allows a limited ancillary data center to be considered by conditional use when it directly supports the underlying business and occupies a minimal footprint.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the adopted 2022 zoning action and its primary-use / ancillary-use distinction. Any later text amendment, rezoning, annexation or state-law preemption must be checked before treating the policy as unchanged.The town's current published zoning ordinance retains Data Centers and Ordinance 801-22 in its amendment history. Gridwork uses the adopted packet for the operative primary-use and ancillary-use language and the current code as the later persistence check.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the May 2026 code publication and amendment history. The compiled PDF should be rechecked for later amendments and controlling table changes before every policy-status update.Official current-case index and linked Development Nexus route were screened for a physical data-center project. No data-center project was resolved from the public index in this review; that is a scoped no-match, not proof that no pre-application, county-island, ancillary facility or differently named filing exists.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for the town's public access routes and qualified for a no-match result because portal search, indexing and pre-application visibility can be incomplete. Refresh against case lists, Accela records and meeting packets.Official minutes approve ANX24-00192, ZON24-00561 and ZON24-00190 for Pacific Proving Technology Campus north of Pecos Road and east of the future Crismon alignment. The 177-acre zoning case allows a data center and names Pacific Proving LLC and Mesa BA Land LLC as owners and Gammage & Burnham as applicant.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the approved cases, Mesa jurisdiction, disclosed owners, applicant and 177-acre zoning envelope. Approval does not establish a construction start, operator, NTT identity, capacity, investment or completed building.Official FAQ describes an approximately 480-acre potential campus near Bianco, Clayton and Gila Bend Highway: up to 13 buildings and approximately 3.25 million square feet. It separately labels the developer's $2.5 billion campus / onsite-power estimate, $4.1 billion equipment estimate and 585 five-year operating-job estimate. The end user, MW, construction schedule and temporary construction employment are undisclosed.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for the city's process, location, waiver conditions and disclosed maximum envelope. Investment, employment, wage and tax figures are developer estimates, not observed spend, contracted hiring or guarantees.Adopted resolution approves and records two property-specific waivers. The waivers run with the land but do not waive site-plan, building, environmental, utility or other development approvals and do not authorize construction.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyControlling record for the August 3, 2026 waiver action and its limited legal effect. It is not a development permit or evidence of mobilization.Staff report identifies Vernon Barnes and Dale Willis through Ethington & Hwy 84 LLC as the two landowners across approximately 480 I-2 acres. Conditions include cooling and power disclosure, an aggregate 800 acre-foot annual potable-water cap, behind-the-meter power until utility capacity, 60/55 dBA day/night noise limits, decommissioning after a 24-month closure and a conditional $5 million recreation contribution.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for disclosed owners, parcel scope, waiver history and adopted conditions. References to a future campus remain pre-application planning evidence until site and building filings appear.Claim identifies Vernon Barnes as owner, states an intent to pursue data-center development and lists APNs 503-44-0020, 503-44-0030, 503-44-001A and 503-44-001B at the southeast corner of Bianco and Clayton. The claim's $73,180,800 diminution figure is a claimant allegation, not project investment.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for the filed claimant identity, cited parcels and stated intent; qualified for valuation and legal assertions because they originated with the claimant and were resolved through a waiver rather than adjudicated here.Claim identifies Dale Willis by and through Ethington & Hwy 84 LLC, states an intent to pursue data-center development and lists APNs 503-44-009A, 503-44-009B and part of 503-44-008A near Bianco and Gila Bend Highway. The claim's $73,180,800 diminution figure is a claimant allegation, not project investment.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for the filed claimant identity, cited parcels and stated intent; qualified for valuation and legal assertions because they originated with the claimant and were resolved through a waiver rather than adjudicated here.Official access route for planning applications, conditional-use permits, site plans, building permits, inspections and public meetings. No project-specific site plan or building permit is asserted from the portal itself.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for the current public filing route. Project stage must be tied to an exact parcel, address, case, permit or inspection rather than inferred from portal availability.Official register records approvals for SunHill PZ-PA-012-24, Frontier West PZ-PA-015-25, Project Midway PZ-PA-013-25 and the earlier La Osa comprehensive-plan amendment PZ-PA-011-25. These are land-use-plan actions, not building permits or construction starts.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for case disposition, applicant, land area, parcel and location statements. Each approval only carries the legal effect of the named comprehensive-plan action; later zoning, PAD, permits and inspections must be checked separately.Official application sought I-3 zoning over 2,393 acres and a PAD over approximately 3,385 acres for data centers, gas-fired generation, battery storage and related facilities south of Eloy. The Board later denied the two continued zoning items on August 26, 2026.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed zoning request, legal scope and proposed uses. Applicant employment, capacity and delivery assumptions are proposals, not constructed or contracted facts.Official county recap states the Board voted 4–1 on August 26, 2026 to deny two continued planning and zoning items related to the south-of-Eloy data-center development.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for the 4–1 denial and meeting date. The recap is paired with the exact PZ-003-26 / PZ-PD-003-26 packet; monitor minutes, resolutions, appeals or a new filing for controlling follow-up.Official agenda and adopted action identify Judd Ventures LLC and approve a major comprehensive-plan amendment over approximately 96 acres at the southeast corner of Felix and Judd roads: approximately 80 employment acres and 16 mixed-use residential acres for a data center, BESS and residential development.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for owner, case, approved plan amendment, parcel location and broad proposed uses. The record does not establish a rezoning, operator, MW, building permit, construction start or job count.Official staff packet places the approximately 495-acre case northeast of Maricopa and Teel roads in unincorporated Pinal County and within the City of Maricopa's extended planning area. It documents the proposed 414-acre employment / 81-acre public-facilities split, names W Holdings and Arizona RR Ranches, and preserves the City of Maricopa's objections. The county later approved the comprehensive-plan amendment.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the jurisdiction, case parties, parcels, land-use envelope and intergovernmental comments. Applicant descriptions, employment claims and technology-campus concepts are proposals; the packet is not a rezone, PAD, generation approval, utility commitment, building permit or construction start.Official county packet places the 215-acre site at the southwest corner of Selma Highway and Midway Road in unincorporated Pinal County, identifies parcel 500-12-001B, Selma & Midway LLC, IDM Companies, Withey Morris Baugh and Colliers Engineering & Design, and describes a data-center campus within a flexible employment / industrial envelope. It also states that a later industrial rezoning is intended.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for jurisdiction, parcel, named project parties, filed land-use request and the applicant's intended later rezoning. The data-center concept, traffic, jobs and utility narrative are applicant projections; the packet is not a rezone, PAD, power-service agreement, building permit or construction start.Current county record identifies Project Bella Holdings LLC's Bella Energy Facility at Cornman and Midway roads as a power plant under Title V permit V20700.A02. County zoning records separately approve a 351.8-acre I-3 rezone for the proposed 480 MW thermal generation and 440 MW battery-storage facility. Project Midway's own filing describes adjacency as a potential synergy, but no dedicated supply contract or data-center delivery commitment is established.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the facility identity, permit number, address, permit dates and approved power-project zoning envelope. The record does not establish that Bella is built, generating, contracted to Project Midway or part of the data-center campus; keep it as adjacent enabling-infrastructure evidence only.The current county parcel layer resolves SunHill APNs 210-44-002 and 210-44-004 to Judd Ventures LLC and 95.93 combined stated acres; Project Midway APN 500-12-001B to Selma & Midway LLC and 215.8 stated acres; and the Frontier West packet's cited parcels to Arizona RR Ranches LLC. SunHill and Midway are shown as vacant land. Frontier West records span vacant and agricultural classifications; only portions of the large 510-54-002A and 510-48-029L parcels lie inside the filed project envelope, so their full assessor acreage is not added to the campus total.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for the parcel IDs, current assessor-listed owner, stated area and use fields returned on the review date. Assessor records are not title evidence and can lag deeds or parcel changes. Multipart geometry can return duplicate rows, which are deduplicated by parcel ID rather than counted as separate parcels.The official index, released through August 27, 2026, returns Judd Ventures LLC deed 2024-045397 plus related June and October 2024 instruments in Section 29, T03S R09E; Selma & Midway LLC corrective deed 2019-058087 in Section 1, T07S R04E; and 18 Arizona RR Ranches LLC entries from 2023 through 2026 across Sections 25, 34 and 36, T05S R03E. The Frontier West chain includes 2024 deeds, option 2024-098878 and survey 2026-006351. Those records corroborate entity and land activity but do not by themselves establish project financing, a utility commitment, permits or construction.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for the indexed entity names, instrument numbers, recorded dates, document types and legal-description fields displayed on the review date. The index is not a title opinion; name searches can miss spelling variants, an instrument can serve more land than the project, and a recorded survey or option is not evidence of vertical construction.The county's current Citizen Access landing page is public, but the Building search navigation displays a registration or login requirement. Gridwork therefore does not treat the absence of anonymously retrievable building results as a no-permit finding; exact APN, address and entity requests remain queued for account-authorized review or a county public-record request.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the current access behavior observed on the review date. It says nothing about whether a permit exists behind the gate and must never be converted into a negative project-status claim.The active public-notice list was screened by project name, owner, applicant and known location. No SunHill, Judd Ventures, Frontier West, W Holdings, Arizona RR Ranches, Project Midway or Selma & Midway match appears in the current notice set. This is a scoped current-notice result only; it does not cover every issued, pending, administratively complete, minor, dust or differently named generator permit.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for the entries published in the live notice register on the review date. Qualified as a negative screen because the page is not a complete historical or pending-permit inventory and project facilities may be filed under a future operator, power entity, contractor or address not yet resolved.Official careers page publishes construction, residential and corporate career areas. The county filing names IDM as Project Midway developer, but no current posting is assigned to Project Midway or its future data-center program.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the official hiring route and broad career areas. Recheck live openings before applying; do not infer a Midway assignment without an exact site, project or requisition reference.Current official requisition 13700 includes Phoenix for a data-center architecture project manager working across national client programs. Colliers is the filed civil engineer for Project Midway and Southwest Crossing, but the requisition does not name either project and is therefore linked only as regional demand.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for title, Phoenix eligibility, job family and current official route at review time. Project assignment, client, worksite and longevity remain unverified; recheck the posting before applying.The complete public 2026 Planning and Zoning index was screened through the September cancellation notice. January through March and August through September were cancelled; the April, May, June and July agendas contain rezoning, PAD and commercial cases but no identified data-center project.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for the cases and cancellations in the published commission index. A no-match is qualified because an industrial-zone site plan, administrative review, pre-application, permit, county-island filing or differently named project may not appear in this commission channel.Current code defines data centers, lists the use as conditional in the Agricultural zone after Ordinance 24-13, and retains it among permitted uses in Commerce Park and Garden Industrial districts. The zoning path explains why commission agendas alone cannot establish a complete project inventory.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the published use permissions and ordinance history. Zoning eligibility does not prove that a project, site plan, permit, utility request, construction start or employer exists.The city's public Development Projects feature layer returned 38 named records across zoning review, plan review, approval, construction and completion states. No record name, case or project detail identified a physical data-center development in this screen.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for the 38 records returned by the public layer at review time. The zero-project result is qualified because the map may omit pre-applications, confidential leads, permits not promoted to the layer, county-controlled land, internal server rooms or differently named uses.Official council minutes record a concern about a possible location for a data center during an economic-development update. The minutes do not identify a site, applicant, operator, case, capacity, approval or construction plan, so the discussion is retained as a monitoring lead rather than a project.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for what the minutes say and qualified for project inference: a council question about a possible location is not an application, negotiated project, entitlement, permit or hiring signal.The municipal zoning-use table identifies data-center / data-processing facilities as conditional uses in specified business and industrial districts. It establishes a review path but does not identify a filed or approved project.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the published conditional-use treatment. Code eligibility is not evidence of a site, permit, customer, power commitment, construction phase or vacancy.The city's current StoryMap was parsed across 81 named projects in review, approved, under-construction and completed sections. No entry identified a physical data-center project inside municipal Maricopa.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for the 81 published project entries at review time. The zero-project result is qualified because the StoryMap is informational, may lag permit systems and may omit pre-applications, confidential economic-development leads, minor permits, internal server rooms or projects outside city limits.Official Development Services page identifies the current StoryMap, public-meeting notices, project coordination and GIS channels as the city's development-activity publication routes. The page states its information was last updated August 4, 2026.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for the city's stated publication routes and page update date. It is a discovery hub, not a permit ledger, completeness guarantee or evidence that an unpublished lead does not exist.Current college workforce page lists commercial electrical installation, welding, diesel and heavy-equipment training for Pinal County employers and workers. Separate current program materials document NCCER-aligned commercial electrician and HVAC pathways.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for currently published program scope. Enrollment dates, seats, campus availability, costs and employer relationships must be verified directly; no project placement is implied.Official local workforce network provides job matching, training navigation, hiring events and employer recruiting support across Pinal County.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the public service route. Current funding, eligibility, appointment capacity and employer demand vary; the page does not establish a data-center-specific intake or placement agreement.Official Planning and Zoning packet separates the 780-acre Florence Tech Park, 239-acre Dobson Farms East and 600-acre Dobson Farms West cases. It names Ryan Companies as developer of Florence Tech Park, contains the EdgeCore / Corgan ten-building test fit for the east parcel, and records that the test fit is incomplete and may not be used for permit or construction.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for case identities, applicants, parcels, acreage, proposed uses and the contents of the filed conceptual plans. Building counts, 72 MW labels, substation ratings and other test-fit figures are concepts—not approved construction scope, energized capacity or delivery commitments.Corrected council action minutes record unanimous 7–0 adoption of Ordinances 766-25, 767-25 and 768-25 for the east, west and Florence Tech Park general-plan amendments. The meeting record also captures unanimous adoption of Ordinance 769-25 for the Florence Tech Park PUD amendment.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyControlling municipal action for the October 7, 2025 votes. These policy and PUD approvals permit an entitlement path; they do not establish building permits, utility service, financing, mobilization or completion.Official council packet contains the ordinance exhibits, Ryan's Florence Tech Park / Able Tech Park traffic study, and the Dobson Farms West traffic study. The Tech Park concept includes five data-center buildings, two office buildings and one industrial building; the west study models a 6.46 million-square-foot data-center and industrial program.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for the documents considered by council and qualified for applicant modeling. Traffic, employee, square-footage and layout figures are planning assumptions and must not be restated as constructed facts or guaranteed jobs.Current municipal meeting register was screened through the available 2026 agendas and packets for later Dobson Farms site-specific approvals. No building permit, construction start or operating milestone is asserted from this index review.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for the public meeting access route and qualified for a no-match result because administrative site plans, building permits, utility records and unindexed pre-application work may sit outside meeting packets.Official city filing identifies Ryan Companies as developer, Coton City Industrial Park LLC as owner and Colliers Engineering & Design as civil engineer for approximately 122 acres at the southeast corner of Estrella and Houser roads. The filed PAD narrative and development plan describe the Southwest Crossing data-center concept.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed team, address, acreage and conceptual scope. The narrative, economic analysis and development plan are applicant submissions; capacity, investment, building count and employment remain proposed until later permits, contracts and field evidence confirm them.Official council agenda scheduled a public hearing and possible adoption of Ordinance 25-985 for RZPAD2024-006 and Resolution 25-1611 for the filed PAD. Gridwork did not resolve a signed ordinance or official result sheet in this review, so the council outcome remains explicitly unverified.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh that council considered the named case on February 10, 2025; qualified for disposition because an agenda proves scheduled action, not adoption. Retrieve the signed ordinance, minutes or clerk result before calling the PAD approved.Trade reporting based on the city documents describes a proposed 400 MW, up-to-1.25-million-square-foot campus and notes the January 15 Planning and Zoning recommendation. It is retained as a cross-check, not as the controlling entitlement source.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyUseful for reconciling the reported project identity and proposed capacity with the city packet. Current status, financial figures and future delivery remain subject to primary permits, utility records and signed approvals.Current program guide sets the 10- and 20-year capital, wage and Nevada-job thresholds and requires at least 50% Nevada-resident construction labor for eligible projects.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyControlling for the published program criteria. Eligibility conditions are not proof that a specific applicant complied, hired, began construction or received a final abatement.Audited program table lists approved Novva and Vantage abatements, counties, contracted capital, contracted jobs and average wage. Contract metrics are incentive obligations, not current openings.
Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · high accuracyHigh for the approved abatement fields in the report. Contracted jobs and capital must not be restated as realized payroll, current vacancies or completed investment.Application identifies 6115 N Nicco Way in North Las Vegas and records applicant schedule, facility, investment and job estimates considered by the state board.
Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracyHigh for the filed address and applicant statements; projected dates, jobs and capital are estimates. Use the biennial report for contracted program values and current owner material for operating status.Current owner page markets the North Las Vegas facility at 6115 Nicco Way as a 275,000-square-foot, 100 MW, 20-acre campus accepting reservations.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyDirect for the owner's current marketed facility facts and address. Availability language is commercial marketing and does not disclose occupancy, live IT load or current hiring.Current owner page identifies 1121 USA Parkway, four multi-story facilities, 224 MW and 1.1 million square feet; it still labels the first facility for Q2 2026 delivery.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyDirect for the owner's campus plan and address. A scheduled Q2 2026 delivery is not treated as completion without a later opening, certificate or operating disclosure.Official county minutes record unanimous approval of the Vantage special-use permit for APN 005-041-95 after the planning packet described multiple four-story data-center buildings.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyControlling for the SUP disposition and site identity. A special-use permit does not itself establish building permits, mobilization, completion or operation.Owner announcement reports nearly $3 billion, more than 1,200 construction and operations roles, two leased buildings and a scheduled Q2 2026 first-building delivery.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for the owner's disclosed plan and then-current schedule. Aggregated jobs are a forecast, and the scheduled opening requires later confirmation.County minutes approve separate multi-building data-center concepts at 2300 Peru Drive, 2200 Peru Drive and 9000 USA Parkway and explicitly state that an SUP is not a construction permit.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyControlling for the three SUP approvals, parcels and applicant entities. Building and fire review plus permits remain separate later gates; approval is not a field start.State application describes Fleet's planned colocation project at 2300 Peru Drive with expected Q3 2027 operations. The packet entity name and later financing entity differ and are not silently collapsed.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for the filed address and applicant representations; qualified for legal-entity continuity and forecast timing. Confirm ownership and assignments through deeds, state filings and later permits.First-party financing notice says proceeds fund development and construction of a 230 MW utility / 200 MW critical-IT facility and substation on a 517-acre Storey County property.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for the financing and disclosed Reno construction program. The announcement does not print the Peru Drive address; the address crosswalk depends on the GOED filing and remains qualified.Official Greenhouse board exposed current Sparks construction, project-engineering, quality, security, commissioning and cost roles. Street-level assignments are withheld on most records.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for titles, live URLs and listed locations at observation time. A Sparks location is a regional demand signal unless the posting itself resolves a project code or worksite.Application describes a new colocation project at 9500 USA Parkway in McCarran with expected Q3 2027 operations.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for the filed entity, address and applicant statements. The schedule and job estimates are projections; a county tax-notice waiver is not a land-use or building permit.Official minutes state Apple has operated at Reno Technology Park since December 2012, had more than 200 supporting team members, planned additional investment and received board approval for an abatement.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyHigh for statements entered in the board record and the approval. Forward investment and job figures are applicant projections, not current openings or completed expenditure.Current official state search exposes exact-Sparks project-management and controls roles for Apple's data-center program.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for current Apple requisitions, role numbers, listed city and posting dates at observation time. Requisitions can close without notice and do not disclose a building or phase assignment.Current owner page separates RNO01 in Sparks and RNO02 in Reno, each at 16 MW; RNO01 is sold out and RNO02 is preleasing for 2026–2027. The owner portfolio labels both under construction.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyDirect for owner-labeled identities, capacity and commercial status. Sold out and preleasing do not establish delivery, live load, permits or opening dates.Official Greenhouse board exposes two current Reno operations roles across night-shift and senior engineering coverage; a previously indexed swing-shift role is no longer on the live board and is excluded.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for titles, live URLs and Reno location at observation time. The board does not identify RNO01 versus RNO02, so roles remain market-level across the two sites.Current Northern Nevada workforce board route offers no-cost career planning, training, placement and employer services, with Reno, Sparks and Storey-area hub access.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyDirect for public workforce services and locations. It is a worker referral route, not proof of a project-specific cohort, employer commitment or placement guarantee.Current catalog lists qualifying Northern Nevada electrical, plumbers / pipefitters / HVAC, sheet-metal, carpenters, operating-engineers and other apprenticeship sponsors.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyDirect for cataloged apprenticeship credit and named sponsors. Admission is sponsor-controlled and no data-center employer placement or reserved project seat is implied.Current owner page identifies the operating Citadel campus and presents a Q2 2025 multi-gigawatt expansion update. The ultimate gigawatt scale is an upon-completion plan, not commissioned capacity.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyDirect for the owner's active campus identity and continuing expansion. Marketing scale, cabinet density and ultimate power are not treated as delivered load, occupied space or current hiring.Historical owner announcement records the opening of Tahoe Reno 1 and describes the original 2,000-acre Citadel plan. Current campus disclosures supersede the historical ultimate-capacity figures.
Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracyDirect for the opening milestone and then-announced campus design. Historical designed capacity is not a current commissioned-load or occupied-space measure.County packet tracks proposed Switch expansion at 1 Superloop Circle and 3800 Peru Drive across three assessor parcels. Gridwork uses it as a land-use record, not proof that every proposed building was permitted or delivered.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for the filed addresses, parcels and proposal. Confirm the final board disposition plus later building, fire and occupancy records before assigning individual expansion buildings a field status.Current owner page says the Storey County data center was built in 2021 and reports more than $6 billion invested across Google's Henderson and Storey County sites, not Storey County alone.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyDirect for operation, the 2021 milestone and owner-provided statewide investment aggregate. The combined Nevada figure is never allocated to this campus without a separate disclosure.Current owner captions identify two Storey County data centers, an active generator-yard build and land where construction was ready to begin on another data center.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyDirect for the owner-captioned two-building operating campus and depicted expansion activity. Image timing and the later status of the next building are not published, so no completion date is inferred.Current owner page describes a 56-acre, three-building campus planned for 216 MW critical IT and nearly one million square feet with contracted near-term power.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyDirect for the current campus plan, design and owner relationship. Upon-completion area, MW and contracted power do not prove building delivery, energization, tenant occupancy or live load.Official county public notice schedules EdgeCore's topping-off event at 3000 USA Parkway. It is a structural milestone, not a certificate, energization or opening record.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for the named company, address and scheduled topping-off event. The notice does not identify which of three planned buildings, document event completion or establish fit-out and operating status.Current owner portfolio describes a 49-acre, three-building, 900,000-square-foot powered-shell campus being developed for 200 MW and still displays an April 2026 delivery schedule.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyDirect for the owner's development plan. The April 2026 power date is treated as an unconfirmed schedule because the page does not provide a later energization, building-completion or tenant-operation milestone.County packet records a distribution and transmission easement for the AREP SOF III TRIC project at 600 Britain Drive. Utility planning is retained separately from construction and energization.
Reviewed 2026-08-28 · next 2026-10-27 · 60d cadence · qualified accuracyHigh for the legal entity, project address and easement action. An easement does not establish substation construction, delivered power, building permits, vertical work or campus opening.Current owner page identifies 3399 Peru Drive, a 20-acre campus, 300,000 square feet, six 10 MW halls, 180,000 square feet of white floor and a 100 MW on-site substation.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyDirect for the address, current marketed facility, physical plan and operating-service claims. Substation rating is not the same as live IT load, customer occupancy or remaining available capacity.Owner announcement calls Tahoe Reno its fourth completed facility and reports a 60 MW, six-hall launch with new capacity available in 2026.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyDirect for the owner's completion and launch claim. The 2026 availability statement is a commercial schedule and does not disclose tenant take-up, live load or current vacancies.Adopted Planning Commission minutes state that 875 Innovation Way was under development with an on-site data center and that construction permits had been issued for the data center and accessory solar field.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the address, parcel, applicant campus relationship and permit issuance stated by county staff. The record does not publish data-center area, MW, permit numbers, builder, field progress, completion or operating date.Current owner portfolio lists the 686-acre, 810 MW Peru Shelf land-development program as owned and in development with construction power available and February 2027 site energization scheduled.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyDirect for the owner-controlled land program and current marketed scope. Capacity and February 2027 energization are development targets, not delivered utility service or tenant data-center load.Developer announcement records commencement of roads, wet utilities and switch-station preparation and names F&P Construction and Westex Geotechnical for initial work.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for Tract's horizontal-infrastructure start and named initial partners. It does not establish vertical customer buildings, tenant commitments, delivered power or current field progress two years later.Current owner page markets a 517-acre, 230 MW envelope contiguous to Peru Shelf with a graded 40-acre pad expandable beyond 100 acres. Its land and utility figures align with Fleet's separate 517-acre / 230 MW Reno disclosure, but the owner does not name Fleet.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyDirect for Tract's land envelope; qualified for the Fleet crosswalk because neither source explicitly names the other. Gridwork attaches this as a probable underlying land record and does not create a duplicate physical-campus count.Current owner page lists 1,534 acres, seven parcels and 1,215 MW planned capacity with September 2027 site energization scheduled and construction power advertised for 2025.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyDirect for the owner-controlled site, parcel count and marketed plan. Scheduled construction power and energization are not independently verified utility-delivery or construction milestones.Current owner portfolio lists an 8,590-acre, eleven-parcel Storey County land program with 2,500 MW planned capacity and industrial zoning.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for ownership marketing, acreage, parcel count and conceptual capacity. Industrial zoning and land ownership do not establish utility commitment, customer, sitework, building permits or construction.Developer announcement records the closed acquisition of industrial-zoned land between TRIC and Virginia City Highlands for future data-center and energy development.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · qualified accuracyDirect for the announced acquisition and intended use. A closed land acquisition is not a construction start, utility award, tenant commitment or operating project.Current owner page lists a 1,063-acre Lyon County / Silver Springs-area park with 700 MW under utility study, favorable zoning and a development agreement.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for the owner-marketed site and stated planning attributes. Capacity under utility study is not committed power, and a development agreement or favorable zoning does not prove sitework or a customer building.Current contractor page advertises laborer, heavy-equipment operator, truck-driver, foreman, office-assistant and project-manager pathways in Northern Nevada without project or requisition IDs.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · qualified accuracyDirect for the employer's broad hiring intake at observation time. Because no requisition ID, posting date, worksite or Peru Shelf assignment is published, these are not normalized as exact project openings.Current owner page identifies an operating Henderson data center, records a 2019 groundbreaking and reports more than $6 billion invested across Henderson and Storey County combined.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyDirect for the owner-operated location and milestone. The statewide investment is never allocated to Henderson alone, and the page does not publish campus MW, street address or current staffing.Current parcel record identifies Jasmine Development LLC, 560 West Warm Springs Road, an approximately 59.95-acre computer-center property and original construction year 2020.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyDirect for the parcel owner, address, assessor use, acreage and improvement record. Assessed values and construction year do not establish Google ownership, delivered IT load, building-by-building status or current expansion.The city's official development-area story identifies Google's Warm Springs Road project and states that the 64-acre site was acquired through Jasmine Development LLC.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyStrong public-sector crosswalk between Google and the assessor's Jasmine Development entity. The city's rounded 64 acres and assessor's approximately 59.95 acres use different boundaries or conventions and are not merged.County emergency-response register lists Jasmine Development LLC's Henderson Data Center - HEN at 520 West Warm Springs Road. The assessor separately uses 560 West Warm Springs Road for the campus parcel.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · qualified accuracyDirect for the registered facility name and emergency-planning address at the plan date. The 520/560 address difference is preserved as a campus-address discrepancy rather than treated as two facilities.Current owner page identifies the operating Core campus and markets up to 495 MW upon completion.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for the current campus identity and owner relationship. Upon-completion MW, density and availability are marketing plans, not commissioned capacity, occupied load or current vacancies.Historical owner announcement records the opening of Las Vegas 10, nearly 350,000 additional square feet and up to 40 MW, bringing the then-current Core campus above two million square feet and up to 315 MW.
Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracyDirect for the 2017 opening milestone and then-published campus scale. Historical capacity is not a current delivered-load measure, and the construction-worker figures are not current vacancies.Current Southern Nevada local workforce board connects job seekers and employers to no-cost coaching, training resources, recruitment and work-based services through EmployNV hubs.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyDirect for current public services in Southern Nevada. It is not evidence of a Google or Switch hiring event, sponsored cohort, reserved seat or placement guarantee.Current owner portfolio distinguishes Downtown and North Las Vegas as two operating facilities and publishes 33,135 square feet / 1.37 MW for Downtown and 111,240 square feet / 9 MW for North.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for current facility identity, marketed footprint and UPS capacity. Published MW is available or design capacity, not utilized customer load, and the page does not disclose staffing or current construction.Owner-published assurance report places the Downtown facility at 302 Carson Avenue / 304 Carson Avenue suites and the North facility at 3330 East Lone Mountain Road.
Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracyStrong for audited-scope addresses at the report date. The two Downtown suite addresses are retained as one owner-marketed facility and the schedule does not establish current floor area, load, occupancy or expansion.Current owner page identifies an operating and recently expanded edge / colocation facility at 7185 Pollock Drive with 57,364 IT square feet and 3.35 MW critical IT load.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for address, operating facility identity and current marketed specifications. Critical-load rating is not measured utilization, and 'recently expanded' does not resolve permit, certificate or completion dates.Owner announcement records acquisition of the LAS1 real estate after an expansion and publishes the then-current raised-floor and critical-load figures.
Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracyDirect for the 2024 property transaction and owner-declared expansion. The older 36,800 raised-square-foot / 3.55 MW figures conflict in definition and date with the current facility page, so they are not combined or presented as a trend.Current employer page links to DataBank's official TalentReef portal. Filtering the board to Nevada produced one current job, assigned to the verified LAS1 street address.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyDirect for the official route and the one-job Nevada result at observation time. The board changes quickly, so the count and status require daily refresh.Current requisition 11095308 lists 7185 Pollock Drive, $25.82–$27 per hour, day and night shifts, a high-school pathway, 0–4 years of experience and certification reimbursement.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyDirect for current role identity, exact LAS1 street address, posting date, pay, shifts, qualifications and benefits. Availability is time-sensitive and requires daily recheck.County operating permit identifies six adjacent Switch data-center campuses, NAP 7 through NAP 12, at 7135 South Decatur Boulevard and inventories covered emergency-power and cooling equipment.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyDirect for the permitted stationary-source identity, address and six named campus components. Air-permit coverage does not establish live IT load, occupancy, available colocation capacity or every building in the broader Core program.County agenda and final action cover waivers, design review and a one-lot tentative map for data-center warehouses on 51.5 acres north of Badura Avenue, east of Jones Boulevard and west of Lindell Road.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyDirect for the NAP 14–16 project name, approved land-use scope, acreage and boundaries. Entitlements do not establish full buildout, delivered capacity, certificate, occupancy or a building-by-building completion date.County technical record identifies a data center at 5660 West Badura Avenue and a significant revision adding 21 emergency generators and 15 cooling towers at a new data center, for a resulting source inventory of 45 generators and 30 cooling towers.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · qualified accuracyDirect for the source address, data-center use and proposed equipment revision. The county air file does not label the source NAP 14–16, so the crosswalk to the same Badura/Jones development envelope remains qualified and equipment is not converted into IT MW.County enforcement docket describes a data-center operation at 5660 West Badura Avenue and a September 2024 compliance evaluation involving an unpermitted emergency fire pump.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyDirect for an operating data-center stationary source at the Badura address in 2024. It does not prove that every NAP 14–16 building was complete, occupied or carrying live IT load.County register lists active dust-control permit 56593-5 for Switch NAP 17 & 18 at Roy Horn Way and Jones Boulevard, covering 28.3 acres and naming Martin-Harris Construction as the permit company through April 4, 2027.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for an active earth-disturbance authorization, project label, acreage, location and named permit company. A dust permit does not prove vertical construction, building count, final design, completion or the legal relationship between this parcel and the Decatur operating source.Filed application names Switch, seven parcels and a NAP 17 & 18 map between Jones Boulevard and Torrey Pines Drive in the Maule / Badura area.
Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · high accuracyDirect for applicant identity, project label and filed parcels. The older application does not establish present construction status or supersede the current dust-control acreage.Current assessor map labels the recorded Las Vegas Switch Campus NAP 17 & 18 subdivision and its parcel geometry.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyDirect for recorded parcel and subdivision continuity. An assessor map is not evidence of vertical construction, certificate, energization or operation.Approved minutes identify Switch's LAS 19 plan as a 56,000-square-foot data center on 8.99 acres east of Edmond Street and north of Warm Springs Road, served from the existing Audette substation.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for unanimous approval, project identity, site, area and applicant-presented design. Statements on water use, cooling and power route are applicant testimony, not measured operating results; approval still requires later aviation, development-agreement and permit steps.County approved the routine companion items for a 55.10-acre data center, electric substation, ancillary structures and one industrial lot south of Serene Avenue and east of Decatur Boulevard under I 15 Mountain LLC filings.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyDirect for approved land-use design and tentative-map scope. The filing does not establish a building permit, construction start, capacity, customer or the later-reported Armory marketing name.Current assessor record lists Switch Ltd as owner of the 9380 South Decatur Boulevard parcel after a May 2026 multi-parcel transaction.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyDirect for current ownership and address of one parcel in the development envelope. It does not by itself establish Switch ownership of every filed acre, a construction award or a completed data center.Active register lists a 23.3-acre I 15 Mountain earthwork permit at Decatur and Richmar plus a separate 1.8-acre demolition permit at 9380 South Decatur / 4740 West Meranto.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for earth disturbance and demolition at the development area. The older broad permit predates the data-center approval and the demolition covers only 1.8 acres, so neither is treated as proof of full data-center sitework.Industry directory uses the Armory name and describes three planned buildings at 9380 South Decatur Boulevard. Gridwork retains the alias for discovery while county filings remain controlling.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracySupporting only for the reported Armory alias and three-building interpretation. County approvals, parcel ownership and permits control lifecycle state and scope.County record classifies 2650 Belmont Street as a new Verizon Wireless mobile switching center with two 3,000 kW and one 500 kW emergency generators.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyDirect for facility type, owner, address and permitted-source equipment. A mobile switching center is digital infrastructure, but it is not represented as a commercial colocation or hyperscale data center and generator rating is not IT load.County docket names Civil Werx on dust-control permit 56727 for the Verizon Belmont Data Center construction project at 2650 Belmont Street and records a September 2024 inspection and violation.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyDirect for Civil Werx's construction-site relationship and the September 2024 field record. It does not establish current contractor mobilization, completion, certificate or operating status.Current parcel record lists Cellco Partnership, doing business as Verizon Wireless, as owner of 2650 Belmont Street and carries current improvement value.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyDirect for parcel ownership, address and assessed improvements. Assessment data do not prove certificate, operating date, network role beyond the separate air permit or present headcount.Current emergency-response register lists Verizon Wireless - MSC Belmont at 2650 Belmont Street.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · qualified accuracyDirect for current emergency-planning registration at the facility address. Registry presence supports continuity but is not a certificate of occupancy, current staffing count or proof that every system is in service.Current contractor page lists five Las Vegas field roles, including heavy-equipment mechanic, finish-blade operator, button-up foreman, heavy-equipment operator and grading foreman.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · qualified accuracyDirect for the five broad Las Vegas hiring paths at observation time. Civil Werx's verified Verizon relationship is from a 2024 dust permit; none of the current roles names Belmont, so no opening is assigned to the project.Official employer search route supports state, location, career-area and team filters. No exact Belmont mobile-switching-center role is normalized in this review.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · qualified accuracyDirect for the official route. Retail roles and generic Las Vegas matches are not reclassified as network-infrastructure or facility jobs, and the board requires frequent refresh.BLM states that it approved construction, operation and maintenance of a data center on 88.5 acres of public land near the existing Townsite Solar 1 project.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyDirect for the federal approval and acreage. Approval is not a construction start, power delivery, financing close or final resolution of Boulder City's appeal.NEPA register identifies Townsite Solar 2 LLC, an 81-acre data-center site plus a four-acre linear-facilities segment and case file NVNV106360814.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyDirect for applicant, case identifiers and federal-land scope. The 81 plus four acre register description and BLM's rounded 88.5-acre announcement are preserved as different source conventions rather than summed.Boulder City says its council unanimously appealed BLM's approval for the 80-acre federal parcel; Townsite's separate city-land application was withdrawn.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyDirect for the city's appeal and separation of the withdrawn city parcel from the still-approved federal right-of-way. It does not by itself stay, revoke or uphold BLM's decision.Applicant site describes an air-cooled closed-loop design, up to 70 MW of battery storage, biodiesel backup generation and a planned 230 kV interconnection; its city-parcel narrative predates the move to adjacent federal land.
Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyDirect for the applicant's proposed technical concept and team. Site language still centers the withdrawn city-owned parcel, so Gridwork does not transfer its acreage, investment or performance claims to the federal parcel without a controlling amendment.Current operator page says isp.net owns and operates redundant downtown Las Vegas data centers, carrier-grade connectivity, its middle- and last-mile network and BGP on AS27501.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for two operator-owned downtown facilities and current colocation service. The page does not publish street addresses, floor area, MW, utilization, generator inventory or a facility-by-facility opening date.Current employer page lists Field Technician, Network Engineer 1, Business Development Executive 1, Sales Development Representative, Customer Support 1 and Customer Support Supervisor openings.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · qualified accuracyDirect for six current employer-controlled role routes at observation time. The postings are Las Vegas employer demand, but none identifies 2595 Fremont or 1221 South Casino Center as the final worksite, so every facility relationship remains regional.Current official requisition lists full-time Las Vegas field work at $18–$20 per hour across routers, switches, radios, fiber, coax, conduit, cabling, testing and field maintenance.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyDirect for current title, city, employment type, pay and duties. It does not name either data center and includes wider customer-network field work, so it is not an exact-facility opening.Current assessor record identifies LV Net Investments LLC as owner of the 0.95-acre, office-classified parcel at 2595 Fremont Street in Sunrise Manor.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyDirect for parcel, address, assessed owner, acreage and assessor use. The office classification does not disprove embedded data-center use, and the assessor is not evidence of current IT load, occupancy or title beyond the displayed assessment record.Current Cogent service-location register classifies LasVegas.net at 2595 Fremont Street as a carrier-neutral data center.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyDirect for Cogent's current network classification and facility address. It confirms carrier-neutral data-center use but not ownership, capacity, utilization, staffing or every carrier present.Historical company release identifies Data Center 2 at 1221 South Casino Center Boulevard and describes four then-local colocation and hosting facilities.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · qualified accuracyDirect for the 2015 DC2 identity and address. The historical four-site claim is not treated as a current facility count; current operator language says two data centers, and the 1221 continuity remains qualified through current employer-address material.Current employer page links to a Keldair board with seven Las Vegas openings. One is explicitly for CCSD / K–12 and is excluded from Switch context; the other six remain regional because none names Switch, Roy Horn Way, NAP 17 or NAP 18.
Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · qualified accuracyDirect for titles, requisition IDs, displayed Las Vegas location and posted month/day. Martin-Harris is permit-named for NAP 17–18, but that relationship does not prove any current role is assigned to the Switch project.Current program page describes an 8,000-hour Inside Wireman apprenticeship and 6,000-hour Installer Technician pathway covering electrical, voice, data, fire-alarm, security and cabling work.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for program scope, minimum qualifications and training hours. The page does not publish a current application window, available seats, employer assignment or a Switch placement agreement.Current CSN program register includes Network Electronics, Utilities Engineering with an Electrical Power concentration, electronics, networking degrees and stackable certification preparation.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyDirect for current academic pathways and published duration or credit ranges. These are adjacent preparation routes, not data-center-specific cohorts, guaranteed certification outcomes or employer placement agreements.Current state register lists eleven Switch addresses across Las Vegas and Tahoe Reno plus Flexential North and DataBank LAS1 as registered hosting centers.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh confidence for current registration and listed addresses. Registration is not a complete data-center inventory, proof of ownership for every suite, delivered-load evidence or a construction milestone; unregistered enterprise and general colocation sites can still exist.Current operator page identifies an operating carrier-neutral Tier-III facility at 1110 Palms Airport Drive, Suite 110 with 24/7 on-site engineering.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for current operator identity, address, services and support model. Tier language is owner-published, and the page does not disclose gross area, IT MW, utilization, staffing count or current construction.Current company history records LAS1 opening in May 2010 and later power and cooling upgrades through 2019.
Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · qualified accuracyUseful owner chronology, not an independent permit or certificate trail. Upgrade statements do not provide cost, MW, permit number, exact completion date or proof of current spare capacity.Current operator data sheet identifies LAS01 at 1541 Pama Lane with a 24,400-square-foot facility, 3,600 square feet of raised floor and 750 kW N+1 power.
Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyDirect for the operator-marketed facility and published configuration. The sheet does not disclose utilized load, current staffing, original certificate, customer occupancy or later expansion.Current network service-location register identifies a Cogent-operated edge data center at 7941 Giles Street, distinct from Cogent points of presence inside other Las Vegas operators.
Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for the operator label and address at observation time. The service register does not publish facility area, IT MW, redundancy, staffing or certificate dates, and carrier-neutral points of presence are not counted as separate buildings.Current employer page lists active roles across sales, support, field services, IT, network engineering and real estate; no reviewed opening names the Giles Street edge facility.
Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · qualified accuracyDirect for listed employer openings at observation time. Roles are not assigned to Las Vegas or the edge facility unless the posting itself names that market and worksite.