Workforce intelligenceUpdated 2026-08-28

Local talent
is infrastructure.

Gridwork tracks data center projects, the companies building them, open roles, and nearby training.

Open jobs, project facts, and forecasts are labeled separately.
Projects181Organizations249Official openings494
01
National project intelligence

See where the work is moving.

Filter the national register, choose a market, and open its jobs, training routes, or delivery network.

Project map
Pre-buildBuildingOperatingInactive
Holly RidgeLA · Building
State geometry · cited project locations · nearby sites separated into rings180 mapped
02
For local workers

Choose the work. Build the route in.

Compare pay, time, cost and qualifications—then move from a real training route to a current opening.

Choose your journey

Build the campus. Run the campus. Move between both.

Start with the work you want—not a list of credentials. Every route shows the shortest credible entry, the longer craft path, and current evidence.

Electrical · Both

Electrician

You want the broadest craft route across construction, commissioning and long-term operations.

Best first moveApply to a registered electrical apprenticeship; helper work can be a bridge but does not replace licensing hours.
Ready to competeWeeks to apply · 4–5 years to journey level
Cash to plan$0–$2k before wages
Education floorHigh school or equivalent; algebra commonly tested
Market signal61 current references2 linked to this project market
Rough pay progression47-2111 · Electricians
Method + source
01 · Early$42k–$54k$20–$260–2 yrs proxy
02 · Established$64k–$84k$31–$403–6 yrs proxy
03 · Senior$90k–$118k+$43–$57+7+ yrs proxy

National BLS occupation percentiles are used as a rough experience proxy: early career tracks the lower market, established tracks the middle, and senior tracks the upper market. It is not a promise tied to exact years. Shift premiums, overtime, union scale, security clearance and local licensing can materially change pay.

Your route inTime and cost are planning ranges—not enrollment quotes.
01
Qualify

Algebra refresh, driver requirements and apprenticeship application

2–6 weeks

$0–$300
02
Apprenticeship

About 2,000 OJT hours/year plus classroom instruction

4–5 years

Paid training
03
License / journey

Independent work subject to state and local rules

State dependent

$50–$500+
Learn this4 blocks

01Electrical theory, math and the National Electrical Code

02Blueprints, one-lines and panel schedules

03Raceway, cable, grounding and terminations

04Lockout/tagout, testing and energized-work boundaries

Prove it hands-on4 reps

01Bend and install raceway to a drawing

02Terminate conductors under supervision

03Trace a one-line from utility to rack PDU

04Use a meter safely and document readings

Training routes2 verified near this project · 1 national
Local partnership does not guarantee placement.
Evidence + refresh5 linked sources · reviewed 2026-08-29 · next 2026-11-29

High-confidence national pathway. Licensing, union scale, overtime and apprentice wage steps are local and must be checked with the sponsor.

Live openings

Search the complete official register.

Owner, contractor, trade, utility and operating roles stay together here. Exact-project, regional and unresolved matches remain labeled.

41 observed
MortensonExact project

Craft Skilled Laborer · Rayville Data Center

Rayville, LA

CivilFull time
Hyperion · Richland ParishOfficial Mortenson requisition explicitly names the Rayville data center; Mortenson's Richland Parish project role is independently verified.
Official posting
MortensonExact project

Structured Cabling Laborer · Logistics Support

Rayville, LA

NetworkFull time
Hyperion · Richland ParishCurrent exact-Rayville structured-cabling role; Mortenson's official project scope includes outside-plant fiber at Richland Parish.
Official posting
MortensonExact project

Civil Craft Surveyor

Rayville, LA

CivilFull time
Hyperion · Richland ParishCurrent exact-Rayville civil role; Mortenson's official Richland Parish scope includes site preparation, grading and underground utilities.
Official posting
MortensonExact project

Structured Cabling Installer

Rayville, LA

NetworkFull time
Hyperion · Richland ParishCurrent exact-Rayville cabling role at the verified Richland Parish builder; the project page confirms fiber-distribution scope.
Official posting
MortensonExact project

Power Ironworker

Rayville, LA

PowerFull time
Hyperion · Richland ParishCurrent exact-Rayville power-delivery role; Mortenson's verified project scope includes medium-voltage distribution and substations.
Official posting
MortensonExact project

Structured Cabling General Foreman

Rayville, LA

NetworkFull time
Hyperion · Richland ParishCurrent exact-Rayville structured-cabling leadership role at the verified Richland Parish builder.
Official posting
03
Methods + sources

Every claim has a trail.

Open the company list, forecast method, job-board coverage, research channels, and source register.

System statuspass

Projects, employers, openings, training routes, and sources stay linked and auditable.

jobs.jsoncontext.json
01Company network249 owners, builders, trades, suppliers + operatorsOpen
Novva Data CentersOwner and operator of the current North Las Vegas facility and the owner-declared completed Tahoe Reno facility at 3399 Peru Drive
Owner / operatorpartial0openingsOfficial board
Fleet Data CentersDeveloper, financed construction sponsor and current Sparks-market employer for the qualified 2300 Peru Drive / Reno program
Owner / operatormonitored18openingsOfficial board
NVPRU01 / NVPRU02 / NVPRU03County-filed owner/applicant entities for SUP 2025-001 at 2300 Peru Drive; later Fleet and state entity continuity remains qualified
Developerqueued0openingsPrimary record
NVPRU04 / NVPRU05County-filed owner/applicant entities for SUP 2025-002 at 2200 Peru Drive; operator and employer remain unresolved
Developerqueued0openingsPrimary record
NVSOV Inc 01–07Seven county-filed owner/applicant affiliates for SUP 2025-003 at 9000 USA Parkway; no operator or hiring route is resolved
Developerqueued0openingsPrimary record
SV RNO Property Owner 1 LLCState incentive applicant for the planned 9500 USA Parkway colocation project; county entitlement and Fleet relationship remain unresolved
Developerpartial0openingsOfficial board
ColovoreOwner/developer of two separately marketed 16 MW Reno-area facilities and direct employer for current market-level operations roles
Owner / operatormonitored2openingsOfficial board
PowerHouse Data CentersAREP-owned developer and owner of the planned PowerHouse Reno powered-shell campus; the utility easement and owner development record do not establish vertical construction or delivered power
Developerpartial0openingsOfficial board
Redwood MaterialsIndustrial-campus owner and applicant associated with the permitted on-site data center at 875 Innovation Way; no commercial colocation operation or external tenant is inferred
Owner / operatorpartial0openingsOfficial board
F&P ConstructionNorthern Nevada civil contractor named by Tract for initial Peru Shelf road and substation grading; later packages and current field presence require refresh
Trade contractorpartial0openingsOfficial board
Westex GeotechnicalGeotechnical engineering firm named by Tract for Peru Shelf's initial horizontal-development program; no vertical-building design role is inferred
Consultantpartial0openingsOfficial board
Amazon Web ServicesCampus owner, cloud operator and direct technical employer; Amazon Data Services is the filed owner of Pecos County Buildings A–C and the reported buyer of the Laveen land bank, where ownership still does not establish a committed build
Owner / operatorpartial81openingsOfficial board
Prime Data CentersDeveloper and hiring company for the eight-building AUS01 Lockhart campus and the actively building five-facility PHX01 campus in Avondale; legal ownership roles remain separately preserved where disclosed
Owner / operatorpartial9openingsOfficial board
ARCO/MurrayPrime-named builder for major site development, underground and private-substation coordination and core-and-shell delivery on PHX01 buildings one through three
General contractorpartial0openingsOfficial board
Lockhart Property LLCTDLR building owner, county development-agreement party, and state-registered owner and operator for AUS 01 02 03
Developerpartial0openingsOfficial board
Paile LLCOccupant named on the Texas AUS 01 02 03 registration; Gridwork does not substitute a wider corporate identity without a controlling first-party or registry record
Owner / operatorqueued0openingsPrimary record
Sundt ConstructionConstruction operator named on AUS01 stormwater authorization and permit-named Phoenix contractor on Menlo Thistle and Aligned Union Hills utility and campus work
General contractormonitored4openingsOfficial board
GenslerDesign firm named on all three Pecos County buildings and the two-shell Prime AUS01 / AUS02 Lockhart registration
Consultantpartial0openingsOfficial board
Bluebonnet Electric CooperativeElectric utility identified on Prime's campus page and, with Tract and LCRA, owner-named planning party for Caldwell Valley's scalable onsite substation; no separate construction package or project-assigned vacancy is public
Supplierpartial0openingsOfficial board
TractOwner and horizontal-infrastructure developer for master-planned data-center parks in Texas, Arizona and Nevada; Tract conditions land for future end users rather than claiming operating customer buildings
Developerpartial0openingsOfficial board
TXLCO Caldwell County LLCLegal developer named in the county's 2025 Caldwell Valley development agreement; no separate public hiring board is exposed and Tract's careers route is the monitored employer path
Developerqueued0openingsPrimary record
Edged U.S.Owner/operator of the opened 36 MW Mesa facility and public owner/operator named by Caldwell County for Maxwell; project legal entities remain separately preserved
Owner / operatorpartial1openingsOfficial board
EDC Austin LLCChapter 312 agreement party, phase-one developer and Texas-registered owner, occupant and operator of the EDC AUSTIN large project; hiring is expected to route through Edged U.S. rather than a separate entity board
Developerpartial0openingsOfficial board
EDC Austin LandCo LLCLegal developer on the executed 192.608-acre phase-two county agreement; no separate public requisition board or operating role is disclosed
Developerqueued0openingsPrimary record
CDE Acquisitions LLCProperty owner named in the statutory EDC Austin abatement notice. The 2026 appraisal roll instead shows Capital Land Investments on the matching 320.35-acre parcel, while other records assign owner-like roles to EDC Austin and Edged. The notice role is preserved without asserting current title, parentage, hiring responsibility or campus operation
Developerqueued0openingsPrimary record
Capital Land Investments I LP100% owner shown on the 2026 appraisal roll for Maxwell property 11780 / 320.35 acres, grantee in the district's indexed 2020 special warranty deed, landholder in agreement surveys and building owner on TDLR registration TABS2026019322. Appraisal ownership is corroborating evidence, not a current title report
Developerpartial0openingsOfficial board
MG2 Architecture CorporationDesign firm named on the $2.8B, 869,684-square-foot Edged Energy-Austin TDLR registration
Consultantmonitored1openingsOfficial board
Lower Colorado River AuthorityOwner-named planning party with Tract and Bluebonnet for Caldwell Valley's onsite substation; the Edged development agreements separately contemplate eventual LCRA or other utility interconnection after interim onsite generation
Supplierpartial0openingsOfficial board
Kinder MorganOperator of the Permian Highway natural-gas pipeline corridor identified on Tract's Caldwell Valley page; proximity is verified, but no onsite-generation contract or construction package is public
Supplierpartial0openingsOfficial board
Norris DesignPlanning and landscape-architecture firm credited on the conceptual Caldwell Valley site-plan exhibits attached to the 2025 county development agreement
Consultantpartial0openingsOfficial board
Pacifico GW LLCApplicant for the separate GW Ranch on-site power-plant record in the same Highway 18 corridor; exact parcel and commercial relationship to Amazon remain unresolved
Supplierpartial0openingsOfficial board
TPA GroupReported seller of the 129-acre W Strickland tract to Amazon; no continuing post-sale development, construction or hiring assignment is assumed
Developerpartial0openingsOfficial board
Grind Capital GroupApplicant on the 2024 13.5-acre Echo Road data-center filing retained as a qualified precursor / parcel-assembly signal within the later ATL 088 envelope
Developerpartial0openingsOfficial board
JE Dunn ConstructionGeneral contractor named on ATL 088's 414,000-square-foot building permit and two early retaining-wall permits
General contractorpartial0openingsOfficial board
Rogers ElectricElectrical contractor named on ATL 088 county permit 2600854-DC for service panels, fixtures and floodlighting
Trade contractorpartial0openingsOfficial board
Big Power Developments 5Applicant of record for Douglas County special-use case S2025-13; no end user, builder or operating company is confirmed
Developerqueued0openingsPrimary record
Alston ConstructionGeneral contractor identified by Amazon and Clinton for the former Delphi plant data-center retrofit
General contractormonitored3openingsOfficial board
NorthPoint DevelopmentFalls Township development partner and Keystone Trade Center redeveloper
Developerpartial0openingsOfficial board
Talen EnergyLong-term carbon-free power supplier to the Salem campus adjacent to Susquehanna
Supplierpartial0openingsOfficial board
MetaCampus owner, construction buyer and operating employer across tracked U.S. markets, including the live Mesa facility
Owner / operatorpartial0openingsOfficial board
MicrosoftCampus owner and operator across Mount Pleasant, Abilene, Douglasville and the operating / expanding West Valley Arizona portfolio
Owner / operatorpartial17openingsOfficial board
Skanska USA BuildingContractor named on three FTY01 building permits totaling 735,304 square feet and $95.861 million in declared value
General contractorpartial0openingsOfficial board
E2 OpticsExact-address low-voltage / electrical contractor named on FTY01 permit J23-0721
Trade contractorpartial0openingsOfficial board
Stantec / Morrison HershfieldCurrent parent of permit-named Morrison Hershfield, which appears on FTY01 alteration J24-0318; the responsible current Stantec team is unresolved
Consultantpartial0openingsOfficial board
Aligned Data CentersOwner/operator across ATL-01, Caprock, DFW-04, Glendale PHX-07 / PHX-13, Phoenix Union Hills and PHX08, plus the separate Chandler PHX-04 and PHX-06 facilities
Owner / operatorpartial21openingsOfficial board
LambdaState-registered occupant/operator at LBB-01 and DFW-04 through named Lambda entities; exact facility hiring is not inferred from corporate roles
Owner / operatorpartial0openingsOfficial board
Ryan CompaniesDeveloper named in the municipal Florence Tech Park and Eloy Southwest Crossing filings, and construction partner named in Aligned's Caprock groundbreaking release; project-specific contract scopes and end users remain distinct
Developerpartial0openingsOfficial board
FS AB LLCLegal owner and operator of record for the qualified Fluidstack Abernathy project; hiring is expected to route through Fluidstack rather than a separate entity board
Developerpartial0openingsOfficial board
FluidstackCurrent Abernathy development and operating platform; acquired TeraWulf's full joint-venture interest in July 2026 and publishes exact-city operating roles
Owner / operatormonitored2openingsOfficial board
AnthropicState-registered occupant of the Fluidstack Abernathy project; its public $50B / job announcement covers a multi-state program and is not allocated to this campus
Platform partnerpartial0openingsOfficial board
TeraWulfFormer 50.1% Abernathy joint-venture member and construction-management participant; sold its full interest effective July 6, 2026
Developerpartial0openingsOfficial board
Holder ConstructionExact-address contractor on ATL-01 and permit-named contractor for STACK PHX02, Iron Mountain AZP3 foundation work and Aligned PHX08 stormwater
General contractorpartial0openingsOfficial board
NetPlanner SystemsExact-address electrical-alteration contractor named on Douglasville permit J25-0088
Trade contractorpartial0openingsOfficial board
The Walsh GroupMount Pleasant general contractor and subcontractor-intake lead
General contractormonitored3openingsOfficial board
KiewitMount Pleasant general contractor and designer named on all ten Frontier data-center registrations; current exact-Abilene data-center hiring is treated as regional until a posting names the campus
General contractorpartial6openingsOfficial board
ACS Digital / CoravelHicks Field developer and delivery platform; Coravel is the ACS–GIP operating brand, and ACS's city agreement covers the five-building campus
Owner / operatorpartial0openingsOfficial board
Vanguard US ServiceCoState-registered Hicks Field operator and ACS affiliate; no separate public careers board is exposed
Facilities partnerqueued0openingsPrimary record
Global Infrastructure PartnersBlackRock-owned 50% Coravel joint-venture partner providing infrastructure investment capability
Platform partnerpartial0openingsOfficial board
GoogleCampus owner, operator and direct technical employer, including operating Nevada locations in Henderson and Storey County plus current Storey expansion activity; the Texas register separately renders Google LLC and Paile LLC in the Hicks Field occupant field while Coravel leaves its customer unnamed
Owner / operatorpartial32openingsOfficial board
Stream Data CentersATLA developer and proposed operator; owner and 100% Stream-badged operator for the live and expanding Phoenix I–VII campus
Owner / operatorpartial0openingsOfficial board
DSVExact-city data center logistics employer with current Royal Road openings; the customer and relationship to Google's developing owned campus are undisclosed
Suppliermonitored3openingsOfficial board
QTS Data CentersDeveloper, builder and operating employer across Cedar Rapids, Turkey, Avondale Hermosa Ranch, Phoenix 3 Glendale and the five-building Phoenix 2 McDowell Road campus
Owner / operatorpartial0openingsOfficial board
The Weitz CompanyQTS Cedar Rapids joint-venture builder, named Lighthouse hiring partner, Comarch Mesa contractor and permit-named core/shell and phase-two contractor for Iron Mountain AZP3
General contractormonitored4openingsOfficial board
Layton ConstructionLayton–Weitz joint-venture builder in Cedar Rapids, Vantage first-building contractor in Goodyear, reported Phoenix 3 participant and permit-named Iron Mountain AZP3 duct-bank contractor
General contractorpartial0openingsOfficial board
Alliant EnergyEnergy and infrastructure partner for the QTS Cedar Rapids campus
Suppliermonitored1openingsOfficial board
Oppidan Investment CompanyDeveloper tied to Cedar Rapids by Iowa's permit system, to Montgomery through the city's named CLOP presenter and Oppidan staff roster, and to Sage Mill through qualified local reporting plus CLOP entity metadata
Developerpartial0openingsOfficial board
Caddell ConstructionCLOP Montgomery building-permit contractor resolved through the exact 445 Dexter Avenue company address; the permit contact is Sam Short
General contractorpartial0openingsOfficial board
Wayne J. Griffin ElectricCLOP Montgomery Phase 1 electrical contractor resolved through the exact Pelham office address and permit contact Mike Irby
Trade contractormonitored4openingsOfficial board
AL-CLY PlumbingCLOP Montgomery plumbing contractor resolved through founder Albert Lee Hagler and the permit's Alton address
Trade contractormonitored3openingsOfficial board
Hardy CorporationNamed supplier and installer for CLOP Montgomery cooling and mechanical work; separate Meta Montgomery permits resolve Hardy plumbing and mechanical packages through the same Birmingham address
Trade contractorpartial0openingsOfficial board
OpenAI / StargateStargate operating and workforce partner, including Lighthouse capacity
Platform partnerpartial2openingsOfficial board
OracleCloud infrastructure sponsor and named Lighthouse hiring partner
Platform partnermonitored4openingsOfficial board
STACK InfrastructureProject Jupiter delivery partner and employer; ATL02, Avondale PHX01 and Phoenix PHX02 developer/operator
Owner / operatormonitored16openingsOfficial board
SAC III AcquisitionsApplicant on the 2025 37-acre Factory Shoals / Linda Lane data-center filing; relationship to STACK ATL02 remains qualified pending affiliate and site-plan confirmation
Developerpartial0openingsOfficial board
BohlerCivil engineer and site-plan consultant named in ATL02's regional-impact filing
Consultantpartial0openingsOfficial board
ECS SoutheastEnvironmental / geotechnical consultant copied on ATL02's issued state stream-buffer approval
Consultantpartial0openingsOfficial board
CsquareCurrent operator of the ATL1 carrier-neutral colocation campus at 375 Riverside Parkway; formerly branded Centersquare
Owner / operatorpartial0openingsOfficial board
FlexentialOwner and operator of Douglasville 1, Douglasville 2, Phoenix Deer Valley and two distinct Las Vegas-market facilities
Owner / operatormonitored2openingsOfficial board
Brasfield & GorrieExact-address contractor named on two Douglasville 1 alteration permits totaling $60 million in declared value
General contractorpartial0openingsOfficial board
DigitalOceanNamed customer deploying GPU infrastructure across two connected halls at Flexential Douglasville 1
Platform partnerpartial0openingsOfficial board
CoreWeaveNamed high-density customer in Flexential's Douglasville market; exact building assignment remains qualified
Platform partnerpartial0openingsOfficial board
Taylor & MathisDeveloper named in Rock House Road DRI 4078 / Project Lighthouse planning records
Developerqueued0openingsPrimary record
Kimley-HornTransportation consultant for Rock House Road / Project Lighthouse and survey / site-plan author credited in both executed Edged Maxwell development agreements
Consultantpartial0openingsOfficial board
Trammell Crow CompanyParent developer behind TC Atlanta Development, the applicant for the approved Douglas Waldrop plan
Developerpartial0openingsOfficial board
HRC EngineersDouglasville civil engineer, surveyor and landscape architect that prepared the filed Douglas Waldrop conceptual site plan
Consultantpartial0openingsOfficial board
NV5Transportation consultant named in the filed Douglas Waldrop and Hickman Property regional-impact records
Consultantpartial0openingsOfficial board
East Village DothanApplicant for the Hickman Property proposal denied by Douglas County in July 2026
Developermonitored0openingsOfficial board
EdgeConneXCurrent operator of LAS01 in Las Vegas and PHX01 in Tempe, developer of Mesa PHX11, and separately reported behind the denied Hickman applicant where that relationship remains qualified
Owner / operatormonitored0openingsOfficial board
Eberly & AssociatesCivil engineer, land planner and landscape architect named on the Hickman Property DRI site plan
Consultantpartial0openingsOfficial board
BorderPlex Digital AssetsProject Jupiter land, power, water, cooling, fiber and community-development partner
Developerpartial0openingsOfficial board
Bloom EnergyProject Jupiter fuel-cell microgrid technology supplier
Supplierpartial0openingsOfficial board
CrusoeAI campus developer, builder and operator
Developermonitored17openingsOfficial board
Turner ConstructionGeneral contractor for Richland Parish and Lebanon, named Lighthouse hiring partner, and owner-confirmed construction lead for Coravel's DFW campus
General contractorpartial26openingsOfficial board
ClaycoVerified Meta Montgomery contractor, qualified Indiana lead and permit-named builder for Menlo Thistle and multiple QTS Phoenix 2 building packages
General contractorpartial0openingsOfficial board
DPR ConstructionRichland Parish general contractor, Meta Mesa named construction partner and Childress hiring participant; the Childress event does not disclose DPR's exact package
General contractorpartial0openingsOfficial board
Lancium Childress LLCOwner/lessee party named with Lancium and Rolling Plains EV Stations in Childress County Phase 4 and Phase 5 tax-abatement agreements
Developerpartial0openingsOfficial board
Rolling Plains EV Stations LLCLandowner/lessee party and principal parcel holder named in the county tax agreements and reinvestment-zone attachments; no public careers board was verified
Developerpartial0openingsOfficial board
Hoffman ConstructionChildress construction hiring participant named by Workforce Solutions Panhandle; its exact prime, concrete, mechanical or specialty scope is not disclosed
General contractorpartial0openingsOfficial board
RosendinElectrical-construction hiring participant named for Childress; exact electrical, substation, controls or low-voltage package remains undisclosed
Trade contractorpartial0openingsOfficial board
Siemens EnergyChildress project hiring participant named at the construction job fair; equipment, field-service and commissioning package remains undisclosed
Supplierpartial0openingsOfficial board
Southland IndustriesChildress construction hiring participant with mechanical, plumbing, piping, HVAC, controls and project-delivery capabilities; exact package is undisclosed
Trade contractorpartial0openingsOfficial board
Target Workforce HousingWorkforce-housing participant named at the Childress project job fair; legal identity, camp scope and stable employer-controlled job board remain unresolved
Facilities partnerpartial0openingsOfficial board
MortensonGeneral contractor for the Richland Parish and Lebanon campuses and TCEQ-named operator for two Caldwell Valley access-construction authorizations
General contractormonitored43openingsOfficial board
Faith Technologies IncorporatedLebanon electrical and low-voltage partner; expected regional service provider for the El Paso project
Trade contractormonitored46openingsOfficial board
Hensel PhelpsGeneral contractor directly awarded Meta's Montgomery campus and construction-information lead named by Meta
General contractorpartial0openingsOfficial board
Plateau ExcavationMeta Montgomery grading and sitework contractor resolved through senior project manager Sean Whitaker and the exact Austell permit address
Trade contractorpartial0openingsOfficial board
Marathon Electrical ContractorsMeta Montgomery electrical contractor resolved through project manager Jamie Stephens and the exact Irondale permit address
Trade contractorpartial0openingsOfficial board
RJ MechanicalMeta Montgomery mechanical contractor resolved through permit contact Joseph D. Martin and the exact Birmingham company address
Trade contractormonitored0openingsOfficial board
WiwynnEl Paso cloud-infrastructure manufacturer expected by the city to provide project services
Supplierpartial0openingsOfficial board
Schneider ElectricEl Paso power-infrastructure manufacturer expected by the city to provide project services
Suppliermonitored1openingsOfficial board
Birdsong ConstructionMississippi civil contractor identified by Amazon as participating in its data center work
Trade contractorpartial0openingsOfficial board
CorningFiber manufacturing and supply-chain partner
Supplierqueued0openingsPrimary record
WalbridgeRichmond County construction manager and contractor-network lead
General contractormonitored2openingsOfficial board
Phillips Heavy CivilRichmond County heavy-civil and critical-infrastructure contractor
Trade contractorpartial7openingsOfficial board
SteelFabRichmond County structural-steel fabricator and project contractor
Suppliermonitored5openingsOfficial board
Slifco ElectricRichmond County electrical contractor
Trade contractormonitored1openingsOfficial board
Gaylor ElectricRichmond County electrical contractor
Trade contractorpartial0openingsOfficial board
icon MechanicalRichmond County mechanical and plumbing contractor
Trade contractorpartial0openingsOfficial board
MasTecRichmond County infrastructure and utility contractor
Trade contractorpartial0openingsOfficial board
SB EnergyMilam campus developer, builder, operator and energy-infrastructure partner
Developermonitored2openingsOfficial board
PSG GroupCurrent onsite Lordstown data center employer; customer and campus identity are undisclosed
General contractormonitored12openingsOfficial board
Evans General ContractorsVerified Atlanta East design-build lead and contractor on Atlanta West permits J24-0499 and J25-0622
General contractorpartial0openingsOfficial board
UESVerified ATL2-A geotechnical, foundation, civil-improvement, structural-inspection and code-compliance partner through its first-party project record
Consultantpartial0openingsOfficial board
Martin Concrete ConstructionQualified ATL2-A concrete and tilt-up supplier/contractor identified in the Tilt-Up Concrete Association project team; owner or permit reconfirmation remains desirable
Trade contractorpartial0openingsOfficial board
TerraconVerified environmental filing consultant for ATL2 stream-buffer work and the separate ATL3 Pippin Section 401 request
Consultantpartial0openingsOfficial board
Thomas & HuttonVerified civil/site-plan design partner across DC BLOX Atlanta East, ATL3 Pippin, Atlanta West and Microsoft FTY01 public records
Consultantpartial0openingsOfficial board
DLB AssociatesVerified Atlanta West MEP and mission-critical design partner named in DC BLOX's original owner announcement
Consultantpartial0openingsOfficial board
CorganVerified Atlanta West design partner, Douglasville 2 permit applicant, DFW-04 fit-out designer, design firm on all three filed Hicks Field buildings, and architect named on EdgeCore's filed Florence test fit
Consultantpartial0openingsOfficial board
Bennett & PlessVerified Atlanta West structural-engineering design partner named by DC BLOX
Consultantpartial0openingsOfficial board
The Outside Line CompanyVerified DC BLOX West medium-voltage subcontractor that completed 260 terminations across metering, distribution and transformer infrastructure
Trade contractorpartial0openingsOfficial board
State Electric SupplyVerified DC BLOX West medium-voltage material supplier through its own package case study
Supplierpartial0openingsOfficial board
Reinforced Wall SystemsExact-address retaining-wall contractor named on Atlanta West permit J24-0213
Trade contractorpartial0openingsOfficial board
Cleveland Electric CompanyExact-address electrical contractor named on Atlanta West permit J25-0087; its live Lithia Springs safety opening remains regional because the requisition does not name the project
Trade contractormonitored1openingsOfficial board
Shambaugh & SonFort Wayne local MEP contractor identified by the city as supporting Google's construction
Trade contractorpartial0openingsOfficial board
Hi-Tech Electric CompanyLocal electrical contractor identified by Fort Wayne as supporting the Google build
Trade contractormonitored3openingsOfficial board
The Hagerman GroupFort Wayne construction company identified by the city as supporting the Google build
General contractorpartial0openingsOfficial board
Brooks Construction CompanyFort Wayne construction company identified by the city as supporting the Google build
General contractormonitored1openingsOfficial board
Fortis ConstructionVerified general contractor for Meta's Cheyenne campus and public-plan-room operator
General contractormonitored4openingsOfficial board
T5 Data CentersAtlanta II colocation operator and Atlanta III development / operations platform; also a current Cheyenne employer where the customer and facility remain undisclosed
Owner / operatormonitored8openingsOfficial board
SwitchDesigner, owner and operator of The Keep in Atlanta, the Citadel campus in Storey County and five separately evidenced Clark County programs: NAP 7–12, NAP 14–16, NAP 17–18, LAS 19 and South Decatur
Owner / operatormonitored31openingsOfficial board
Martin-Harris ConstructionPermit company named on Clark County's active Switch NAP 17–18 dust-control record and Las Vegas-headquartered mission-critical builder
General contractormonitored7openingsOfficial board
I I5 Mountain LLCApplicant of record for Clark County's approved South Decatur data-center, substation and ancillary-structure plan; Switch later appears as owner of the 9380 South Decatur parcel
Developerpartial0openingsOfficial board
Verizon Wireless / Cellco PartnershipOwner and permit applicant for the Belmont mobile switching center; Gridwork does not classify this telecom infrastructure as a commercial colocation campus
Owner / operatorpartial0openingsOfficial board
Civil WerxDust-control permit company identified in the county's 2024 Verizon Belmont construction inspection record
Trade contractorpartial0openingsOfficial board
Townsite Solar 2 LLCBLM right-of-way applicant for the approved but appealed federal-parcel Townsite Data Center proposal near Boulder City
Developerpartial0openingsOfficial board
isp.net / ISP Industries LLCLocally owned network and colocation operator for two separately evidenced downtown Las Vegas facilities, with current local field, network, NOC and support hiring
Owner / operatormonitored6openingsOfficial board
DataBankCurrent owner and operator of LAS1 at 7185 Pollock Drive, including the owner-declared pre-2024 expansion
Owner / operatormonitored1openingsOfficial board
Fiberhub / VegasNAPLocally owned operator of the current LAS1 carrier-neutral facility at 1110 Palms Airport Drive
Owner / operatorqueued0openingsPrimary record
Cogent CommunicationsCurrent operator of the Las Vegas edge data center at 7941 Giles Street; Cogent points of presence inside other campuses are not separate projects
Owner / operatorpartial0openingsOfficial board
Data CanopyCurrent operator at 2480 Rock House Road and colocation reseller inside CyrusOne PHX8 at 2605 S Ellis Street; the Chandler service address is linked to the CyrusOne campus rather than duplicated
Facilities partnerqueued0openingsPrimary record
PricewaterhouseCoopersEnterprise tenant and technology operator whose assurance report identifies the Lithia Springs Georgia Data Center as a primary processing facility
Platform partnerpartial0openingsOfficial board
Beale InfrastructureNamed Project Blue developer coordinating the planned Pima County campus and TEP service; the operating customer remains undisclosed
Developerpartial0openingsOfficial board
Humphrey's Peak Properties LLCBeale special-purpose entity identified in the county land and proposed community-benefit records; it is a project party, not a verified direct hiring company
Developerqueued0openingsPrimary record
Humphrey's Peak Power LLCBeale affiliate named in the Arizona Corporation Commission record for Project Blue's special TEP electric-service agreement
Developerqueued0openingsPrimary record
Ames ConstructionSite-preparation and civil contractor identified in Pima County's May 2026 environmental-enforcement record; no vertical general-contractor award is claimed
General contractormonitored1openingsOfficial board
Tucson Electric PowerElectric utility with an Arizona Corporation Commission-approved special service agreement for Project Blue and related grid work
Suppliermonitored4openingsOfficial board
LanciumLand, power infrastructure and campus development partner across Abilene, Childress and Turkey
Developerpartial0openingsOfficial board
Lancium Turkey LLCRegistered owner, occupant and operator for Lancium Clean Campus — Turkey 1 in the Texas qualified data-center register; the January registration predates QTS's July building-operator announcement
Developerpartial0openingsOfficial board
Lancium Turkey Clean Campus LLCCounty-named applicant for the Turkey Clean Campus reinvestment-zone and requested tax-abatement program; executed amended terms remain to be retrieved
Developerpartial0openingsOfficial board
CBRERichland Parish installer training and data center facilities workforce partner
Facilities partnerpartial1openingsOfficial board
IES CommunicationsRichland Parish data center installation and local technician workforce partner
Trade contractorpartial0openingsOfficial board
CarrierMission-critical HVAC startup, commissioning and field-service employer in the Rayville market
Suppliermonitored1openingsOfficial board
Turner & TownsendOnsite scheduling, project-controls and commercial-management employer in the Richland market
Consultantmonitored2openingsOfficial board
Project Azalea LLCApplicant entity named in McDuffie County's project filings; the end user, ownership chain and construction team remain undisclosed
Developerpartial0openingsOfficial board
Williams Brothers DevelopmentDeveloper tied through county-named applicant representative Cameron Grogan; official portfolio lists completed or permitting North Carolina data-center work, while Azalea's end user remains undisclosed
Developerpartial0openingsOfficial board
Jefferson Energy CooperativePlanned electric supplier named in the DRI; the requested 400 MW was not then available and the upgrade path remained under study
Suppliermonitored3openingsOfficial board
Georgia Transmission CorporationTransmission organization named in the DRI as participating in upgrade studies; no Azalea delivery package or construction award is established
Supplierpartial0openingsOfficial board
Georgia PowerUtility named in the DRI as participating in upgrade studies; no Azalea delivery package, award or project vacancy is established
Supplierpartial0openingsOfficial board
Vantage Data CentersFrontier, Lighthouse, Arizona and Reno NV1 campus developer/operator; scheduled delivery dates remain unconfirmed until later operating evidence appears
Owner / operatorpartial0openingsOfficial board
Vantage TX301–TX310 LLCsTen separate legal owner/operator entities in the Texas qualified-data-center register, each paired with Oracle America Cloud Services as occupant; grouped here for legibility without collapsing the source records
Developerqueued0openingsPrimary record
Gurtz Electric Co.Electrical contractor and Lighthouse hiring partner named by Vantage; specific package remains undisclosed
Trade contractorpartial0openingsOfficial board
H.J. Martin and SonLighthouse hiring partner with a current exact-city commercial drywall opening
Trade contractormonitored1openingsOfficial board
Michels CorporationWisconsin infrastructure contractor and Lighthouse hiring partner; specific package remains undisclosed
Trade contractorpartial0openingsOfficial board
McCarthy Building CompaniesLighthouse hiring partner and city-named general contractor for Vantage Phoenix phase two
General contractorpartial0openingsOfficial board
Nine Mile Data, LLCData-center conditional-use permit applicant; the filing does not establish the complete ownership chain
Developerqueued0openingsPrimary record
Energence Utah, LLCEntity named in the county narrative as planning the data-center complex and related infrastructure
Developerqueued0openingsPrimary record
Elio Energy Group, LLCEntity named on the filed site, utility and power-route plan sheets; its control relationship to the permit entities remains unresolved
Developerqueued0openingsPrimary record
DC BLOXSoutheastern owner, operator and developer across Nashville, Birmingham, Huntsville, Montgomery, Atlanta East, ATL3 Pippin, Atlanta West and North Augusta
Owner / operatorpartial0openingsOfficial board
Burr Computer EnvironmentsQualified MGM1 building-permit contractor resolved from Jeremy Dreiling and BCEI's exact Houston address; the city record prints the license contact rather than company name
General contractorpartial0openingsOfficial board
Luca ElectricVerified MGM1 temporary-power and building-electrical contractor through president Jeff Luca and the exact permit address
Trade contractorpartial0openingsOfficial board
NTT Global Data CentersOwner and operator of the live PH1 facility and the seven-building, 240 MW Mesa campus plan
Owner / operatorpartial0openingsOfficial board
EdgeCore Digital InfrastructureOwner and developer of the permitted Mesa campus, the Reno campus with a county-noticed topping-off milestone, and the prospective Dobson Farms East test fit; the Florence plan remains conceptual and is not a permit or construction document
Owner / operatorpartial0openingsOfficial board
ComarchOwner and operator of the live Phoenix-region data center at 3223 S Ellsworth Road
Owner / operatorpartial0openingsOfficial board
AppleOwner and operator of the Mesa global command data center and Reno Technology Park campus, with current exact-city data-center roles normalized separately
Owner / operatormonitored9openingsOfficial board
CyrusOneOwner/operator of Chandler's operating PHX1–PHX8 campus and named applicant on Mesa's separate issued-permit record at 3255 S 96th Street; specifications and jobs remain address-specific
Owner / operatormonitored6openingsOfficial board
Haydon CompaniesLocal general contractor named by Edged for the completed waterless Mesa data center
General contractorpartial0openingsOfficial board
Salt River ProjectElectric utility named for tracked Mesa and Avondale facilities and owner-published Menlo Thistle service; the Laveen relationship remains geographic and requires a filed service record
Supplierpartial0openingsOfficial board
Light Source CommunicationsFirst network service provider named by Edged for its completed Mesa facility; no public careers board was verified in this research pass
Supplierqueued0openingsPrimary record
Compass DatacentersOwner and developer of current marketed campuses in Goodyear and El Mirage; marketed MW is not treated as energized capacity
Owner / operatorpartial0openingsOfficial board
DCXOwner and operator of online, move-in-ready DCX-GYR1 in Goodyear
Owner / operatorpartial0openingsOfficial board
TBL Mission CriticalCity-named DCX-GYR1 operations partner and permit-named current contractor at Aligned Union Hills
Facilities partnerpartial0openingsOfficial board
Cox BusinessConnectivity provider named by the City of Goodyear for the operating DCX-GYR1 facility
Supplierpartial0openingsOfficial board
Arizona Public ServiceElectric utility identified for tracked West Valley projects and by Phoenix permits for STACK PHX02 and Aligned Union Hills infrastructure; general APS jobs remain regional unless a worksite is named
Supplierpartial0openingsOfficial board
GCONJoint-venture PHX-13 builder named by Lease Crutcher Lewis; no later PHX-12 or PHX-14 package is inferred
General contractorpartial0openingsOfficial board
Lease Crutcher LewisJoint-venture PHX-13 builder with disclosed site, shell, whitespace and MEP scope across two phases
General contractorpartial0openingsOfficial board
TakanockProject Baccara applicant and developer; construction and hiring remain gated behind annexation, rezoning and building permits
Developerpartial0openingsOfficial board
Baccara PowerOnsite power entity named in county records for the certificated 700.2 MW generation proposal
Supplierqueued0openingsPrimary record
Baccara Eagle LandLand and applicant entity preserved from the filed Project Eagle / Baccara record; no separate public careers system is exposed
Developerqueued0openingsPrimary record
Electrical District No. 7Local electric district named in county planning records; a specific construction award or opening is not inferred
Supplierqueued0openingsPrimary record
Menlo DigitalOwner and developer of MD-PHX1 at Thistle Landing; owner percentages are superseded for stage by newer city foundation and shell permits
Owner / operatorpartial0openingsOfficial board
Clune ConstructionPermit-named contractor for Menlo Thistle site work and current Iron Mountain AZP3 data-hall tenant improvements
General contractorpartial0openingsOfficial board
RICORPermit-named civil contractor for Thistle Landing grading, drainage, water, sewer, concrete and pavement-restoration packages
Trade contractorpartial0openingsOfficial board
W. W. ClydePermit-named heavy-civil and fireline contractor across STACK PHX02, Iron Mountain AZP3 and Aligned Union Hills
Trade contractorpartial0openingsOfficial board
Power ContractingPermit-named STACK PHX02 substation, grading, perimeter-wall and civil contractor and Aligned Union Hills substation civil contractor
Trade contractorpartial0openingsOfficial board
Markham ContractingPermit-named grading, drainage, roadway, landscaping and civil contractor across QTS Phoenix 2 DC1–DC5
Trade contractorpartial0openingsOfficial board
Iron Mountain Data CentersOwner/operator of the Phoenix AZP-1/2/3 campus and Scottsdale AZS-1, and a direct operations employer; tenant and operator footprints inside those sites are preserved without duplicating the physical facilities
Owner / operatorpartial0openingsOfficial board
CentersquareCurrent operator of a 40,456-square-foot PHX1 multi-tenant footprint at 615 N 48th Street inside the Iron Mountain Phoenix campus
Owner / operatorpartial0openingsOfficial board
APi GroupPermit-named fire-pump and sprinkler contractor for current Iron Mountain AZP3 life-safety and data-hall packages
Trade contractorpartial0openingsOfficial board
phoenixNAPLocal owner/operator of the 3402 E University flagship and permitted PHX II shell at 3225 E Elwood
Owner / operatorpartial0openingsOfficial board
Derek EngineeringPermit-named commercial-shell contractor for phoenixNAP II at 3225 E Elwood Street
General contractorpartial0openingsOfficial board
Modern PavingPermit-named grading and drainage contractor for phoenixNAP II
Trade contractorpartial0openingsOfficial board
Wilson ElectricPermit-named private fiber utility-trenching contractor for phoenixNAP II
Trade contractorpartial0openingsOfficial board
Apache PipelinesPermit-named underground fireline and backflow contractor for phoenixNAP II
Trade contractorpartial0openingsOfficial board
Dickens Quality DemolitionPermit-named demolition, grading and civil contractor at Aligned PHX08 / Cross Point
Trade contractorpartial0openingsOfficial board
1GServersLocal owner/operator of the La Salle facility and employer hosting a direct on-site data-center / helpdesk technician opening
Owner / operatormonitored1openingsOfficial board
Bud Griffin Customer SupportPermit-named contractor for the 1GServers La Salle commercial remodel and fire-alarm installation
General contractorpartial0openingsOfficial board
ExpedientOperator of PHX1 at 2475 W Townley Avenue
Owner / operatorpartial0openingsOfficial board
Digital RealtyOwner/operator of PHX10 at 120 E Van Buren Street and PHX15 at 2121 S Price Road; the former 1900 S Price complex is not assigned to current Digital Realty hiring
Owner / operatorpartial0openingsOfficial board
H5 Data CentersCurrent operator of the 2600 W Germann Road Chandler colocation facility
Owner / operatorpartial0openingsOfficial board
Lincoln Property CompanyCurrent owner and announced turnkey redevelopment sponsor for the partially occupied 2500 W Frye Road data center
Developerpartial0openingsOfficial board
HorizonIQCurrent operator association for the Chandler flagship at 2500 W Frye Road, preserved separately from Lincoln's property ownership and redevelopment role
Owner / operatorpartial0openingsOfficial board
BA Price Owner LLCDevelopment-agreement party for the denied 3380 S Price Road AI data-center proposal; no active project or hiring relationship remains after the council denial
Developerqueued0openingsPrimary record
Phoenix InternetLocal colocation operator at 2922 W Clarendon Avenue
Owner / operatorpartial0openingsOfficial board
NexusTekManaged-IT operator with a historically documented network operations center and data hall at 1919 W Lone Cactus Drive; current physical scale needs refresh
Owner / operatorpartial0openingsOfficial board
Uniti WholesaleCarrier and operator publishing an ILA colocation site at 1710 E Grant Street
Owner / operatorpartial0openingsOfficial board
LumenCarrier and edge-services operator with a 400G-enabled site at 811 S 16th Street and a presence at PHX10
Owner / operatorpartial0openingsOfficial board
ColoBarnCurrent operator of the 8905 S Beck Avenue Tempe colocation facility
Owner / operatorpartial0openingsOfficial board
CloudniumCurrent service provider marketing the 1005 W Geneva Drive data-center facility; property ownership and continuity from Omnis remain unresolved
Owner / operatorpartial0openingsOfficial board
Insight GlobalStaffing company with one current exact-Tempe data-center engineer contract; the customer and facility address are withheld
Consultantmonitored1openingsOfficial board
11:11 SystemsCurrent operator of the Scottsdale colocation, managed-services and recovery facility associated with 7499 E Paradise Lane; parcel ownership remains separately attributed to the legal property owner in city records
Owner / operatorpartial0openingsOfficial board
US SignalCurrent operator of AZ01 in Gilbert following its September 2024 acquisition of OneNeck; the former OneNeck identity is preserved as ownership history rather than a duplicate facility
Owner / operatormonitored0openingsOfficial board
Ethington & Hwy 84 LLCLegal landowner and Proposition 207 claimant for the southern Bianco corridor parcels; no separate campus developer, operator or hiring board is public
Developerqueued0openingsPrimary record
Vernon Barnes property ownershipIndividual landowner and Proposition 207 claimant for the northern Bianco / Clayton parcels; represented as a record-tracking entity, not an operating employer
Developerqueued0openingsPrimary record
Judd Ventures LLCOwner and applicant named on the approved SunHill comprehensive-plan amendment; no operator, builder or separate public hiring system is resolved
Developerqueued0openingsPrimary record
Rose Law GroupLand-use counsel named in the SunHill county action; relationship establishes entitlement representation, not construction or hiring responsibility
Consultantpartial0openingsOfficial board
Iplan ConsultingPlanning agent named in the SunHill county action; no construction-delivery or operating role is inferred
Consultantpartial0openingsOfficial board
Arizona RR Ranches LLCLandowner named on the approved Frontier West comprehensive-plan amendment; owner status does not establish a committed end user or field start
Developerqueued0openingsPrimary record
W HoldingsApplicant named on the approved Frontier West comprehensive-plan amendment; operator, builder, power developer and public careers route remain unresolved
Developerqueued0openingsPrimary record
Selma & Midway LLCOwner and applicant named on Project Midway's approved comprehensive-plan amendment; no operator or public hiring system is resolved
Developerqueued0openingsPrimary record
IDM CompaniesDeveloper named in Project Midway's filed county application; its in-house construction capability and careers page do not establish a future GC role or a project-assigned opening
Developerpartial0openingsOfficial board
Withey Morris BaughLand-use counsel named as agent on Project Midway's approved county action; entitlement representation is not a construction award
Consultantpartial0openingsOfficial board
CVL ConsultantsPlanning and civil consultant named across the Florence Tech Park and Dobson Farms East and West municipal filings; no construction-delivery or hiring responsibility is inferred
Consultantpartial0openingsOfficial board
Dobson Land Investment II LLCLegal owner named for the Dobson Farms East parcel in the municipal filing; EdgeCore's conceptual test fit is tracked separately from land ownership
Developerqueued0openingsPrimary record
Strand 600 LLCLegal owner named across the Dobson Farms West parcels; no separate operator, builder or public hiring system is resolved
Developerqueued0openingsPrimary record
Coton City Industrial Park LLCLegal property owner named in Eloy's Southwest Crossing PAD filing; Ryan remains the developer and no operating employer is resolved
Developerqueued0openingsPrimary record
Colliers Engineering & DesignCivil engineer named in the filed Project Midway and Southwest Crossing applications; the relationship does not establish construction management, an operating role or assignment of its regional data-center vacancy
Consultantmonitored1openingsOfficial board
Bergin, Frakes, Smalley & OberholtzerLand-use counsel and applicant contact named in the Southwest Crossing municipal record; no construction or hiring responsibility is inferred
Consultantpartial0openingsOfficial board
Vermaland LLCApplicant and land entity behind La Osa's approved 2025 plan amendment and denied 2026 rezone / PAD; no active project hiring is inferred after denial
Developerqueued0openingsPrimary record
02Forecast methodHow phase becomes a role-demand band without fake precisionOpen
01

Normalize every project to a six-stage lifecycle.

02

Map each role family to the phases where it concentrates.

03

Rank now / next / later from sourced project status.

04

Keep public claims, modeled demand, and live vacancies separate.

Comparable / Louisiana3,700 → 5,000

Reported workers after year one → peak construction forecast.

Comparable / Wisconsin~10,000 → 550

Construction contributors → current full-time onsite workforce.

03Job-board coverage48 monitored · 166 partial · 35 queuedOpen
monitored
Fleet Data CentersGreenhouse / Fleet · daily · checked 2026-08-28

Eighteen current Sparks-capable construction, engineering, quality, security, commissioning and cost records are normalized. PR-coded roles remain qualified to 2300 Peru, SV is unresolved to the similarly named state applicant, and every posting without a street address remains regional.

18normalized
partial
Novva Data CentersNovva Careers · weekly · checked 2026-08-28

Official employer route verified. No current exact-address North Las Vegas or 3399 Peru Drive requisition is normalized in this cut.

0normalized
monitored
isp.net / ISP Industries LLCisp.net Careers · daily · checked 2026-08-28

Six current owner-controlled Las Vegas roles are normalized across field, network, support and commercial work. None names Fremont, DC2 or a street address, so every role remains a two-facility regional match.

6normalized
partial
PowerHouse Data CentersAREP Careers · weekly · checked 2026-08-28

Official parent-platform employer route verified. No current requisition is assigned to PowerHouse Reno; owner delivery schedules are not vacancy counts.

0normalized
partial
Redwood MaterialsRedwood Materials Careers · daily · checked 2026-08-28

Official employer route verified. The wider industrial campus has many functions, so no role is normalized as data-center work without exact facilities, critical-power, controls or IT scope.

0normalized
partial
F&P ConstructionF&P Construction Careers · weekly · checked 2026-08-28

Current page advertises six Northern Nevada role families, including laborers, operators, drivers, foremen and project managers. The page does not expose stable requisition IDs or assign an opening to Peru Shelf, so none is counted as a project vacancy.

0normalized
partial
Westex GeotechnicalWestex company and hiring watch · weekly · checked 2026-08-28

Tract names Westex on Peru Shelf, but no stable employer-controlled requisition inventory was resolved. Third-party indexed roles are not normalized without a current official job detail.

0normalized
queued
NVPRU01 / NVPRU02 / NVPRU03Storey County record watch · weekly · checked 2026-08-28

The legal applicant group exposes no separate job board. Monitor permits, deeds and Fleet disclosures without duplicating Fleet openings.

0normalized
queued
NVPRU04 / NVPRU05Storey County record watch · weekly · checked 2026-08-28

No operator or public employer board is resolved for 2200 Peru Drive. Watch later permits, deeds, entity assignments and contractor awards.

0normalized
queued
NVSOV Inc 01–07Storey County record watch · weekly · checked 2026-08-28

Seven legal applicant affiliates expose no verified careers route. Monitor entity, deed, permit, utility and operator records before assigning jobs.

0normalized
partial
SV RNO Property Owner 1 LLCNevada GOED + Storey County record watch · weekly · checked 2026-08-28

The applicant exposes no separate employer board. Fleet's SV-coded Sparks roles remain qualified regional leads until legal and worksite relationships are documented.

0normalized
monitored
ColovoreGreenhouse / Colovore · daily · checked 2026-08-28

Two live Reno operations records are normalized across both owner-marketed facilities. A swing-shift role still present in search indexing was absent from the live board and was excluded.

2normalized
monitored
Sundt ConstructionOracle Recruiting / Sundt · daily · checked 2026-08-28

Official filtered inventory showed 46 data-center roles and four that include Lockhart. Three are exact-Lockhart records and one lists Lockhart with Temple. TCEQ independently verifies Sundt as AUS01's construction operator; refresh daily and verify the assigned worksite before applying.

4normalized
partial
Prime Data CentersPrime Careers / Rippling · daily · checked 2026-08-28

The live owner page showed 59 total positions, seven normalized Lockhart records and two current exact-Avondale construction records. Older cached Avondale roles absent from the live board were excluded; refresh daily because the Prime frontend and Rippling details can lag one another.

9normalized
partial
ARCO/MurrayGreenhouse / ARCO/Murray · daily · checked 2026-08-28

Official builder board exposed 107 company-wide records. No current exact-Avondale requisition was normalized, so general mission-critical and traveling roles are not assigned to PHX01.

0normalized
partial
Lockhart Property LLCPrime careers and public-record watch · weekly · checked 2026-08-28

Lockhart Property is the legal owner/operator but exposes no separate employer board. Prime's seven Lockhart records are normalized once under Prime; county, TDLR and register changes are watched here without duplicating vacancies.

0normalized
queued
Paile LLCTexas Comptroller legal-role watch · weekly · checked 2026-08-28

Paile is the registered occupant and no separate public careers route is asserted. Monitor the state record and controlling first-party disclosures before resolving a wider identity or assigning jobs.

0normalized
partial
TractTract Careers / resource index · weekly · checked 2026-08-28

Official owner route verified. No current posting observed names Caldwell Valley, Buckeye, Peru Shelf, South Valley, Virginia Highlands, Sapphire, Storey County or Silver Springs; older resource pages are excluded from live project hiring.

0normalized
queued
TXLCO Caldwell County LLCTract careers + Caldwell County record watch · weekly · checked 2026-08-28

The agreement entity exposes no separate public job board. Watch Tract's official route, county plats and permits, contractor awards and entity changes without duplicating or inventing vacancies.

0normalized
partial
Edged U.S.Edged U.S. Careers · daily · checked 2026-08-28

Official owner route verified. One employer-attributed remote commissioning-manager listing that prefers greater-Austin candidates is normalized as regional; no current role names Maxwell or the completed Mesa facility, and the careers module needs daily re-enumeration.

1normalized
partial
EDC Austin LLCCaldwell County + Texas legal-role watch · weekly · checked 2026-08-28

Legal owner/operator and agreement entity has no separate public hiring board. Monitor Edged careers, county permits / inspections, annual incentive certifications and the Texas register without duplicating owner vacancies.

0normalized
queued
EDC Austin LandCo LLCCaldwell County phase-two record watch · weekly · checked 2026-08-28

Phase-two legal developer exposes no separate employer board. Watch floodplain, grading, vertical-permit, assignment and contractor records; hiring is not inferred from the entity name.

0normalized
queued
CDE Acquisitions LLCCaldwell statutory-notice + property-record watch · weekly · checked 2026-08-28

The statutory notice names CDE Acquisitions as property owner, but the 2026 appraisal roll returns Capital Land Investments on the matching parcel and exact-name 2026-roll searches did not resolve CDE. The roll trails recordings and is not a title report; monitor county-clerk deeds, assignments, permits and the Texas legal-role register without duplicating Edged jobs.

0normalized
partial
Capital Land Investments I LPTDLR + Caldwell CAD / clerk record watch · weekly · checked 2026-08-28

The 2026 roll and indexed 2020 deed corroborate Capital Land on property 11780, while TDLR names it building owner. The appraisal roll was processing ownership changes only through April 29, 2026 and is not legal title; monitor county-clerk deeds, assignments, permits and inspections, and do not substitute Edged openings as this entity's jobs.

0normalized
monitored
MG2 Architecture CorporationMG2 Careers · weekly · checked 2026-08-28

One current official fully remote Project Architect – Data Centers role is normalized as a regional supplier lead. TDLR verifies MG2 at Maxwell, but the posting does not name Edged or the campus.

1normalized
partial
Lower Colorado River AuthorityLCRA Careers · weekly · checked 2026-08-28

Official Texas transmission, engineering, project-management and operations board verified. No reviewed requisition names Caldwell Valley, the Tract LCRA access drive or Edged Maxwell; agreement language contemplates future utility service but does not assign LCRA work.

0normalized
partial
Kinder MorganKinder Morgan Careers · weekly · checked 2026-08-28

Official field, trades, safety, engineering and project-management board verified. Pipeline proximity is not a Caldwell Valley package; no opening is project-assigned.

0normalized
partial
Norris DesignNorris Design Careers · weekly · checked 2026-08-28

Official Texas-filterable route verified for the site-plan consultant. No current posting names Caldwell Valley, so no planning role is assigned to the project.

0normalized
partial
Bluebonnet Electric CooperativePaylocity / Bluebonnet Electric · daily · checked 2026-08-28

Official utility careers route and year-round apprentice pool verified. No current requisition is assigned to either the Prime or Caldwell Valley onsite-substation program; worksite and project linkage must be confirmed on the employer record.

0normalized
partial
ACS Digital / CoravelACS Group careers · weekly · checked 2026-08-28

Official group careers route verified. No stable public posting in this cut names Coravel, Hicks Field or the Fort Worth campus; subsidiary boards require separate monitoring.

0normalized
queued
Vanguard US ServiceCoACS / Texas legal-role watch · weekly · checked 2026-08-28

No separate Vanguard US ServiceCo public careers board is exposed. Monitor ACS, Coravel, Turner and the state legal-role record without inventing an employer route.

0normalized
partial
Global Infrastructure PartnersBlackRock Careers · weekly · checked 2026-08-28

Official parent careers route verified. No Fort Worth or Coravel-assigned role is normalized in this review.

0normalized
partial
LambdaAshby / Lambda · daily · checked 2026-08-28

Official board verified. The Texas register resolves Lambda to LBB-01, but no current requisition reviewed names Abernathy or LBB-01, so no vacancy is assigned to Caprock.

0normalized
partial
Ryan CompaniesRyan Companies Careers · daily · checked 2026-08-28

Ryan is verified on Caprock, Florence Tech Park and Southwest Crossing. No stable exact-Abernathy, Florence or Eloy requisition is normalized in this cut; keep the named customer, worksite and project confirmation in the application path.

0normalized
partial
CVL ConsultantsCVL Consultants careers · weekly · checked 2026-08-28

Official consultant careers route verified. The Florence filings establish CVL's entitlement and civil-planning role, but no current opening is assigned to a Dobson Farms parcel without a named project or worksite.

0normalized
queued
Dobson Land Investment II LLCFlorence parcel and case watch · weekly · checked 2026-08-28

The legal land entity exposes no separate public hiring system. Monitor deeds, implementing zoning, site plans, permits and EdgeCore disclosures without duplicating EdgeCore or consultant roles.

0normalized
queued
Strand 600 LLCFlorence parcel and case watch · weekly · checked 2026-08-28

The legal land entity exposes no separate public careers board. Watch deeds, PUD or zoning cases, site plans, permits and operator disclosures before assigning any vacancy.

0normalized
queued
Coton City Industrial Park LLCEloy case and parcel watch · weekly · checked 2026-08-28

The legal property owner exposes no separate public careers system. Monitor the signed ordinance, deeds, site plans, permits and Ryan disclosures without duplicating developer openings.

0normalized
monitored
Colliers Engineering & DesignColliers Engineering & Design careers · daily · checked 2026-08-28

One current Phoenix-eligible data-center architecture role is normalized as regional demand. Filed civil-engineering relationships to Project Midway and Southwest Crossing do not establish that the requisition serves either project.

1normalized
partial
IDM CompaniesIDM Companies careers · weekly · checked 2026-08-28

Official construction, residential and corporate career areas verified. No current requisition was assigned to Project Midway; inspect the live employer feed by Arizona location and project reference before normalizing a role.

0normalized
partial
Bergin, Frakes, Smalley & OberholtzerBFSO firm and Eloy case watch · weekly · checked 2026-08-28

Firm route and municipal applicant relationship are verified. No stable public requisition system or Southwest Crossing-specific opening is exposed; legal representation is not construction employment.

0normalized
partial
FS AB LLCTexas register + SEC filing watch · weekly · checked 2026-08-28

FS AB is the legal owner/operator of record and does not expose a separate public hiring system. Hiring routes through Fluidstack; watch registration, ownership, permit and inspection changes without inventing an entity job board.

0normalized
monitored
FluidstackAshby / Fluidstack · daily · checked 2026-08-28

The live structured feed exposed two sole-location Abernathy operating roles. Older indexed multi-location snippets were excluded because the current feed is the controlling availability source.

2normalized
partial
AnthropicAshby / Anthropic · daily · checked 2026-08-28

Official board verified. Anthropic is the registered occupant, but no reviewed requisition identifies Abernathy, FS AB or the 168 MW campus; do not assign corporate infrastructure roles by inference.

0normalized
partial
TeraWulfTeraWulf Careers · weekly · checked 2026-08-28

TeraWulf's historical development and construction-management relationship is filed, but it sold its full Abernathy interest in July 2026. No opening is treated as current campus demand after that exit.

0normalized
partial
Evans General ContractorsEvans General Contractors Careers · weekly · checked 2026-08-28

Official contractor careers route verified. No stable current Conyers or ATL2 requisition detail was exposed in this cut, so no opening is normalized or assigned to Atlanta East.

0normalized
partial
UESUES Careers · weekly · checked 2026-08-28

Official board exposes Georgia geotechnical, materials-testing and inspection work. Exact ATL2-A assignment is not stated, so no opening is normalized to the project.

0normalized
partial
Martin Concrete ConstructionMartin Concrete Careers · weekly · checked 2026-08-28

Official company and internship route verified. No current stable Conyers or ATL2-A requisition was exposed in this cut.

0normalized
partial
TerraconTerracon Careers · weekly · checked 2026-08-28

Forty-seven Georgia records were visible on the official state board. None names ATL2, ATL3 Pippin or DC BLOX, so the route remains regional and unnormalized.

0normalized
partial
Thomas & HuttonLever / Thomas & Hutton · weekly · checked 2026-08-28

Official civil/site and water-resources board verified. No posting identifies the ATL2 or ATL3 worksite, so no opening is assigned to either project.

0normalized
partial
DC BLOXAshby / DC BLOX · daily · checked 2026-08-28

Official feed exposes five current Atlanta corporate openings and no Nashville requisition. Continue daily monitoring while Grassmere remains contested and preconstruction.

0normalized
partial
Burr Computer EnvironmentsBCEI company careers intake · weekly · checked 2026-08-28

Company profile publishes careers@bcei.com. No stable requisition detail or Montgomery-specific role is exposed; the MGM1 contractor relationship remains qualified pending a company-named permit or owner disclosure.

0normalized
partial
Luca ElectricLuca Electric careers route · weekly · checked 2026-08-28

Official company route verified for the MGM1 electrical contractor. Stable open-position detail pages were not exposed in this evidence cut.

0normalized
queued
Nine Mile Data, LLCNine Mile Data public-record watch · queued · checked pending

No official company careers route is disclosed. Watch county building permits, business-license records and applicant updates before assigning vacancies.

0normalized
queued
Energence Utah, LLCEnergence Utah public-record watch · queued · checked pending

No stable public employer board was located. Entity role is limited to the county narrative until a direct corporate disclosure clarifies ownership and hiring.

0normalized
queued
Elio Energy Group, LLCElio Energy public-record watch · queued · checked pending

No official project requisition system was exposed. Monitor filed plan revisions, entity records and contractor awards.

0normalized
partial
Vantage Data CentersVantage Careers · weekly · checked 2026-08-28

Official owner board verified for Port Washington, Shackelford, Goodyear and Reno NV1 monitoring. Exact Reno matching remains to be enumerated; no requisition is campus-assigned without a location and worksite signal.

0normalized
partial
Gurtz Electric Co.Gurtz Electric hiring contact · weekly · checked 2026-08-28

Vantage verifies Gurtz as a Lighthouse hiring partner, but no stable public requisition system was exposed in this cut.

0normalized
monitored
H.J. Martin and SonViewpoint / H.J. Martin · daily · checked 2026-08-28

One current exact-city Port Washington commercial drywall opening normalized as regional because the detail does not name Lighthouse.

1normalized
partial
Michels CorporationGreenhouse / Michels · daily · checked 2026-08-28

Official contractor board verified; exact Port Washington matching is pending.

0normalized
partial
McCarthy Building CompaniesMcCarthy Careers · weekly · checked 2026-08-28

Official builder board verified; exact Port Washington and Goodyear matching is pending, and the Vantage phase-two relationship does not assign general Arizona roles.

0normalized
partial
Project Azalea LLCProject Azalea public site · weekly · checked 2026-08-28

Applicant page and county register were checked. No official careers or subcontractor intake exists; monitor signed disposition, permits and filings for the end user and construction team before assigning jobs.

0normalized
partial
Williams Brothers DevelopmentWilliams Brothers Development · weekly · checked 2026-08-28

Official portfolio and Cameron Grogan relationship verified against the county record. No careers board, subcontractor intake or Azalea delivery roster is exposed.

0normalized
monitored
Jefferson Energy CooperativeJefferson Energy Cooperative Careers · daily · checked 2026-08-28

Three live employer-controlled openings normalized. Every role remains regional because no posting names Project Azalea, parcel 00710034 or a Thomson worksite.

3normalized
partial
Georgia Transmission CorporationGeorgia Transmission Careers · daily · checked 2026-08-28

Fifteen live Tucker headquarters roles observed across transmission planning, substation, relay, land, fiber, reliability and support functions. The DRI establishes study participation only, so none is normalized to Azalea.

0normalized
partial
Georgia PowerGeorgia Power / Southern Company Careers · weekly · checked 2026-08-28

Official statewide careers route verified. Upgrade-study participation does not establish an Azalea package or vacancy; normalize only a future posting with relevant geography and employer-controlled detail.

0normalized
monitored
CrusoeAshby · daily · checked 2026-08-27

Official rendered listings normalized for Abilene, Childress and Haskell.

17normalized
partial
MicrosoftMicrosoft Careers · daily · checked 2026-08-28

Six exact Abilene records, ten Mount Pleasant records and one Atlanta-metro role are normalized. Official Goodyear and El Mirage searches produced no exact current result; mirrors are excluded.

17normalized
partial
Skanska USA BuildingSkanska USA Careers · weekly · checked 2026-08-28

Official construction board verified for the contractor named on three FTY01 building permits. No current stable requisition in this cut names 1601 North River Road or Microsoft Douglasville.

0normalized
partial
E2 OpticsiCIMS / E2 Optics · daily · checked 2026-08-28

Official openings and company-wide low-voltage, safety and BICSI training verified. No stable current record is normalized to FTY01 or 1601 North River Road.

0normalized
partial
Stantec / Morrison HershfieldStantec Careers · weekly · checked 2026-08-28

Official current-parent route verified for permit-named Morrison Hershfield. No requisition is assigned to FTY01 without a named worksite or package.

0normalized
partial
Holder ConstructionHolder Current Opportunities · weekly · checked 2026-08-28

Official construction board verified for the contractor on ATL-01 alteration J23-0594. No current stable requisition names ATL-01 or 1551 North River Road.

0normalized
partial
Brasfield & GorrieiCIMS / Brasfield & Gorrie · weekly · checked 2026-08-28

Official mission-critical, field, trade and professional board verified for the contractor on two Douglasville 1 alterations. No current stable requisition names 1700 North River Road.

0normalized
partial
Aligned Data CentersWorkday / Aligned · daily · checked 2026-08-28

Twenty-one official records are normalized across ATL-01 and the Phoenix portfolio, including four current Phoenix-market roles eligible for PHX-04 / PHX-06. One duplicate customer-program result remains excluded; multi-site placement is never guaranteed.

21normalized
partial
NetPlanner SystemsNetPlanner Career Center · weekly · checked 2026-08-28

Official company careers route verified. Georgia structured-cabling and service roles remain regional because no employer detail page in this cut names ATL-01 or 1551 North River Road.

0normalized
partial
JE Dunn ConstructionSAP SuccessFactors / JE Dunn · daily · checked 2026-08-28

Official craft, early-career and professional board verified for the ATL 088 general contractor. No current stable posting in this cut names 2341 Echo Road, so no JE Dunn role is assigned to the project.

0normalized
partial
Rogers ElectricHRMDirect / Rogers Electric · daily · checked 2026-08-28

Official employer board verified for ATL 088's electrical contractor. Georgia construction and field openings remain to be normalized and require a named worksite before project assignment.

0normalized
queued
Big Power Developments 5Douglas County public-record watch · queued · checked 2026-08-28

No official company careers route, operator or builder is disclosed. Monitor adopted minutes, appeals, refilings, entity records and permits before assigning an opening or modeling labor demand.

0normalized
partial
Stream Data CentersStream Data Centers Careers · weekly · checked 2026-08-28

Official employer route verified. No stable current requisition names Goodyear, Winston, ATLA or either exact worksite, so no opening is assigned.

0normalized
monitored
The Walsh GroupWorkday / Walsh Group · daily · checked 2026-08-27

Three official unexpired Mount Pleasant data-center records normalized; already-expired requisitions were excluded.

3normalized
partial
KiewitKiewit Careers · daily · checked 2026-08-28

Six stable exact-Abilene data-center records normalized across materials, emergency medicine, quality and fiber. More list-only Abilene results remain discoverable; no posting names Frontier, so every role is a qualified regional match.

6normalized
queued
Vantage TX301–TX310 LLCsTexas Comptroller register · weekly · checked 2026-08-28

Legal-entity and occupant watch only. These LLCs do not expose separate job boards; hiring routes through Vantage, Oracle and verified delivery firms.

0normalized
partial
MetaMeta Careers · weekly · checked 2026-08-28

Official Data Center board verified; no exact Richland, Lebanon, El Paso, Cheyenne, Montgomery or Mesa result is normalized in this cut.

0normalized
partial
Amazon Web ServicesAmazon Jobs · daily · checked 2026-08-28

Live records normalized across tracked AWS markets, including seven Lithia Springs / Douglasville controls, operations, network-delivery and paid work-based-learning records. Every Georgia record remains regional because no requisition names ATL 088, 2341 Echo Road, ATL068 / ATL078 or 7800 W Strickland; shared multi-market records are not duplicated.

81normalized
partial
TPA GroupTPA Group company / public-record watch · weekly · checked 2026-08-28

Official digital-infrastructure capability is verified, but no public jobs board or W Strickland project page is exposed. Monitor the company site and local records without treating the reported seller as the current builder or employer.

0normalized
monitored
Alston ConstructionBambooHR / Alston Construction · daily · checked 2026-08-27

Three current mission-critical postings identify Jackson as the project location across field supervision and quality; all remain regional because the customer and exact Clinton worksite are not named.

3normalized
partial
NorthPoint DevelopmentHRMDirect / NorthPoint · weekly · checked 2026-08-27

Official developer board verified; no Falls Township or Pennsylvania-specific role is normalized in this evidence cut.

0normalized
partial
Talen EnergyTalen Energy Careers · weekly · checked 2026-08-27

Official careers route verified for Susquehanna and power-infrastructure work; stable same-day Berwick requisition URLs remain to be normalized.

0normalized
partial
GoogleGoogle Careers · daily · checked 2026-08-28

One Lithia Springs, seven Cedar Rapids, ten Monrovia, nine Haskell, one Fort Wayne and four Michigan City-capable roles normalized; two Cedar search spillovers were excluded. No current record is assigned to Henderson, Storey County, Hicks Field or Fort Worth.

32normalized
monitored
DSVDSV Careers · daily · checked 2026-08-27

Three current exact-city Michigan City data center logistics roles normalized across associate, team lead and supervisor levels; the customer remains undisclosed.

3normalized
partial
QTS Data CentersPhenom / QTS Data Centers · weekly · checked 2026-08-28

Official owner board verified; no current reviewed detail names Cedar Rapids, Avondale or Phoenix 3 Glendale, so no QTS opening is campus-assigned in this snapshot.

0normalized
monitored
The Weitz CompanyWeitz Careers · daily · checked 2026-08-27

Four current official Cedar Rapids data center leadership and project-delivery detail pages normalized; the location board exposes additional roles for later ingestion.

4normalized
partial
Layton ConstructionLayton Construction Careers · weekly · checked 2026-08-28

Official builder route verified for Cedar Rapids, Goodyear and Phoenix 3 monitoring. Historical or reported participation does not establish a current Glendale package or vacancy without exact requisition and permit evidence.

0normalized
monitored
Alliant EnergyWorkday / Alliant Energy · daily · checked 2026-08-27

One current official Cedar Rapids-capable grid-protection role normalized as regional because the QTS campus assignment is not stated.

1normalized
partial
Oppidan Investment CompanyOppidan Careers · weekly · checked 2026-08-28

Official developer page lists construction and asset-management openings, but none identifies Cedar Rapids, Montgomery, Aiken, Graniteville or either CLOP project.

0normalized
partial
Caddell ConstructionCaddell Careers · weekly · checked 2026-08-28

Official Montgomery-based employer board and Mission Critical career path verified. No stable posting in this cut names Oppidan, CLOP or 6220 Perimeter Parkway.

0normalized
monitored
Wayne J. Griffin ElectricWayne J. Griffin Electric · weekly · checked 2026-08-28

Four current Alabama intakes normalized across apprentice, electrician, foreperson and project engineer. Each remains regional because the employer board does not name the CLOP project.

4normalized
monitored
AL-CLY PlumbingAL-CLY Plumbing · weekly · checked 2026-08-28

Three current statewide plumbing intakes normalized. The verified CLOP contractor relationship does not establish project assignment for an applicant.

3normalized
partial
Hardy CorporationHardy Corporation Careers · weekly · checked 2026-08-28

Official mechanical-contractor openings and general application route verified. Individual requisitions remain to be normalized and none is assigned to the CLOP site.

0normalized
partial
OpenAI / StargateOpenAI Careers · daily · checked 2026-08-28

Current Abilene-or-Savannah commissioning role and Ohio data-center community-engagement role normalized as regional; broader Stargate role matching remains in progress.

2normalized
monitored
OracleOracle Data Center Careers · daily · checked 2026-08-28

Four distinct current exact-market Shackelford construction-management requisitions remain live; national data center and Catalyst pathways stay available for broader monitoring.

4normalized
monitored
STACK InfrastructureWorkday / STACK · daily · checked 2026-08-28

All 16 current Santa Teresa-capable Workday records are normalized for Project Jupiter. No current record in this cut names Lithia Springs, ATL02, Avondale or PHX01, so none is cross-linked to either Georgia or Arizona.

16normalized
partial
SAC III AcquisitionsDouglas County public-record watch · weekly · checked 2026-08-28

No public employer identity or requisition board resolved. Monitor zoning disposition, deeds, site plans and affiliate records before treating SAC III as an operating employer.

0normalized
partial
BohlerBohler Careers · weekly · checked 2026-08-28

Official consultant board verified; no current record is assigned to ATL02 or 808 Factory Shoals Road.

0normalized
partial
ECS SoutheastECS Limited Careers · weekly · checked 2026-08-28

Official consultant board verified; no current opening names ATL02 or the Lithia Springs worksite.

0normalized
partial
CsquareCsquare Careers · weekly · checked 2026-08-28

Official operator careers route verified. The linked opening system still requires full enumeration; no exact ATL1 or Lithia Springs vacancy is normalized.

0normalized
monitored
FlexentialGreenhouse / Flexential · daily · checked 2026-08-28

One exact-owner-site Las Vegas North technician role and one multi-city Las Vegas-eligible customer-success role are normalized. No current record is assigned to Downtown, Douglasville 1 or 2, or Phoenix Deer Valley without location evidence.

2normalized
monitored
DataBankTalentReef / DataBank · daily · checked 2026-08-28

The Nevada state filter returned one current requisition, Data Center Technician 1, at the exact verified LAS1 address of 7185 Pollock Drive.

1normalized
monitored
Martin-Harris ConstructionKeldair / Martin-Harris · daily · checked 2026-08-28

All seven current Las Vegas records are normalized. The CCSD / K–12 role is explicitly excluded from Switch context; the other six remain regional because none names Switch, Roy Horn Way, NAP 17 or NAP 18.

7normalized
partial
I I5 Mountain LLCClark County planning and permit watch · weekly · checked 2026-08-28

The legal applicant exposes no separate hiring board. Monitor later permits, awarded contractors and Switch careers instead of inventing entity-level openings.

0normalized
partial
Verizon Wireless / Cellco PartnershipVerizon Careers · daily · checked 2026-08-28

Official employer board verified. No reviewed infrastructure requisition is assigned to the Belmont mobile switching center.

0normalized
partial
Civil WerxCivil Werx Careers · weekly · checked 2026-08-28

Five Las Vegas field-role categories are visible, but they lack requisition IDs, dates and a Belmont assignment. The 2024 project relationship is not treated as current exact-site demand.

0normalized
partial
Townsite Solar 2 LLCTownsite project and BLM record watch · weekly · checked 2026-08-28

Applicant information is current, but no discrete requisition board or project-assigned opening exists. Hiring remains gated by the appeal and delivery milestones.

0normalized
queued
Fiberhub / VegasNAPFiberhub company and contact watch · weekly · checked 2026-08-28

Current operator and 24/7 on-site engineering are verified, but no stable public requisition board was found. Monitor the company route and local workforce channels without converting staffing language into vacancies.

0normalized
partial
Cogent CommunicationsCogent Careers · weekly · checked 2026-08-28

Official role list verified. Current field, network, support and critical-facilities openings are monitored, but none names Las Vegas or 7941 Giles Street in this cut.

0normalized
partial
DigitalOceanDigitalOcean Careers · weekly · checked 2026-08-28

Official customer board route verified; no exact Douglasville facility role is normalized, and the colocation announcement does not imply customer-employed site hiring.

0normalized
partial
CoreWeaveCoreWeave Careers · weekly · checked 2026-08-28

Official customer board route verified. No exact Douglasville role is normalized and the precise building relationship remains qualified.

0normalized
queued
Taylor & MathisDeveloper and Douglas County record watch · queued · checked 2026-08-28

Primary filings verify the developer, but no public requisition board or active construction-start notice was found. Monitor entity, incentive and permit records.

0normalized
partial
Kimley-HornKimley-Horn Careers · weekly · checked 2026-08-28

Official consultant board verified. No current opening is assigned to Rock House DRI 4078, 1971 Rock House Road or the Edged Maxwell survey / site-plan work.

0normalized
partial
Trammell Crow CompanyTrammell Crow Company Careers · weekly · checked 2026-08-28

Official developer route verified. The linked CBRE opportunity system still requires full enumeration; no exact Winston or Douglas Waldrop role is normalized.

0normalized
partial
HRC EngineersHRC recruiting and project-record watch · weekly · checked 2026-08-28

A historical 2024 Douglasville civil-engineer / intern notice was found, but it is not treated as current. Monitor the consultant site and local filings for live intake and additional Waldrop scope.

0normalized
partial
NV5iCIMS / NV5 · weekly · checked 2026-08-28

Official consultant ATS verified. No current record is assigned to Douglas Waldrop or the denied Hickman proposal; Georgia results still require structured location and worksite matching.

0normalized
monitored
East Village DothanDouglas County appeal and refiling watch · weekly · checked 2026-08-28

The July 2026 denial controls. Monitor only for appeal, refiling, annexation or ownership change; do not expose forecast jobs from the denied proposal.

0normalized
monitored
EdgeConneXRippling / EdgeConneX · daily · checked 2026-08-28

The full board exposed 37 current roles and a Las Vegas search returned zero. No role is assigned to LAS01; no Georgia role is assigned to the denied Hickman proposal.

0normalized
partial
Eberly & AssociatesEberly careers and consultant-record watch · weekly · checked 2026-08-28

The DRI verifies Eberly's civil-design role on the denied concept. No current requisition or continuing Hickman assignment is normalized.

0normalized
partial
BorderPlex Digital AssetsProject Jupiter vendor intake · weekly · checked 2026-08-27

Official project-specific local-business intake verified; BorderPlex does not expose a separate public requisition board in this evidence cut.

0normalized
partial
Bloom EnergyBloom Energy Careers · weekly · checked 2026-08-27

Official microgrid-supplier careers route verified; no exact Santa Teresa requisition is normalized in this snapshot.

0normalized
partial
Turner ConstructionCornerstone / Turner Construction · daily · checked 2026-08-28

Deduplicated Louisiana and Indiana state-filter results produced 109 current records; 13 Richland-market and 13 Lebanon-capable roles are normalized. The Coravel announcement verifies Turner at Hicks Field, but no current stable posting names that campus, so no Fort Worth role is assigned.

26normalized
partial
ClaycoClayco Careers · weekly · checked 2026-08-28

Official career and subcontractor routes verified. Clayco is resolved to Meta Montgomery through city permits; no stable Montgomery requisition is normalized, and the separate Indiana campus relationship remains qualified.

0normalized
partial
Hensel PhelpsHensel Phelps Careers · weekly · checked 2026-08-28

Verified Meta Montgomery builder board and trade-partner route. Exact-site job details remain to be normalized from the current board.

0normalized
partial
Plateau ExcavationPlateau Excavation career intake · weekly · checked 2026-08-28

Official intake lists field, civil, utility, safety and project roles. It does not expose dated requisitions or guarantee Alabama deployment.

0normalized
partial
Marathon Electrical ContractorsMarathon Electrical Careers · weekly · checked 2026-08-28

Official company page exposes career listings plus project-manager, journeyman and low-voltage pathways and a registered apprenticeship. Exact Montgomery requisitions remain to be normalized.

0normalized
monitored
RJ MechanicalRJ Mechanical Employment · weekly · checked 2026-08-28

Official employer page currently says applications are not being accepted. Kept on weekly watch to avoid presenting a contractor relationship as a live vacancy.

0normalized
partial
DPR ConstructionDPR Careers · daily · checked 2026-08-28

Applications remain temporarily unavailable during DPR's candidate-system transition; the official notice says the refreshed experience returns August 31. Childress and Meta Mesa participation are verified, but no role can be normalized until the official board reopens.

0normalized
partial
Lancium Childress LLCChildress County agreement and Lancium careers watch · weekly · checked 2026-08-28

Legal project entity is verified in the county agreements. Hiring is expected to route through Lancium or project contractors; no separate entity careers board exists.

0normalized
partial
Rolling Plains EV Stations LLCChildress County agreement and entity watch · weekly · checked 2026-08-28

Parcel and agreement party verified. No official employer site, careers system or direct requisition route was located; monitor county filings and contractor disclosures rather than inferring openings.

0normalized
partial
Hoffman ConstructionHoffman Construction Oracle and division portals · daily · checked 2026-08-28

Official division portals verified and the Childress hiring relationship is direct from Workforce Solutions Panhandle. No stable Childress-filtered requisition was exposed in this cut.

0normalized
partial
RosendinWorkday / Rosendin · daily · checked 2026-08-28

Official board and electrical apprenticeship route verified. No current employer posting reviewed names Childress, so the job-fair relationship is not converted into invented vacancies.

0normalized
partial
Siemens EnergySiemens Energy Careers Marketplace · daily · checked 2026-08-28

The official U.S. marketplace exposed 475 results at review. None was normalized to Childress because the event roster does not identify Siemens Energy's package or a project-assigned requisition.

0normalized
partial
Southland IndustriesSouthland Industries Job Search · daily · checked 2026-08-28

The official board exposed 513 company-wide results. Childress participation is verified, but no stable exact-project result was identified; current openings remain discoverable through the route without false assignment.

0normalized
partial
Target Workforce HousingWorkforce Solutions Panhandle participant watch · weekly · checked 2026-08-28

The public workforce event verifies the participant name but does not resolve its legal entity or employer-controlled job board. Do not merge it with Target Hospitality without primary evidence.

0normalized
monitored
MortensonCoveo / Mortenson Careers · daily · checked 2026-08-28

Twenty-five current Rayville roles, twelve Lebanon roles and six Cedar Rapids regional roles normalized across craft, civil, electrical, power, cabling, safety, quality, scheduling, commissioning and project delivery; one mixed-location record was excluded. Caldwell Valley's operator relationship is now verified, but no current posting names the campus, Lockhart, Uhland, Maxwell or the Farmers Road sites.

43normalized
monitored
Faith Technologies IncorporatedWorkday / FTI · daily · checked 2026-08-27

Six project-specific Lebanon applications and all forty current El Paso-eligible Workday records are normalized; the El Paso set contains seventeen exact-city and twenty-three multi-location postings and remains regional because no individual requisition names Meta.

46normalized
partial
WiwynnWiwynn Careers · weekly · checked 2026-08-27

Official careers page exposes a dedicated El Paso recruitment contact but not stable individual requisition URLs.

0normalized
monitored
Schneider ElectricSchneider Electric Careers · daily · checked 2026-08-27

One current El Paso project-execution role normalized as regional because the customer is not disclosed.

1normalized
partial
Birdsong ConstructionBirdsong Construction application · weekly · checked 2026-08-27

Official local application form verified; Birdsong does not publish discrete requisition pages.

0normalized
queued
CorningCorning Careers · queued · checked pending

North Carolina fiber and manufacturing adapter pending.

0normalized
monitored
WalbridgeiCIMS / Walbridge · daily · checked 2026-08-27

Exact near-Hamlet project-engineer role plus one Charlotte-capable mission-critical estimating role normalized.

2normalized
partial
Phillips Heavy CivilOur Career Pages / Phillips · daily · checked 2026-08-28

Seven current exact-Rockingham civil and equipment roles normalized from 26 North Carolina records; each remains regional because the employer board does not name AWS or the Hamlet campus.

7normalized
monitored
SteelFabSteelFab Careers · daily · checked 2026-08-27

Five current Raleigh / Charlotte engineering, detailing, programming and maintenance records normalized as regional contractor signals.

5normalized
monitored
Slifco ElectricPinpoint / Slifco · daily · checked 2026-08-27

One current onsite North Carolina purchasing role normalized; customer and project remain undisclosed.

1normalized
partial
Gaylor ElectricGaylor Careers · weekly · checked 2026-08-27

Official board verified; Richmond-project requisitions remain to be normalized.

0normalized
partial
icon Mechanicalicon Mechanical Careers · weekly · checked 2026-08-27

Official mechanical-construction board verified; exact Richmond-project matching is pending.

0normalized
partial
MasTecMasTec Careers · weekly · checked 2026-08-27

Official North Carolina-capable board verified; project-level matching is pending.

0normalized
queued
SoftBank GroupSoftBank Careers · queued · checked pending

Site-specific U.S. development matcher pending.

0normalized
monitored
SB EnergyGreenhouse / SB Energy · daily · checked 2026-08-27

Two current exact-location Burlington data-center operations leadership records normalized from the official board.

2normalized
monitored
PSG GroupCareerPlug / PSG Group · daily · checked 2026-08-27

Twelve current Lordstown data-center construction roles normalized as regional because the customer and campus identity are undisclosed.

12normalized
partial
Shambaugh & SonUKG / EMCOR · weekly · checked 2026-08-27

Official company board verified; Fort Wayne openings are not normalized until a stable record identifies relevant project or data-center work.

0normalized
monitored
Hi-Tech Electric CompanyHi-Tech Electric Careers · daily · checked 2026-08-27

Three current local electrical-construction intakes normalized as regional because none names the Google campus.

3normalized
partial
The Hagerman GroupHagerman Careers · weekly · checked 2026-08-27

Official Fort Wayne-capable board verified; no stable posting identifies the Google project.

0normalized
monitored
Brooks Construction CompanyApplicantPro / Brooks Construction · daily · checked 2026-08-27

One current Fort Wayne construction-laborer record normalized as regional because the assigned project is not named.

1normalized
monitored
Fortis ConstructionWorkday / Fortis Construction · daily · checked 2026-08-27

Four current multi-location Workday records that include Cheyenne are normalized across project engineering, construction technology and electrical preconstruction; all remain regional because no client assignment is named.

4normalized
monitored
T5 Data CentersLever / T5 Data Centers · daily · checked 2026-08-28

Two current exact-city Cheyenne operations roles and six current Atlanta platform roles normalized. Every record remains regional because T5 does not name a customer, campus or project assignment.

8normalized
monitored
SwitchClearCompany / Switch · daily · checked 2026-08-28

All five pages were enumerated and every current Las Vegas-capable requisition was normalized. Each remains regional across five separately evidenced Clark County programs because the board publishes no campus address, NAP number or building assignment.

31normalized
queued
Data CanopyData Canopy company and contact watch · queued · checked 2026-08-28

Current operator and 24/7 support contact are verified, but no public requisition board was found. Monitor company news, local hiring and direct operator disclosures.

0normalized
partial
PricewaterhouseCoopersPwC U.S. Careers · weekly · checked 2026-08-28

Official national board verified. No current record is normalized as a Lithia Springs Georgia Data Center vacancy.

0normalized
partial
Grind Capital GroupGrind Capital Group company site · weekly · checked 2026-08-28

Applicant identity and data-infrastructure practice verified. The company exposes no public requisition board or Echo Road hiring route; project disposition and current role remain on record watch.

0normalized
partial
LanciumLancium Careers · weekly · checked 2026-08-27

Official career board and applicant-system route verified; no Abilene- or Childress-specific role normalized in this cut.

0normalized
partial
Lancium Turkey LLCTexas register and Lancium careers watch · weekly · checked 2026-08-28

The registered Turkey 1 owner, occupant and operator is a legal project entity without a separate careers board. Monitor Lancium's official board and exact-Turkey filings; do not imply this LLC independently posts vacancies.

0normalized
partial
Lancium Turkey Clean Campus LLCHall County agreement and entity watch · weekly · checked 2026-08-28

County records verify the reinvestment-zone and abatement applicant name, but no employer-controlled site or direct hiring route exists. Monitor signed agreements, permits and contractor disclosures rather than inventing entity-level openings.

0normalized
partial
GenslerGensler Careers · weekly · checked 2026-08-28

Official designer career route verified. No exact Fort Stockton, Pecos County or Lockhart project-assigned requisition is normalized in this cut.

0normalized
partial
Pacifico GW LLCTCEQ permit and entity watch · weekly · checked 2026-08-28

TCEQ verifies the GW Ranch applicant and proposed power scope but exposes no employer-controlled careers route. Monitor permit milestones, entity disclosures and awarded equipment or construction firms; do not infer Amazon vacancies.

0normalized
partial
CBRECBRE Careers · weekly · checked 2026-08-27

One current exact-city Cedar Rapids data-center maintenance role is normalized as regional; CBRE's Richland workforce relationship is separately verified, while the Cedar Rapids customer and campus remain unresolved.

1normalized
partial
IES CommunicationsIES Communications · weekly · checked 2026-08-27

IES's Richland workforce relationship and data center job board are verified; local requisitions were not exposed as stable detail URLs.

0normalized
monitored
CarrierWorkday / Carrier · daily · checked 2026-08-27

Rayville / Monroe data center HVAC service-management requisition normalized from the official ATS.

1normalized
monitored
Turner & TownsendSmartRecruiters · daily · checked 2026-08-27

Two onsite Richland-market project-controls openings normalized; client identity remains undisclosed.

2normalized
partial
DLB AssociatesDLB Associates Careers · weekly · checked 2026-08-28

Official design-partner board verified. National MEP, BAS, commissioning and QA/QC openings remain unassigned to Atlanta West.

0normalized
partial
CorganiCIMS / Corgan · weekly · checked 2026-08-28

Official architecture and design board verified. Permits establish Corgan's Hicks Field work, but no current requisition names that address; Atlanta and other regional data-center roles also remain unassigned without a project identifier.

0normalized
partial
Bennett & PlessBennett & Pless Careers · weekly · checked 2026-08-28

Official structural-engineering and BIM board verified. Atlanta openings remain regional unless the employer names DC BLOX West.

0normalized
partial
The Outside Line CompanyThe Outside Line Company · weekly · checked 2026-08-28

Verified medium-voltage subcontractor exposes company contact and capability but no public requisition board in this evidence cut.

0normalized
partial
State Electric SupplyUKG / State Electric Supply · weekly · checked 2026-08-28

Official supplier careers route verified. No current opening is tied to the completed DC BLOX West material package.

0normalized
partial
Reinforced Wall SystemsReinforced Wall Systems company site · weekly · checked 2026-08-28

Exact-address retaining-wall relationship is verified through the city permit. The company site exposes capabilities and contact but no public requisition board.

0normalized
monitored
Cleveland Electric CompanyUKG / Cleveland Electric · daily · checked 2026-08-28

One current exact-market Lithia Springs Safety Manager is normalized as regional. A city permit verifies Cleveland at Atlanta West, but the requisition does not name DC BLOX or 1701 North River Road.

1normalized
partial
Beale InfrastructureBeale company and project watch · weekly · checked 2026-08-28

Developer identity and Project Blue role are verified, but Beale exposes no public requisition inventory in this cut. Monitor developer updates, county filings and any later operator disclosure.

0normalized
queued
Humphrey's Peak Properties LLCPima County land and agreement records · queued · checked pending

Project special-purpose entity with no verified employer-controlled careers route. Use records to resolve agreements and ownership; do not invent entity-level vacancies.

0normalized
queued
Humphrey's Peak Power LLCArizona Corporation Commission record watch · queued · checked pending

Power-contract affiliate has no verified public job board. Monitor utility dockets and entity disclosures rather than treating it as a direct hiring company.

0normalized
monitored
Ames ConstructionWorkday / Ames Construction · daily · checked 2026-08-28

Official board showed 101 company records and one Tucson-capable Project Manager requisition. The role remains regional because its four-location listing does not name Project Blue, the county address or a customer.

1normalized
monitored
Tucson Electric PowerWorkday / Tucson Electric Power · daily · checked 2026-08-28

Four current Tucson construction, materials, equipment and T&D records selected from 17 observed roles. TEP's service agreement is verified, but none of the requisitions names Project Blue.

4normalized
partial
NTT Global Data CentersWorkday / NTT Global Data Centers · daily · checked 2026-08-28

Official company board verified. No current exact-Mesa requisition was normalized; the live campus and 24/7 operating model are not vacancy counts.

0normalized
partial
EdgeCore Digital InfrastructureEdgeCore Careers · daily · checked 2026-08-28

Official company route verified. No exact-Mesa, Reno or Florence posting is normalized, and planned campus scale is not converted into current jobs.

0normalized
partial
ComarchComarch Phoenix Careers · daily · checked 2026-08-28

One current local sales role was observed and excluded as outside the data-center workforce scope. An older data-center engineer page is explicitly outdated and is not presented as live.

0normalized
monitored
AppleApple Careers · daily · checked 2026-08-28

Nine current exact-city data-center roles are normalized: four in Mesa and five in Sparks. The observed total combines the reviewed city/state searches; retail and unrelated results remain excluded.

9normalized
monitored
CyrusOneWorkday / CyrusOne · daily · checked 2026-08-28

Five current exact-Chandler requisitions and one Chandler / Mesa / Phoenix night-shift requisition are normalized. Building assignment within the eight-facility Chandler campus is not stated, and multi-location placement is never guaranteed.

6normalized
partial
Haydon CompaniesHaydon Careers · daily · checked 2026-08-28

Official board verified for Edged's named local general contractor. Current roles still require structured enumeration and exact-facility assignment review.

0normalized
partial
Salt River ProjectSalt River Project Careers · daily · checked 2026-08-28

Official utility board verified. The Meta, Edged and Prime PHX01 service relationships do not make general SRP vacancies facility-specific without a worksite, project or infrastructure-package signal.

0normalized
queued
Light Source CommunicationsEdged provider disclosure and company watch · queued · checked 2026-08-28

Edged verifies Light Source Communications as the first network provider. No employer-controlled public careers board was verified; monitor provider disclosures and local fiber hiring without inventing vacancies.

0normalized
partial
Compass DatacentersCompass Datacenters Careers · daily · checked 2026-08-28

Official company route verified. No exact Goodyear or El Mirage role is normalized; marketed development scale is not a vacancy count.

0normalized
partial
DCXDCX company and operations watch · weekly · checked 2026-08-28

Current operating facility and support contacts are verified, but DCX exposes no public requisition inventory in this cut. Monitor the owner site without inventing roles.

0normalized
partial
TBL Mission CriticalTBL Mission Critical Careers · daily · checked 2026-08-28

Six current opportunity or intake pages were observed. Phoenix-area mission-critical roles remain regional because none names DCX-GYR1 or the Goodyear worksite.

0normalized
partial
Cox BusinessCox Careers · daily · checked 2026-08-28

An Arizona Cox Business sales role was observed and excluded as outside the data-center workforce scope. No GYR1-assigned network or field role is normalized.

0normalized
partial
Arizona Public ServiceAPS Careers · daily · checked 2026-08-28

Official board exposed five current company openings in the checked view, none assigned to a tracked West Valley data-center project.

0normalized
partial
GCONGCON Careers · weekly · checked 2026-08-28

Official board and named PHX-13 joint-venture relationship verified. No current exact-PHX-13 requisition is normalized.

0normalized
partial
Lease Crutcher LewisLease Crutcher Lewis Careers · weekly · checked 2026-08-28

Named PHX-13 joint-venture builder and current company route verified. Exact Glendale openings still require structured enumeration and project assignment review.

0normalized
partial
TakanockProject Baccara filing watch · weekly · checked 2026-08-28

Applicant project and filing routes are public, but no employer-controlled careers system or current requisition inventory is exposed. Forecast employment is not converted into openings.

0normalized
queued
Baccara PowerACC and county power-record watch · weekly · checked 2026-08-28

Power entity is verified in public records but has no separate public job board. Monitor construction, air-quality and operating filings before assigning work.

0normalized
queued
Baccara Eagle LandGlendale annexation and county land watch · weekly · checked 2026-08-28

Legal land/applicant entity has no verified public careers route. Use it to track case disposition and ownership, not as an assumed employer.

0normalized
queued
Electrical District No. 7County utility-record watch · weekly · checked 2026-08-28

County record names the district, but no project-specific board or vacancy is verified. Monitor district and county infrastructure records without inventing hiring.

0normalized
partial
Menlo DigitalMenlo Digital portfolio and company watch · weekly · checked 2026-08-28

Owner and MD-PHX1 scope are current, but no public requisition board is exposed. Monitor owner, city permits and later operating-company disclosures without inventing roles.

0normalized
partial
Clune ConstructionClune Careers · weekly · checked 2026-08-28

Official board verified. Phoenix permit relationships are exact, but no current role is assigned to Thistle or AZP3 in this snapshot.

0normalized
partial
RICORRICOR company and permit watch · weekly · checked 2026-08-28

Exact Thistle civil packages are verified through city permits. The company site exposes capabilities and contact, not a stable public job inventory.

0normalized
partial
W. W. ClydeW. W. Clyde Careers · daily · checked 2026-08-28

Official heavy-civil board verified. Current Phoenix project matching across PHX02, AZP3 and Union Hills still requires exact worksite and assignment review.

0normalized
partial
Power ContractingPower Contracting Careers · weekly · checked 2026-08-28

Official route verified for the permit-named substation and civil contractor. No stable Skyway or Union Hills requisition is normalized.

0normalized
partial
Markham ContractingMarkham Contracting Employment · weekly · checked 2026-08-28

Official local contractor intake verified. QTS Phoenix 2 relationships are exact permits, but current position and worksite matching remains unnormalized.

0normalized
partial
Iron Mountain Data CentersIron Mountain Jobs · daily · checked 2026-08-28

Official owner board verified. Exact AZP and AZS-1 records remain to be enumerated; no general Phoenix-metro role is assigned without a Scottsdale, Phoenix or facility worksite.

0normalized
partial
CentersquareCentersquare Careers · daily · checked 2026-08-28

Official operator route verified. No exact PHX1 vacancy is normalized, and the footprint remains linked inside the Iron Mountain physical campus.

0normalized
partial
APi GroupAPi Group Jobs · daily · checked 2026-08-28

Official life-safety and fire-protection board verified. Permit relationships are exact at AZP3; current Phoenix assignments still need requisition-level matching.

0normalized
partial
phoenixNAPphoenixNAP Careers · daily · checked 2026-08-28

Official owner route verified. Current Phoenix operations and PHX II construction records require structured enumeration and exact-location matching.

0normalized
partial
Derek EngineeringDerek Engineering company and permit watch · weekly · checked 2026-08-28

PHX II commercial-shell relationship is verified by the city. No stable employer-controlled job board or exact-project vacancy is exposed.

0normalized
partial
Modern PavingModern Paving company and permit watch · weekly · checked 2026-08-28

PHX II grading relationship is verified by the city. Public employment inventory and assigned work remain to be resolved.

0normalized
partial
Wilson ElectricWilson Electric Careers · weekly · checked 2026-08-28

Official electrical route verified. The city names Wilson on PHX II fiber trenching, but no current requisition is assigned to Elwood.

0normalized
partial
Apache PipelinesApache Pipelines company and permit watch · weekly · checked 2026-08-28

PHX II fireline relationship is verified through city permits. No stable public jobs inventory is exposed.

0normalized
partial
Dickens Quality DemolitionDickens Quality Careers · weekly · checked 2026-08-28

Official local contractor route verified. PHX08 demolition and grading are permit-resolved; current assigned vacancies are not normalized.

0normalized
monitored
1GServers1GServers Careers · daily · checked 2026-08-28

One employer-hosted on-site Phoenix data-center / helpdesk technician opening is normalized. The page lacks a requisition ID and posting date, so recheck daily before applying.

1normalized
partial
Bud Griffin Customer SupportBud Griffin company and permit watch · weekly · checked 2026-08-28

La Salle remodel and fire-alarm relationships are exact city permits. No stable public project-specific job inventory is exposed.

0normalized
partial
ExpedientExpedient Careers · daily · checked 2026-08-28

Official operator route verified. No exact PHX1 Townley vacancy is normalized in this cut.

0normalized
partial
Digital RealtyDigital Realty Careers · daily · checked 2026-08-28

Official owner board verified. Exact PHX10 and Chandler PHX15 matching remains to be enumerated; general Phoenix roles are not campus-assigned without a worksite.

0normalized
partial
Phoenix InternetPhoenix Internet contact and company watch · weekly · checked 2026-08-28

Operating local colocation service is verified, but no public requisition inventory exists. Contact access is not represented as an opening.

0normalized
partial
NexusTekNexusTek Careers · daily · checked 2026-08-28

Official company route verified. Exact Lone Cactus data-center operations roles remain unresolved, and older facility specifications are refresh-tagged.

0normalized
partial
Uniti WholesaleUniti Careers · daily · checked 2026-08-28

Official carrier route verified. No exact Grant Street ILA role is normalized.

0normalized
partial
LumenLumen Careers · daily · checked 2026-08-28

Official carrier board verified. Exact 16th Street and PHX10 role matching remains to be enumerated; metro roles are not automatically site-assigned.

0normalized
partial
H5 Data CentersH5 Data Centers Careers · daily · checked 2026-08-28

Official company careers route verified. No current Chandler requisition is normalized; the operating facility and customer count are not represented as vacancies.

0normalized
partial
Lincoln Property CompanyLincoln Property Company Careers · daily · checked 2026-08-28

Official owner and developer route verified. No requisition is assigned to the Frye Road redevelopment without a Chandler worksite or project signal.

0normalized
partial
HorizonIQHorizonIQ Careers · daily · checked 2026-08-28

Official operator route verified. Current public roles still require exact Chandler or Frye Road matching before normalization.

0normalized
queued
BA Price Owner LLCChandler planning and entity-record watch · weekly · checked 2026-08-28

The council denied PLH24-0046, so this entity is monitored only for appeals, refilings, ownership changes or a new application. No active hiring route is asserted.

0normalized
partial
ColoBarnColoBarn facility and company watch · weekly · checked 2026-08-28

Current Tempe facility and 24/7 support services are verified, but no public employer-controlled requisition inventory was found. Service availability is not counted as hiring.

0normalized
partial
CloudniumCloudnium facility and company watch · weekly · checked 2026-08-28

Current Geneva Drive service page is verified. No public jobs board or exact-site vacancy is exposed, and ownership / Omnis continuity remains unresolved.

0normalized
monitored
Insight GlobalInsight Global Careers · daily · checked 2026-08-28

One current exact-Tempe data-center engineer contract is normalized across the three registered Tempe facilities. Customer and worksite are withheld, so it remains regional and cannot be assigned to a campus.

1normalized
partial
11:11 Systems11:11 Systems Careers · daily · checked 2026-08-28

Official employer page and ATS route verified. No current role naming Scottsdale or Paradise Lane is normalized; remote and company-wide infrastructure roles are not assigned to the facility.

0normalized
monitored
US SignalUS Signal Paylocity · daily · checked 2026-08-28

Ten current employer-controlled opportunities were observed. None names Gilbert, AZ01 or Sunrise Boulevard, so no role is assigned to the facility.

0normalized
queued
Ethington & Hwy 84 LLCCasa Grande parcel and permit watch · weekly · checked 2026-08-28

Legal landowner has no verified employer-controlled careers board. Monitor the cited APNs, recorded waiver, site plans and permits; do not present the ownership entity as a hiring company.

0normalized
queued
Vernon Barnes property ownershipCasa Grande parcel and permit watch · weekly · checked 2026-08-28

Individual ownership record exists for entitlement tracking only. No employer board or vacancy is asserted; monitor exact parcels for a later applicant, operator or contractor.

0normalized
queued
Judd Ventures LLCPinal County SunHill entitlement watch · weekly · checked 2026-08-28

Owner/applicant has no verified public jobs board. Monitor exact APNs and later cases rather than converting plan approval into hiring.

0normalized
partial
Rose Law GroupRose Law Group careers and case watch · weekly · checked 2026-08-28

Official company route is monitored for legal and planning roles. No requisition is assigned to SunHill without a project or Pinal worksite signal.

0normalized
partial
Iplan ConsultingIplan company and Pinal case watch · weekly · checked 2026-08-28

Planning-agent relationship is verified, but no stable public requisition inventory exists. Do not infer continuing work beyond the filed case.

0normalized
queued
Arizona RR Ranches LLCPinal County Frontier West record watch · weekly · checked 2026-08-28

Landowner is a legal project entity without a verified careers route. Monitor deeds and later planning / permit records; no direct vacancy is public.

0normalized
queued
W HoldingsPinal County Frontier West record watch · weekly · checked 2026-08-28

Applicant identity is verified in the land-use action, but no employer-controlled job board or named field package is resolved.

0normalized
queued
Selma & Midway LLCPinal County Project Midway record watch · weekly · checked 2026-08-28

Owner/applicant has no verified public careers route. Monitor parcel 500-12-001B and later cases before exposing project work.

0normalized
partial
Withey Morris BaughWithey Morris Baugh careers and case watch · weekly · checked 2026-08-28

Official company route is monitored. No current role is assigned to Project Midway without a Pinal worksite or project reference.

0normalized
queued
Vermaland LLCLa Osa denial and refiling watch · weekly · checked 2026-08-28

The August zoning denial controls. Monitor appeals, new cases and ownership changes; do not normalize forecast employment or company contact as an opening.

0normalized
04Research coveragePress, permits, dockets, parcels + local filingsOpen
Current660
Due soon99
Overdue11

Coverage spans planned through operating sites. The register shows what has been reviewed—and what still has not.

01

State data-center + tax registers

Weekly
active

Qualified facilities, effective dates and separate legal owner, occupant and operator identities—including projects with no press release.

A tax qualification proves a state registration, not an exact address, construction start, capacity, delivery or live hiring; every facility needs downstream corroboration.
02

Owner + operator disclosures

Weekly
active

Announcements, construction milestones, capacity, investment and local commitments.

Usually favors large, publicized projects and may omit contractor detail.
03

Official job boards + ATS feeds

Daily
active

Current openings, exact locations, role families and employer demand signals.

A local opening is not assigned to a project unless the posting or another primary source makes that relationship defensible.
04

County planning + zoning records

Every 14 days
expanding

Early site plans, rezoning requests, meeting packets and projects outside the press cycle.

Naming is often hidden behind parcel owners, applicants or project codenames.
05

Building permits + inspection logs

Monthly
expanding

Construction starts, scope, valuation, contractor names and phase progress.

Systems differ by jurisdiction and many records are PDFs or local search portals.
06

Tax abatements + development agreements

Monthly
expanding

Capital commitments, job promises, timelines, public obligations and legal project entities.

Approval is evidence of intent, not proof that construction or hiring occurred.
07

Air, water + environmental permits

Monthly
active

Generator counts, power equipment, construction milestones and site identity.

Technical permits confirm authorized scope; they do not guarantee full build-out.
08

Utility + interconnection dockets

Monthly
expanding

Load requests, substations, transmission work, service dates and power constraints.

Customer names can be redacted and requested load can exceed eventual deployment.
09

Assessor, parcel + entity records

Quarterly
queued

Land assembly, ownership changes, shell companies and smaller undeclared sites.

Entity resolution requires corroboration; ownership alone is not a data-center claim.
10

Court dockets + administrative appeals

Every 14 days
expanding

Permit disputes, moratoria challenges, condemnation actions and milestones that can stop or restart a project.

A complaint states one party's allegations; docket mirrors can lag and outcomes must be verified from orders or official records.
11

Public workforce + training systems

Monthly
active

Local hiring routes, apprenticeships, credentials, cohorts and workforce commitments.

Program relevance is supporting evidence unless an employer or project partnership is explicit.
Jurisdiction ledger6 reviewed · 23 partial · 0 queued · 4 verified zero

A zero is published only after a documented jurisdiction review. Queued markets remain unknown.

city · AZreviewed

Buckeye

2projects resolved

The citywide status page, Tech Corridor planning case and current Tract ownership record were reconciled. Grand View was screened out because the city says data centers are not its primary focus; the SR-85 / Patterson site is preserved as an unresolved lead.

Next checkRetrieve the executed Tech Corridor agreement, parcel and permit history, utility-service record and any first operator or building application.
Reviewed 2026-08-28Next 2026-09-04
city · AZreviewed

Avondale

3projects resolved

Municipal planning, budget and permit-index records plus current owner pages resolve three distinct campuses: STACK PHX01, Prime PHX01 and QTS Hermosa Ranch. Generic city references to two groundbreakings are not assigned to a campus without a building-level record.

Next checkComplete the multi-month parcel-level permit and inspection sweep; resolve STACK commissioned buildings, QTS campus code and MW, and Prime building-by-building delivery.
Reviewed 2026-08-28Next 2026-09-04
city · AZreviewed

Glendale

4projects resolved

City permits and owner records resolve three Glendale campuses across operating expansion, active fit-out and civil-permit stages. Project Baccara remains in Waddell but is included because Glendale annexation and rezoning cases are pending; postal Waddell labels are not allowed to erase municipal Glendale sites.

Next checkRetrieve adopted Project Eagle annexation and rezoning actions; complete building-level Phoenix 3 and Aligned permit/inspection crosswalks; verify Vantage vertical mobilization; resolve QTS contractor-license identities and current trade packages.
Reviewed 2026-08-28Next 2026-09-04
city · AZpartial

Phoenix

17projects resolved

The live city permit layer, PUD register and current operator portfolios resolve 17 physical or entitled records: campus-scale builds, legacy colocation, small edge facilities and one inactive entitlement. Tenant footprints inside Iron Mountain and Aligned are linked as companies rather than duplicated as land-and-building projects.

Next checkComplete the city Certificate of Occupancy and issued-permit export across every address; retrieve Maricopa deeds and assessor parcels for AWS Laveen and PHX08; resolve legacy PHX1 at 3110 N Central, 5C's undisclosed Phoenix location and enterprise facilities such as CGI, Honeywell, UPS, Phoenix Children's, Dignity and Maricopa storage without confusing server rooms with workforce-relevant data-center campuses.
Reviewed 2026-08-28Next 2026-09-04
city · AZpartial

Chandler

8projects resolved

Eight physical campus or proposal records reconciled. CyrusOne PHX1–PHX8 is one campus record, Data Canopy is a service relationship inside PHX8 rather than a duplicate site, and the denied PRIC proposal remains visible as inactive history.

Next checkComplete the Citizen Access permit and certificate-of-occupancy export; resolve current deed and operating use for the former 1890 / 1900 S Price complex; enumerate building-level CyrusOne PHX1–PHX8 facts, exact PHX-04 / PHX-06 packages and Frye redevelopment permits; screen smaller enterprise and edge facilities without misclassifying ancillary server rooms at semiconductor, aerospace or office sites.
Reviewed 2026-08-28Next 2026-09-04
city · AZpartial

Tempe

3projects resolved

Three physical facilities are preserved: current owner-confirmed EdgeConneX PHX01 and ColoBarn, plus the Geneva Drive data-center building whose service page is current but ownership and active load remain unresolved. Recruiter demand is market-level and is not assigned to a campus.

Next checkComplete Tempe Citizen Access, issued-permit, inspection, certificate-of-occupancy, assessor and deed sweeps across all three addresses; resolve the 2025 Geneva sale disposition and Omnis / Cloudnium relationship; search historical use permits under the current Section 3-429 framework; screen ASU, municipal, semiconductor and enterprise facilities without misclassifying internal server rooms as workforce-relevant commercial data centers.
Reviewed 2026-08-28Next 2026-09-04
city · AZpartial

Scottsdale

2projects resolved

Two current commercial facilities are resolved: owner-confirmed Iron Mountain AZS-1 and 11:11 Systems' Scottsdale colocation / recovery facility. Historical tenant names inside AZS-1 and the former SunGard identity at Paradise Lane are not duplicated as separate land-and-building projects.

Next checkComplete address-by-address SPUR and legacy permit, inspection and certificate-of-occupancy exports; reconcile deeds, leases and current power records at Princess Drive and Paradise Lane; resolve the city primary data center and indexed Caremark, GoDaddy and smaller enterprise / edge leads only where a physical facility and workforce relevance can be distinguished from an internal server room; enumerate exact Scottsdale openings on owner ATS feeds.
Reviewed 2026-08-28Next 2026-09-04
city · AZpartial

Gilbert

1projects resolved

One current commercial facility is resolved. This matches town planning staff's February 2026 statement that they knew of one data center and had received no new data-center applications; OneNeck is retained as acquisition history rather than a duplicate site.

Next checkComplete One Stop Shop permit, inspection and certificate history for 1655 W Sunrise; reconcile parcel, deed, lease, business-license and current utility records; track the pending Land Development Code amendment and all post-February applications; screen GoDaddy, StrongMind, Silent-Aire and other indexed leads without confusing offices, hosting customers, modular-data-center manufacturing or internal server rooms with a separate physical data center.
Reviewed 2026-08-28Next 2026-09-04
city · AZreviewed

Queen Creek

0verified zero

Zero physical data-center projects were resolved inside Queen Creek in this review. Ordinance 801-22 prohibits data centers as a primary use; a minimal ancillary facility directly supporting another business may be considered by conditional use. Pacific Proving is a Mesa project and is deliberately excluded from this town inventory.

Next checkRecheck zoning-text amendments, current cases, Development Nexus, council and commission packets, annexations, county-island filings and ancillary-use permits; screen enterprise facilities without turning internal server rooms into commercial data-center projects.
Reviewed 2026-08-28Next 2026-09-11
city · AZpartial

Casa Grande

1projects resolved

One pre-application campus envelope is resolved across two adjoining ownerships near Bianco Road. The August waiver is preserved as a property entitlement with conditions, not represented as an approved site plan or construction project.

Next checkComplete the citywide planning, CUP, site-plan, building-permit, inspection and certificate sweep; retrieve recorded waivers and current deeds; resolve applicant, end user, power entity, air-quality path, development schedule and every later contractor assignment.
Reviewed 2026-08-28Next 2026-09-04
community · AZpartial

San Tan Valley

1projects resolved

SunHill is retained as a county-controlled project in the unincorporated Arizona Farms / San Tan Valley geography. Parcel ownership and the 2024 deed chain are resolved, while the approved comprehensive-plan amendment still does not establish rezoning, permits or a construction start.

Next checkRequest or account-search later county zoning, PAD, site-plan, building, utility, dust and industrial-air records for APNs 210-44-002 and 210-44-004; reconcile Florence planning boundaries and avoid assigning the project to an incorporated city without a controlling jurisdiction record.
Reviewed 2026-08-28Next 2026-09-11
city · AZpartial

Florence

3projects resolved

Three distinct Dobson Farms development areas are preserved rather than collapsed into one campus. All three received 2025 general-plan amendments; only the 780-acre Florence Tech Park also has a resolved PUD amendment, while the east EdgeCore plan remains explicitly conceptual and the west parcel retains a mixed data-center / industrial envelope.

Next checkComplete town administrative site-plan, subdivision, building-permit, inspection and certificate sweeps; retrieve any post-entitlement applications, deeds and utility commitments; reconcile SRP service, air-quality paths, final campus identities, financing, operators, builders and contractor assignments for each parcel separately.
Reviewed 2026-08-28Next 2026-09-11
city · AZpartial

Eloy

1projects resolved

Southwest Crossing is resolved to municipal case RZPAD2024-006, Ryan Companies and the 122-acre Estrella / Houser site. The January 2025 P&Z recommendation and February council agenda are verified, but a signed ordinance or official action result was not resolved, so entitlement and construction forecasts remain gated.

Next checkRetrieve signed Ordinance 25-985, Resolution 25-1611 and official minutes or clerk results; sweep current planning, site-plan, building, inspection, utility and air-quality records; reconcile whether the campus remains active, changed scope, transferred, obtained power or received any contractor award.
Reviewed 2026-08-28Next 2026-09-04
city · AZpartial

Coolidge

0verified zero

No physical data-center project was resolved in the complete published 2026 Planning and Zoning index through the September cancellation notice. The city code allows data centers conditionally in Agricultural zoning and as permitted uses in Commerce Park and Garden Industrial districts, so this is a scoped zero-project result rather than a claim that no administrative or industrial filing exists.

Next checkRequest the municipal site-plan, building-permit, inspection and certificate registers; search iWorQ by address, parcel, owner and contractor; screen IPAZ parcels and utility / substation requests; monitor conditional-use, industrial-site-plan, council, assessor and recorder channels.
Reviewed 2026-08-28Next 2026-09-11
city · AZpartial

Apache Junction

0verified zero

No physical data-center project was resolved among the 38 records in the city's current development-project layer. A May 2025 council discussion referenced only a possible location, without a site or application, and the zoning code treats data centers as conditional uses in specified districts.

Next checkSearch MyGovernmentOnline planning and building records, permits, inspections and certificates by parcel / owner / contractor; request pre-application and economic-development records; monitor Legistar, zoning cases, utility requests, GIS updates and Pinal / Maricopa county boundary cases.
Reviewed 2026-08-28Next 2026-09-11
city · AZpartial

Maricopa

0verified zero

No physical data-center project was resolved among 81 named entries in the city's current development StoryMap. Frontier West is deliberately excluded from the city inventory because the controlling county packet places it in unincorporated Pinal County and records the City of Maricopa's objections within its extended planning area.

Next checkComplete VIP / permit, inspection, certificate, public-notice, meeting-packet, annexation, assessor, recorder, utility and economic-development-record sweeps; monitor the southern annexation area and county islands; do not move Frontier West into the city without a controlling annexation or jurisdiction record.
Reviewed 2026-08-28Next 2026-09-11
county · AZpartial

Pinal County

4projects resolved

Four county-controlled data-center records are resolved across plan-amendment, pre-build and denied states. La Osa remains inactive after the August 26 zoning denial. SunHill, Frontier West and Project Midway now have parcel and recorder crosswalks, but later delivery approvals remain incomplete; Frontier West's 2026 survey is land activity, not a field start. Project Bella is adjacent permitted power infrastructure, not a data center or verified Midway supply contract. The current industrial-air notice register has no matching project entity, a result scoped only to that live notice set.

Next checkFinish the hearing index and obtain account-authorized or public-record results from Citizen Access; retrieve site-plan, building, inspection, dust, Class II / III air, utility-service and municipal-boundary records. Resolve 2026 amendment cases, county islands, administrative approvals and municipal-edge parcels without duplicating city projects or converting recorder activity and utility adjacency into construction or supply commitments.
Reviewed 2026-08-28Next 2026-09-04
city · NVpartial

North Las Vegas

3projects resolved

Three distinct facilities are resolved: Novva, Flexential North and Verizon Belmont. Belmont is explicitly labeled a mobile switching center so telecom resilience infrastructure is visible without inflating the commercial data-center inventory.

Next checkComplete the citywide planning, permit, inspection, certificate, recorder, utility and business-license sweep; retrieve Belmont's final occupancy and air closeout; screen Aligned, carrier, edge and enterprise facilities without duplicating suites or internal server rooms.
Reviewed 2026-08-28Next 2026-09-04
city · NVpartial

Henderson

1projects resolved

Google's operating Warm Springs Road campus is cross-checked through owner, city, assessor and emergency-planning records. The 520/560 street-address difference is preserved as one campus discrepancy, and Google's $6B figure remains a combined Nevada total.

Next checkComplete city and county planning, building, inspection, certificate, deed, utility and environmental sweeps; resolve building count, current MW and expansions; screen smaller colocation, enterprise and edge facilities without converting server rooms into separate campuses.
Reviewed 2026-08-28Next 2026-09-04
city · NVpartial

Boulder City

1projects resolved

One federal-parcel project is preserved as approved but contested. The separate city-parcel application was withdrawn and is not counted as another facility.

Next checkTrack the administrative appeal and final right-of-way instrument; resolve parcel geometry, utility and emergency-service agreements, financing, permits, contractor, construction timing and any project-specific workforce route.
Reviewed 2026-08-28Next 2026-09-04
city · NVpartial

City of Las Vegas

2projects resolved

Two operating downtown colocation records are resolved inside the city: Flexential Downtown and isp.net Data Center 2. The mailing label Las Vegas is not used to pull unincorporated Sunrise Manor facilities into the city count.

Next checkComplete city permit, fire, inspection, certificate, business-license and assessor crosswalks for both addresses; resolve current DC2 specifications and screen enterprise, carrier and government facilities without classifying ordinary server rooms as commercial data centers.
Reviewed 2026-08-28Next 2026-09-04
community · NVpartial

Las Vegas market

14projects resolved

Fourteen physical records now separate operating campuses, active earthwork, approved proposals, smaller edge facilities and one telecom switching center. Restoring isp.net's two-facility local portfolio makes a regional operator visible alongside hyperscale and national colocation owners. Clark County records resolve four Switch development envelopes beyond NAP 7–12 without treating permit equipment as IT capacity or regional jobs as exact-site assignments.

Next checkComplete municipal versus unincorporated permit, inspection, certificate, assessor, recorder, utility and environmental sweeps; verify current specifications, fire and occupancy records for both isp.net sites; resolve NAP 13 continuity and building-level delivery across every Switch envelope; screen enterprise and additional carrier sites without duplicating tenants or ancillary server rooms.
Reviewed 2026-08-28Next 2026-09-04
county · NVpartial

Storey County

14projects resolved

Fourteen distinct Storey County physical campus or land-development records now preserve operating, expansion, late-structure, horizontal-development, permitted internal-infrastructure and entitlement-only states. Peru Ridge is attached to Fleet as a probable underlying 517-acre / 230 MW land envelope rather than counted twice. Redwood remains an internal industrial facility, and every SUP, easement, zoning status or utility schedule stays distinct from a building start.

Next checkComplete building, fire, grading, inspection, certificate, parcel, deed, water, sewer, utility and air-quality crosswalks; retrieve permit numbers and final actions for active campuses and Tract land programs; resolve Fleet / Peru Ridge legal continuity, Vantage building one, South Valley and Virginia Highlands infrastructure, Microsoft or tenant-only footprints, DataBank and smaller private facilities before any county-completeness claim.
Reviewed 2026-08-28Next 2026-09-04
county · NVpartial

Lyon County / Silver Springs

1projects resolved

One owner-controlled planning-stage technology park is resolved near Silver Springs. Its development-agreement reference and 700 MW utility study are preserved as planning evidence, not committed power or construction.

Next checkRetrieve the Lyon County development agreement, exact parcels, zoning and administrative approvals; complete assessor, recorder, building, grading, inspection, certificate, utility, environmental and meeting-record sweeps; identify the adjacent hyperscale property and avoid duplicating it as Sapphire without parcel evidence.
Reviewed 2026-08-28Next 2026-09-04
community · NVpartial

Reno–Sparks market

3projects resolved

Apple's operating campus and Colovore's two separately marketed facilities are resolved with current exact-market hiring signals.

Next checkResolve jurisdiction, parcel and street address for both Colovore sites; retrieve municipal and county permits, inspections and certificates; enumerate Switch, Google, EdgeCore / PowerHouse, Microsoft, DataBank and other Reno–Sparks facilities before any market-completeness claim.
Reviewed 2026-08-28Next 2026-09-04
05Source register770 cited records · refresh status attachedOpen
001
Using Occupational Employment and Wage Statistics data during salary negotiationsU.S. Bureau of Labor Statistics · published / observed 2026-08-06
Federal labor statisticspublic recordrecordcurrent

Defines national wage percentiles and explains why newer workers may sit near lower percentiles while experienced or more educated workers may sit near upper percentiles. Gridwork uses that relationship only as an experience proxy, not a guaranteed pay progression.

Reviewed 2026-08-29 · next 2027-08-29 · 365d cadence · high accuracyAuthoritative national cross-industry wage method; not a local offer, union scale, overtime forecast or direct measure of years of experience.
002
National employment and wage data by occupation, May 2025U.S. Bureau of Labor Statistics · published / observed 2026-05-15
Federal labor statisticspublic recordrecordcurrent

Latest national OEWS release used to anchor median wages and broad early-career through senior market bands for Gridwork roles.

Reviewed 2026-08-29 · next 2027-08-29 · 365d cadence · high accuracyAuthoritative national occupation estimates. Role crosswalks are qualified where data-center titles do not map one-to-one to a federal occupation.
003
Electricians — Occupational Outlook HandbookU.S. Bureau of Labor Statistics · published / observed 2026-08-22
Federal occupation handbookpublic recordrecordcurrent

Documents the typical high-school entry floor, 4–5 year apprenticeship, roughly 2,000 paid on-the-job hours per year and variable state licensing.

Reviewed 2026-08-29 · next 2027-08-29 · 365d cadence · high accuracyAuthoritative national pathway baseline; local licensing and apprenticeship admission rules control.
004
Construction trades pathways — operators, ironworkers and pipefittersU.S. Bureau of Labor Statistics · published / observed 2026-08-22
Federal occupation handbookpublic recordrecordcurrent

Federal occupation profiles support apprenticeship length, education floor, work conditions and wage anchors for civil, structural and pipe-trade routes.

Reviewed 2026-08-29 · next 2027-08-29 · 365d cadence · high accuracyHigh for national occupation requirements; individual programs, licenses and local wages vary.
005
HVAC mechanics and installers — Occupational Outlook HandbookU.S. Bureau of Labor Statistics · published / observed 2026-08-27
Federal occupation handbookpublic recordrecordcurrent

Reports a May 2025 median of $61,010, a national lower tenth below $40,050 and upper tenth above $95,210, plus typical postsecondary and on-the-job preparation.

Reviewed 2026-08-29 · next 2027-08-29 · 365d cadence · high accuracyAuthoritative national occupation distribution; mission-critical chiller roles may pay differently by market, shift and employer.
006
Computer support specialists — Occupational Outlook HandbookU.S. Bureau of Labor Statistics · published / observed 2026-08-22
Federal occupation handbookpublic recordrecordcurrent

National pathway and wage evidence for network support and hardware-support routes, including education alternatives and on-the-job learning.

Reviewed 2026-08-29 · next 2027-08-29 · 365d cadence · high accuracyAuthoritative occupation baseline; data-center technician titles span several SOC occupations and employer levels.
007
Career seekers — Registered ApprenticeshipU.S. Department of Labor · published / observed 2026-08-27
Registered apprenticeship systemeducation workforcerecordcurrent

Defines registered apprenticeship as paid work with mentorship, progressive wage increases, classroom instruction and a portable credential; includes the federal opportunity finder.

Reviewed 2026-08-29 · next 2026-09-28 · 30d cadence · high accuracyAuthoritative program model and search route. Openings, entry tests, schedules and employer assignments vary by sponsor.
008
Section 608 technician certification requirementsU.S. Environmental Protection Agency · published / observed 2026-07-15
Federal credential requirementpublic recordrecordcurrent

Explains who must be certified, the four credential types, approved-test requirement and non-expiring credential.

Reviewed 2026-08-29 · next 2027-02-25 · 180d cadence · high accuracyAuthoritative federal requirement. Exam preparation and testing prices are set by approved organizations, not EPA.
009
OSHA Outreach Training ProgramOccupational Safety and Health Administration · published / observed 2026-08-27
Federal safety trainingeducation workforcerecordcurrent

Defines 10-hour worker and 30-hour supervisor-oriented outreach classes and states that cards are voluntary awareness training, not a certification or substitute for employer-required hazard training.

Reviewed 2026-08-29 · next 2026-11-27 · 90d cadence · high accuracyAuthoritative program scope. Course prices vary by OSHA-authorized provider and some employers or jurisdictions impose additional requirements.
010
Certified Fiber Optic Technician pathwayThe Fiber Optic Association · published / observed 2026-08-28
Industry credential providereducation workforcedirectcurrent

Official certification route and knowledge scope for fiber installation, testing, safety and troubleshooting.

Reviewed 2026-08-29 · next 2026-11-27 · 90d cadence · high accuracyHigh for FOA credential requirements; school tuition, lab time and employer preference vary.
011
CompTIA A+ and Network+ certificationsCompTIA · published / observed 2026-08-28
Industry credential providereducation workforcedirectcurrent

Official vendor-neutral routes covering hardware support, troubleshooting and network fundamentals used in entry IT and network journeys.

Reviewed 2026-08-29 · next 2026-09-28 · 30d cadence · qualified accuracyHigh for certification scope. Exam versions, recommended experience, bundles and voucher prices change; Gridwork shows rounded cash-planning estimates.
012
Construction Health and Safety TechnicianBoard of Certified Safety Professionals · published / observed 2026-08-28
Industry credential providereducation workforcedirectcurrent

Official CHST eligibility and exam route; the current single-exam price is $300 before preparation materials or renewal costs.

Reviewed 2026-08-29 · next 2026-09-28 · 30d cadence · high accuracyHigh for current BCSP requirements and exam price; eligibility requires relevant construction safety experience and is not an entry-level shortcut.
013
Local training and license findersCareerOneStop · U.S. Department of Labor · published / observed 2026-08-29
Public workforce systemeducation workforcerecordcurrent

Federal route for comparing nearby programs, American Job Centers and occupation-specific state license requirements.

Reviewed 2026-08-29 · next 2026-09-28 · 30d cadence · high accuracyHigh for the federal search route; school tuition, completion, funding and licensing requirements must be confirmed with the provider or state board.
014
Schneider Electric University course catalogSchneider Electric · published / observed 2026-08-29
Industry training providereducation workforcedirectcurrent

First-party self-paced learning route for data-center power, cooling, efficiency and infrastructure fundamentals; completion is not a job guarantee or substitute for field qualification.

Reviewed 2026-08-29 · next 2026-09-28 · 30d cadence · qualified accuracyHigh for the provider's available course catalog; individual modules, access terms and completion recognition can change.
015
Teachers and Local Businesses Win as Meta Expands Louisiana Data CenterMeta · published / observed 2026-07-20
Owner / contractor disclosurefirst partydirectdue soon

5 GW expansion, more than 1,000 operational roles and Louisiana contract activity.

Reviewed 2026-07-20 · next 2026-09-03 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
016
One Year In: Meta's Richland Parish Data CenterMeta · published / observed 2025-12-19
Owner / contractor disclosurefirst partydirectdue soon

Names Turner, DPR and Mortenson; reports 3,700 construction workers and a 5,000-worker peak forecast.

Reviewed 2026-07-20 · next 2026-09-03 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
017
Richland Parish Data CenterMortenson · published / observed 2026-08-28
Owner / contractor disclosurefirst partydirectdue soon

Official project page confirms Mortenson's Richland Parish scope across civil work, utilities, power distribution, water infrastructure and outside-plant fiber; it reports 7,500+ craft workers at peak construction and 1,000+ long-term roles expected.

Reviewed 2026-07-20 · next 2026-09-03 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
018
Mortenson — Rayville openingsMortenson · published / observed 2026-08-28
Official ATS / job boardofficial job boarddirectdue soon

Mortenson's official careers index returned 26 Rayville-matched records; 25 current Rayville roles are normalized after excluding one record whose title names Lebanon.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
019
Microsoft completes construction on first Mount Pleasant datacenter facilityMicrosoft · published / observed 2026-06-23
Owner / contractor disclosurefirst partydirectoverdue

First facility operating, second under construction for 2028; nearly 10,000 construction contributors and 550 current on-site roles disclosed.

Reviewed 2026-06-23 · next 2026-08-07 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
020
Mount Pleasant datacenter project updateMicrosoft Local · published / observed 2026-07-13
Owner / contractor disclosurefirst partydirectoverdue

Owner-maintained project log identifies Walsh and Kiewit as general contractors, documents active Phase 2 work and publishes Walsh's subcontractor contact.

Reviewed 2026-06-23 · next 2026-08-07 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
021
Walsh Group Mount Pleasant data center openingsThe Walsh Group · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Three official records with unexpired application windows observed for Mount Pleasant data-center quality and construction-technology work.

Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
022
Amazon plans to invest $20B in Pennsylvania cloud infrastructureAmazon · published / observed 2025-06-09
Owner / contractor disclosurefirst partydirectcurrent

Identifies Salem and Falls Townships; 1,250 high-skilled jobs across the planned Pennsylvania investment plus construction and supply-chain work.

Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
023
Amazon Innovation Campuses in PennsylvaniaAmazon / Pennsylvania Chamber · published / observed 2026-08-27
Owner / contractor disclosurefirst partydirectcurrent

Current owner project register covering active Falls and Salem construction plus the Kline Township preconstruction campus.

Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
024
Salem Township Innovation CampusAmazon / Pennsylvania Chamber · published / observed 2026-08-27
Owner / contractor disclosurefirst partydirectcurrent

Current owner page confirms an operating campus, active construction since October 2025, a 20-building plan and approximately 1,000 permanent jobs at full buildout.

Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
025
Falls Township Innovation CampusAmazon / Pennsylvania Chamber · published / observed 2026-08-27
Owner / contractor disclosurefirst partydirectcurrent

Current owner page confirms active construction, NorthPoint Development as partner, up to 10 buildings and a one-million-square-foot retrofit.

Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
026
Kline Township Innovation CampusAmazon / Pennsylvania Chamber · published / observed 2026-08-27
Owner / contractor disclosurefirst partydirectcurrent

Current owner page identifies a 380-acre Schuylkill County campus in preconstruction and public review.

Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
027
Electro-Mechanical TechnologySchuylkill Technology Center Adult Education · published / observed 2026-08-28
Workforce / training systemeducation workforcesupportingcurrent

Local 12-month, 610-hour evening adult route in Frackville; the center also publishes HVAC, MSHA electrical and employer-arranged electro-mechanical training calendars.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
028
PA CareerLink Schuylkill County at PottsvillePA CareerLink Schuylkill County · published / observed 2026-08-28
Workforce / training systemeducation workforcesupportingcurrent

Official local workforce route for job matching, training navigation, apprenticeships, recruitment, applicant screening and on-the-job training support.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
029
Falls Township data center permitting and developmentCommonwealth of Pennsylvania · published / observed 2026-07-13
Local planning / public recordpublic recordrecordcurrent

State source independently identifies NorthPoint Development as the Falls campus developer and documents the active air-permit process.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.
030
Workforce DevelopmentBucks County Community College · published / observed 2026-08-28
Workforce / training systemeducation workforcesupportingcurrent

Current Lower Bucks workforce register lists electrical, HVAC, building-trades and industrial-maintenance training, including free pre-apprenticeship options and published cohort information sessions.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
031
PA CareerLink Bucks CountyCounty of Bucks · published / observed 2026-08-28
Workforce / training systemeducation workforcesupportingcurrent

Official county workforce route for job placement, candidate screening, recruitment events, on-the-job training and incumbent-worker training.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
032
Amazon Jobs — Berwick and Fairless Hills data center openingsAmazon Jobs · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Official live Pennsylvania records observed across construction, safety, facilities, network delivery and data center operations.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
033
Talen Energy expands nuclear energy relationship with AmazonTalen Energy · published / observed 2025-06-11
Owner / contractor disclosurefirst partydirectcurrent

Confirms Talen's power-supply relationship with the Amazon campus adjacent to Susquehanna and capacity for other Pennsylvania sites.

Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
034
NorthPoint Development career opportunitiesNorthPoint Development · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Official developer job board; no Pennsylvania project-specific requisition is normalized in this evidence cut.

Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
035
Amazon breaks ground on $10 billion Richmond County data center projectAmazon · published / observed 2025-10-30
Local planning / public recordpublic recordrecordoverdue

Groundbreaking evidence; 500 high-skilled jobs and thousands of construction and supply-chain roles cited.

Reviewed 2025-10-30 · next 2025-11-29 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.
036
Stargate advances with 4.5 GW partnership with OracleOpenAI · published / observed 2025-07-22
Owner / contractor disclosurefirst partydirectcurrent

Abilene partially online and expanding; identifies construction, electrical, equipment-operator and technician demand.

Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
037
Commissioning Project Lead, Data Center DeliveryOpenAI · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Current role supports one of two self-build campuses, in the Savannah or Abilene area, and is therefore retained as an Abilene regional match rather than a guaranteed site assignment.

Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
038
OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sitesOpenAI · published / observed 2025-09-23
Owner / contractor disclosurefirst partydirectcurrent

Names Shackelford County, Doña Ana County, Lordstown and Milam County development sites.

Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
039
Google announces new $7 billion investment in IowaGoogle · published / observed 2025-05-30
Owner / contractor disclosurefirst partydirectcurrent

New Cedar Rapids data center, Council Bluffs expansion and an electrical workforce partnership.

Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
040
Google Careers — Cedar Rapids data center searchGoogle · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Official filtered payload returned nine records; seven project-relevant exact-city, Iowa or multi-location data-center roles are normalized, while two search spillovers are excluded.

Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
041
Data Center Development in Cedar RapidsCity of Cedar Rapids · published / observed 2026-08-27
Local planning / public recordpublic recordrecordcurrent

City-maintained register distinguishes the Google and QTS campuses from the separately permitted 1515 33rd Avenue SW data center and links public project records.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.
042
QTS Cedar Rapids data center campusQTS Data Centers · published / observed 2025-08-08
Owner / contractor disclosurefirst partydirectcurrent

Owner factsheet documents a $10 billion, seven-building, 612-acre campus expected to support more than 2,000 construction and permanent jobs.

Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
043
QTS Data Center CampusThe Weitz Company · published / observed 2026-08-27
Owner / contractor disclosurefirst partydirectcurrent

Builder portfolio confirms the Layton–Weitz joint venture is constructing a QTS Cedar Rapids campus building and identifies the client, scale and completion target.

Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
044
Data Center Campus — Cedar RapidsLayton Construction · published / observed 2026-08-27
Owner / contractor disclosurefirst partydirectcurrent

Layton's official portfolio confirms its three-building Cedar Rapids delivery scope for the large closed-loop-cooled campus.

Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
045
Oppidan Cedar Rapids 10 MW data center permit recordsCity of Cedar Rapids / Iowa EASY Air · published / observed 2026-08-27
Environmental permit / docketpublic recordrecordcurrent

Issued city permit identifies CLOP Cedar Rapids IA LLC, 98,695 square feet and 10 MW; Iowa's public air-permit portal identifies the facility as Oppidan Cedar Rapids.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.
046
Industrial Maintenance TechnologyKirkwood Community College · published / observed 2026-08-28
Workforce / training systemeducation workforcesupportingcurrent

Current Cedar Rapids pathway with industrial-maintenance and automation tracks; related Kirkwood offerings cover HVAC, electrical systems, controls and employer-linked electro-mechanical apprenticeships.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
047
IowaWORKS — Cedar Rapids data center workforce routeIowa Workforce Development / IowaWORKS · published / observed 2026-08-27
Workforce / training systemeducation workforcesupportingcurrent

Official state workforce system where a current Cedar Rapids CBRE data-center maintenance record was observed; the customer and campus assignment are not disclosed.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
048
City, Alliant Energy and QTS collaborate on Cedar Rapids campusAlliant Energy · published / observed 2025-02-13
Owner / contractor disclosurefirst partydirectcurrent

Utility source confirms Alliant's QTS campus relationship and documents construction, trade and initial operating-job commitments.

Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
049
Weitz Cedar Rapids data center openingsThe Weitz Company · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Official location board observed with current Cedar Rapids data center project-management, field-operations and superintendent openings.

Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
050
Mortenson Cedar Rapids data center openingsMortenson · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Official detail pages observed for current Cedar Rapids scheduling, quality, supervision, safety and project-controls roles; the client and campus are not disclosed.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
051
Critical Building Systems & Skilled Trades — QTS Data CentersKirkwood Community College · published / observed 2026-08-27
Workforce / training systemeducation workforcesupportingcurrent

Current QTS Cedar Rapids job-shadow route introduces critical operations, electrical, mechanical and HVAC careers with a 20-student capacity.

Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
052
Google announces new $40 billion investment in TexasGoogle · published / observed 2025-11-14
Owner / contractor disclosurefirst partydirectcurrent

New Armstrong and Haskell County campuses and training for 1,700+ electrical apprentices by 2030.

Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
053
Google Careers — Haskell data center openingsGoogle · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectoverdue

Official employer search returned nine exact-Haskell records across server operations, facilities, electrical, mechanical, controls, construction program management and network delivery.

Reviewed 2025-11-14 · next 2025-11-15 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
054
Haskell County tax abatement agreementsHaskell County, Texas · published / observed 2026-06-23
Incentive / development agreementpublic recordrecordcurrent

County register lists Haskell DC Owner, LLC (Crusoe) separately from Google-linked Thelma, Journey, Quest and Ranger records.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.
055
Crusoe Haskell construction openingsCrusoe · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Four current official Haskell construction-management and project-specialist records observed on Crusoe's Ashby board.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
056
Doña Ana County, New Mexico Data CenterOracle · published / observed 2026-08-27
Local planning / public recordpublic recordrecordcurrent

Four buildings and a warehouse across 818 acres; 7,000 construction jobs, 1,500 ongoing project-supported jobs, local-priority hiring and an Oracle paid-trainee pathway.

Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.
057
STACK Infrastructure Delivers Digital Infrastructure for Data Center Campus in New MexicoSTACK Infrastructure · published / observed 2025-09-26
Owner / contractor disclosurefirst partydirectcurrent

Names STACK as infrastructure delivery partner, BorderPlex as campus partner and Blue Owl-managed funds as capital backing for the more-than-one-gigawatt Stargate campus.

Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
058
Project Jupiter jobs, workforce and local business routesProject Jupiter / Oracle and STACK Infrastructure · published / observed 2026-08-27
Workforce / training systemeducation workforcesupportingcurrent

Reports 2,700 workers onsite by July 2026, nearly 700 New Mexico residents, 150+ New Mexico firms, UA 412 and Carpenter participation, DACC partnerships, job fairs and a project-specific local-vendor intake.

Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
059
STACK Santa Teresa openingsSTACK Infrastructure · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Official Workday location feed returned 16 current Santa Teresa-capable roles across critical operations, controls, EHS, commissioning, training, procurement and leadership.

Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
060
Economic impact of AWS data center constructionAmazon Web Services · published / observed 2023-10-01
Owner / contractor disclosurefirst partydirectoverdue

Historical national construction-employment baseline used only as a directional model input.

Reviewed 2023-10-01 · next 2023-11-15 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
061
Crusoe Announces New 900 MW AI Factory Campus in AbileneCrusoe · published / observed 2026-03-27
Owner / contractor disclosurefirst partydirectcurrent

Adjacent 900 MW Microsoft campus; site preparation underway, mid-2027 first-building target, thousands of construction and hundreds of permanent jobs expected.

Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
062
Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in ChildressCrusoe · published / observed 2026-07-15
Crusoe newsroomfirst partydirectcurrent

Owner announcement says the 270-acre, 1 GW campus is expected to begin construction in Q3 2026, with thousands of construction jobs and more than 100 permanent positions. Lancium owns the land and manages energy infrastructure; Crusoe says it will design, build and operate the data center for an unnamed hyperscale customer.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyDirect owner/developer statement. Capacity, schedule and jobs are announced expectations rather than permit-confirmed delivery or audited employment.
063
Crusoe and Lancium announce 1 GW Childress campusLancium · published / observed 2026-07-15
Lancium newsroomfirst partydirectcurrent

Lancium's owner-side release confirms a 270-acre, grid-connected campus, Q3 2026 construction target, closed-loop non-evaporative cooling, behind-the-meter solar and storage, thousands of construction jobs and more than 100 long-term roles. It describes Lancium as land and energy-infrastructure developer and Crusoe as data-center designer, builder and operator.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyDirect land and energy developer statement; announced totals and timing are not evidence that the full campus is permitted, built or energized.
064
Texas qualified data-center register · Lancium Clean Campus — Childress 1Texas Comptroller of Public Accounts · published / observed 2026-08-28
Texas Comptroller qualified data-center registerpublic recordrecordcurrent

State register lists Lancium Clean Campus — Childress 1 with March 25, 2025 registration and Lancium LLC as owner, occupant and operator under identifiers LD053115-OW1, LD053115-OC1 and LD053115-OP1. The register predates the Crusoe announcement and does not establish the later campus's full 1 GW as built or energized.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyOfficial state registration record for the named facility and legal roles; registration is not a construction-completion or energization certificate.
065
Childress County tax-abatement agreement · Lancium Phase 4Childress County, Texas · published / observed 2025-03-10
Childress County tax-abatement archivepublic recordrecordcurrent

Executed county agreement names Lancium LLC, Rolling Plains EV Stations LLC and Lancium Childress LLC; sets a minimum Phase 4 threshold of 90,000 square feet and 90 MW; and a December 31, 2030 commercial-operations completion deadline. Its Local Outreach Plan requires commercially reasonable local labor and business efforts, a preconstruction job and contracting session, and active solicitation of local subcontractor proposals, but no numeric local-hire quota.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyExecuted scanned agreement OCR-checked against capacity, completion, contracting and Local Outreach Plan pages. Thresholds are agreement conditions, not proof of current construction or workforce counts.
066
Childress County tax-abatement agreement · Lancium Phase 5Childress County, Texas · published / observed 2025-03-10
Childress County tax-abatement archivepublic recordrecordcurrent

Executed county agreement sets a separate minimum Phase 5 threshold of 90,000 square feet and 90 MW and a December 31, 2031 commercial-operations completion deadline. It repeats the Local Outreach Plan requiring the owner and prime contractor to hold a local job and contracting session and actively solicit local subcontractors.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyExecuted scanned agreement OCR-checked against capacity, completion and outreach pages. Phase thresholds should not be added to the 1 GW announcement as if all capacity were underway.
067
QTS and Lancium announce Hall County data center campusQTS Data Centers · published / observed 2026-07-13
QTS newsroomfirst partydirectcurrent

Joint owner/developer announcement says QTS will design, build and operate data-center buildings on Lancium's Clean Campus near Turkey. It projects more than $10 billion of investment, up to 7,000 peak construction jobs and about 350 permanent QTS, maintenance, security and tenant roles; these are forward-looking totals, not observed employment.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyDirect project-party statement establishes the relationship and announced program. Investment, schedule and job totals remain projections until filings, awards, field evidence and operating records corroborate them.
068
Hall County, Texas development page and project FAQQTS Data Centers · published / observed 2026-08-28
QTS market development pagefirst partydirectcurrent

Current project page describes a proposed campus near Turkey with up to 11 buildings across an approximately 465-acre facility area. QTS labels the market in development, says planning and permitting continue, and explains that the 6,000–7,000 construction and 350 permanent job figures may evolve.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyCurrent owner/operator page is strong evidence of project scope and status language. The page provides a general-area map rather than parcel coordinates, and its jobs and scale figures are plans rather than completed delivery.
069
Texas qualified data-center register · Lancium Clean Campus — Turkey 1Texas Comptroller of Public Accounts · published / observed 2026-08-28
Texas Comptroller qualified data-center registerpublic recordrecordcurrent

State register lists Lancium Clean Campus — Turkey 1 with a January 25, 2026 effective date and Lancium Turkey LLC as registered owner, occupant and operator. The registration predates the July QTS announcement and does not establish that construction, energization or operations have started.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyOfficial state record for the named facility and registered legal roles. Qualification is not a building permit, construction inspection, certificate of occupancy or employment record.
070
Hall County Lancium Turkey Clean Campus Reinvestment Zone No. 1 hearing noticeHall County, Texas · published / observed 2025-05-12
Hall County Commissioners Court noticespublic recordrecordcurrent

County notice describes an approximately 2,014-acre proposed reinvestment zone in southwest Hall County, east of Texas Highway 70 along County Roads AA and 7. It verifies local-government review and general geography, not final abatement terms or construction commencement.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyOfficial hearing notice provides dated geography and proceeding scope. A notice of hearing is not evidence that the zone, an abatement or a construction package was approved.
071
Hall County Turkey Clean Campus abatement-amendment meeting noticeHall County, Texas · published / observed 2026-01-12
Hall County Commissioners Court noticespublic recordrecordcurrent

Commissioners Court notice scheduled discussion and possible action on requested amendments tied to approximately $20 billion of data-center-tenant improvements across about 4,575 acres in two Turkey Clean Campus reinvestment zones. It is an agenda notice, not proof that amendments were adopted or that the broader amount matches QTS's later 465-acre program scope.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyOfficial county agenda verifies the requested action, entities, geography and stated improvement amount. Final approval, executed terms and relationship to the later QTS plan require the signed agreements or minutes.
072
Clarendon College degree and certificate inventoryClarendon College · published / observed 2026-08-28
Clarendon College official program inventoryeducation workforcedirectcurrent

Current inventory lists Childress Center pathways in industrial maintenance, electromechanical technology, basic electrical, electrical controls and HVAC, plus welding credentials. No QTS, Lancium or Turkey placement agreement is disclosed.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyOfficial college catalog inventory verifies credential availability and Childress Center location. Current cohorts, seats, schedules and employer placement must be confirmed with the college.
073
Pecos County Data Center · Building A · TABS2026026954Texas Department of Licensing and Regulation · published / observed 2026-08-04
State construction registrationpublic recordrecordcurrent

State registration covers a new $300 million, 189,060-square-foot data-center building at 6000 TX-18, Fort Stockton, with Amazon Data Services as owner and Gensler as designer. The Aug.–Dec. 2026 dates are filed plans; status remains Project Registered.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for filed address, owner, designer, valuation, area and scheduled dates. Registration does not prove that construction started or finished on schedule.
074
Pecos County Data Center · Building B · TABS2026026955Texas Department of Licensing and Regulation · published / observed 2026-08-04
State construction registrationpublic recordrecordcurrent

Separate state registration covers Building B at the same address: $300 million, 189,060 square feet, Amazon Data Services owner, Gensler designer, and an Aug.–Dec. 2026 filed construction window. Status remains Project Registered.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for this distinct building filing. It supports summing three separately named building scopes, but not asserting actual field progress.
075
Pecos County Data Center · Building C · TABS2026026959Texas Department of Licensing and Regulation · published / observed 2026-08-04
State construction registrationpublic recordrecordcurrent

Separate state registration covers Building C at the same address: $300 million, 189,060 square feet, Amazon Data Services owner, Gensler designer, and an Aug.–Dec. 2026 filed construction window. Status remains Project Registered.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for this distinct building filing. Completion remains scheduled rather than observed until inspection, occupancy or later owner evidence is available.
076
GW Ranch Energy Center · preliminary determination summaryTexas Commission on Environmental Quality · published / observed 2026-02-28
State air-permit recordpublic recordrecordcurrent

TCEQ's preliminary determination describes Pacifico GW LLC's proposed 5,000 MW natural-gas plant on Highway 18 about 17 miles north of Fort Stockton, dedicated to an on-site AI data center and isolated from the local utility distribution system. The record does not identify Amazon or equate plant nameplate with deployed data-center load.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the permit applicant, proposed generating scope and on-site data-center purpose. Relationship to the Amazon address is a geographic inference until parcel, owner or first-party evidence explicitly joins the records.
077
Amazon Jobs · Fort Stockton data center searchAmazon · published / observed 2026-08-28
Amazon Jobs exact-market searchofficial job boarddirectdue soon

Official location search route for Amazon and AWS data-center roles. No current exact-Fort Stockton posting was normalized in this evidence cut.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the employer-controlled route at observation time; zero normalized openings is a snapshot and must be refreshed daily as mobilization advances.
078
Workforce Solutions Permian Basin · Fort Stockton centerPermian Basin Workforce Development Board · published / observed 2026-08-28
Official workforce center and event registereducation workforcedirectcurrent

Official regional workforce board lists a Fort Stockton center at 461 South Highway 285 and provides employer, training and job-seeker services. A January 2026 Texas data-center career fair shows sector familiarity, but no Amazon project agreement is disclosed.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for current location and service availability. Project-specific orders, placements and recruiting commitments require direct board or employer confirmation.
079
Automation · Instrumentation and Electrical TechnologyOdessa College · published / observed 2026-08-28
Regional technical educationeducation workforcesupportingcurrent

Regional AAS and certificate pathway covers electrical systems, instrumentation, PLCs, motor controls, industrial automation, installation, maintenance and troubleshooting. No Pecos County Data Center placement agreement is public.

Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for current college-published curriculum. Distance, current cohorts, seats and Amazon employer use require direct confirmation.
080
Childress Data Center construction job fairWorkforce Solutions Panhandle · published / observed 2026-08-04
Workforce Solutions Panhandle project hiring eventeducation workforcedirectcurrent

Official workforce event, held with Crusoe and Lancium, identified DPR Construction, Hoffman Construction, Rosendin, Siemens Energy, Southland Industries and Target Workforce Housing as participating employers building the Childress facility. It advertised electricians, heavy-equipment mechanics, CDL drivers, mechanical/plumbing/piping trades, managers, superintendents, project engineers, safety, support and materials roles with onsite interviews and conditional offers.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyOfficial public-workforce roster tied to the named project and dated event. It verifies participating hiring employers and role families, not every firm's prime/package scope or that an opening remains live after the event.
081
Hoffman Construction · careers and division portalsHoffman Construction · published / observed 2026-08-28
Hoffman careers hubofficial job boarddirectcurrent

Official careers hub routes applicants across general construction, concrete, mechanical, specialty contracting, layout/modeling, steel and project-support divisions. Workforce Solutions Panhandle ties Hoffman to Childress hiring, but the public careers hub does not expose a stable Childress-filtered requisition set.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyEmployer-controlled application routes are current; project relationship comes from the public workforce event and exact Childress openings remain unnormalized.
082
Rosendin · careers and electrical apprenticeship routesRosendin · published / observed 2026-08-28
Rosendin careers hub and Workdayofficial job boarddirectdue soon

Official employer hub covers skilled craft, electrical apprenticeship, project management, safety, engineering and support roles. The Childress workforce event verifies Rosendin as a project hiring participant; no employer posting reviewed here names the Childress campus.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyCurrent employer-controlled career route. Project relationship is direct from the workforce event, while individual openings require a Childress location or worksite before normalization.
083
Siemens Energy · United States job marketplaceSiemens Energy · published / observed 2026-08-28
Siemens Energy careers marketplaceofficial job boarddirectdue soon

Official United States board exposes engineering, field service, facilities, logistics and project roles. Siemens Energy was a Childress job-fair participant, but its exact equipment or service package and any project-assigned requisition remain undisclosed.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyEmployer-controlled board; the public workforce roster verifies participation, not a specific package or current Childress requisition.
084
Southland Industries · job searchSouthland Industries · published / observed 2026-08-28
Southland Industries job searchofficial job boarddirectdue soon

Official board spans mechanical, plumbing, piping, HVAC, building automation, project management, safety and support work. The Childress job fair verifies Southland as a participating project employer; no stable posting reviewed here names Childress.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyEmployer-controlled board with current postings; project assignment is limited to the workforce-event roster until a Childress requisition is exposed.
085
Crusoe official careers registerCrusoe · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Rendered official board observed for Abilene, Childress and Haskell project-region openings.

Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
086
Microsoft Careers — Mount Pleasant searchMicrosoft · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Official careers search returned 12 Mount Pleasant roles; ten first-page records are normalized in this evidence cut.

Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
087
Microsoft Careers — Abilene searchMicrosoft · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Official careers search returned six fully on-site Abilene data-center records spanning critical-environment engineering, program management and campus operations leadership.

Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
088
Amazon Jobs — Hamlet data center openingsAmazon · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectoverdue

Official Amazon Jobs records observed for Hamlet across controls, infrastructure delivery, network installation and data center operations.

Reviewed 2025-10-30 · next 2025-10-31 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
089
Amazon Jobs — Berwick data center openingAmazon · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Official Amazon Jobs record observed in Berwick, the regional labor market for AWS's Salem Township development.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
090
Applied Technology programsLuzerne County Community College · published / observed 2026-08-28
Workforce / training systemeducation workforcesupportingcurrent

Current local program register includes electrical construction, HVAC, industrial maintenance, mechatronics, electronics, building maintenance and cybersecurity/networking pathways.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
091
LCCC faculty complete AWS-supported fiber optics trainingLuzerne County Community College · published / observed 2026-08-28
Workforce / training systemeducation workforcesupportingcurrent

Official college update documents AWS-supported hands-on fiber installation, testing and maintenance training for faculty, with additional local training opportunities planned.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
092
PA CareerLink of Luzerne CountyPA CareerLink of Luzerne County · published / observed 2026-08-28
Workforce / training systemeducation workforcesupportingcurrent

Official Luzerne County workforce entry point for job search, training navigation and employer services; individual postings still require employer and worksite verification.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
093
Richland Parish Data Center resource pageTurner Construction · published / observed 2026-08-27
Owner / contractor disclosurefirst partydirectdue soon

Project-specific hub for Louisiana positions and construction trade-package interest; also confirms Turner, DPR and Mortenson delivery roles.

Reviewed 2026-07-20 · next 2026-09-03 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
094
Turner Construction — Louisiana and Indiana openingsTurner Construction · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Official Cornerstone board returned 109 unique Louisiana- or Indiana-capable requisitions; 26 exact-market or project-descriptive records are normalized for Richland Parish and Lebanon.

Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
095
DPR careers application transition noticeDPR Construction · published / observed 2026-08-21
Official ATS / job boardofficial job boarddirectdue soon

DPR says applications are temporarily unavailable while it launches a refreshed candidate experience on August 31, 2026; a notification form remains open.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
096
Turner & Townsend — Richland Parish project controls openingsTurner & Townsend · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectoverdue

Official ATS postings observed for onsite data center construction work in Holly Ridge and Rayville, Louisiana.

Reviewed 2026-07-20 · next 2026-07-21 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
097
Carrier — Data Center Service Manager, Monroe / RayvilleCarrier · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectoverdue

Official Workday posting for onsite Rayville data center HVAC startup, commissioning and warranty support.

Reviewed 2026-07-20 · next 2026-07-21 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
098
Data Center Technician workforce programLouisiana Delta Community College · published / observed 2026-08-27
Workforce / training systemeducation workforcesupportingcurrent

Current four-week local training route with construction, electrical, safety, equipment and fiber-splicing credentials.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
099
Louisiana small-business and Meta contractor opportunitiesLouisiana Economic Development · published / observed 2026-08-27
Incentive / development agreementpublic recordrecordoverdue

State-maintained route for Louisiana vendors, subcontractors and suppliers seeking Richland Parish opportunities.

Reviewed 2026-07-20 · next 2026-08-19 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.
100
LDCC data center workforce outcomesLouisiana Delta Community College · published / observed 2026-08-27
Workforce / training systemeducation workforcesupportingoverdue

Identifies IES Communications as a Richland Parish data center workforce partner; separate LDCC reporting identifies CBRE's RPL installer pathway.

Reviewed 2026-07-20 · next 2026-08-19 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
101
Microsoft Datacenter AcademyMicrosoft Careers · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Lists Gateway Technical College and the four associated IT and data-center courses; students apply through the college.

Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
102
Contractors Working on Amazon Data CenterRichmond Community College · published / observed 2026-08-27
Workforce / training systemeducation workforcesupportingcurrent

Local project hiring hub naming AWS and Walbridge contractors and routing job seekers to RichmondCC career support.

Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
103
AWS Fusion Splicing Class Provides Skills Development and GrowthRichmond Community College · published / observed 2026-02-12
Workforce / training systemeducation workforcesupportingcurrent

Documents the local no-cost, two-day certificate course, hands-on curriculum, employer networking and a participant hired by a project contractor.

Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
104
First cohort of data center operators graduate from TSTCTexas State Technical College · published / observed 2026-06-23
Workforce / training systemeducation workforcesupportingcurrent

Confirms the 15-week Abilene MEI Data Center Operator program, first 12 graduates, fall registration and Google's $3.6 million investment in a 2027 Abilene academy and skilled-trades scholarships.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
105
Stargate CommunityOpenAI · published / observed 2026-01-20
Owner / contractor disclosurefirst partydirectcurrent

Announces an Abilene OpenAI Academy intended to connect credentials and local employers; a current enrollment route was not verified in this evidence cut.

Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
106
Construction Project Engineer — Data CentersWalbridge · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectoverdue

Official iCIMS posting identifies a data center project near Hamlet, North Carolina.

Reviewed 2025-10-30 · next 2025-10-31 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
107
Phillips — Rockingham heavy-civil openingsPhillips · published / observed 2026-08-28
Official ATS / job boardofficial job boarddirectdue soon

Official careers API returned 26 current North Carolina records; seven exact-Rockingham craft and civil roles are normalized. RichmondCC identifies Phillips as an AWS Hamlet contractor, but the individual postings do not name the customer.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
108
SteelFab North Carolina career openingsSteelFab · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Official employer pages observed for current Raleigh and Charlotte engineering, detailing, programming and maintenance roles; exact project assignments are not disclosed.

Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
109
Slifco Electric — North Carolina openingsSlifco Electric · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Official Pinpoint board observed with a current North Carolina purchasing role; the posting does not identify the customer or project.

Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
110
Amazon plans to invest $25 billion in Mississippi data centers, create 2,000 jobsAmazon · published / observed 2026-04-09
Official ATS / job boardofficial job boarddirectdue soon

Separates active Canton / Madison County construction, the Warren County campus and the Hinds County retrofit; reports 2,000 planned statewide jobs and 75+ Mississippi companies already engaged.

Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
111
Amazon plans to invest at least $3 billion in Warren CountyAmazon · published / observed 2025-11-20
Local planning / public recordpublic recordrecordcurrent

Vicksburg-area campus announcement with 200 direct jobs, 300 additional regional positions and named Mississippi training partners.

Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.
112
Amazon Jobs — Canton data center openingsAmazon Jobs · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Official live Canton records observed across technician, engineering-operations and site leadership roles.

Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
113
Amazon Jobs — Vicksburg data center openingsAmazon Jobs · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Official live multi-location records cover Vicksburg across technician, engineering operations, network delivery and commissioning; all remain regional until the assigned facility is confirmed.

Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
114
Data Center Technician — Southeast regional poolAmazon Jobs · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Official live pooling requisition covers active or upcoming AWS data-center sites in Virginia, Georgia, Mississippi and North Carolina; no single-campus placement is guaranteed.

Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
115
Amazon Clinton retrofit — Alston Construction and Hinds workforce partnersAmazon · published / observed 2026-06-09
Workforce / training systemeducation workforcesupportingcurrent

Owner update identifies Alston Construction as the Clinton retrofit builder, confirms at least 100 operating jobs and names Hinds Community College and AccelerateMS as workforce partners.

Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
116
Alston Construction — Jackson mission-critical openingsAlston Construction / BambooHR · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Official board currently exposes three Jackson-project mission-critical field and quality roles; postings do not identify the customer, so Clinton matching remains regional.

Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
117
Hinds Community College WIOA and WIN Job CentersHinds Community College · published / observed 2026-08-27
Workforce / training systemeducation workforcesupportingcurrent

Official Jackson and Vicksburg workforce route provides job placement, training assistance, on-the-job training and employer recruiting services.

Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
118
Stimulating the Virginia Economy Through AWS InvestmentAmazon Web Services · published / observed 2024-03-01
Owner / contractor disclosurefirst partydirectcurrent

Owner factsheet confirms a $35 billion plan for multiple new Virginia data-center campuses through 2040 and separates construction, connection, operation and maintenance employment effects.

Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
119
Issued Air Permits for Data CentersVirginia Department of Environmental Quality · published / observed 2026-08-27
Environmental permit / docketpublic recordrecordcurrent

Current state register identifies AWS facilities and recent permits in Spotsylvania, Stafford and Louisa counties, including Cosner Tech Campus and additional IAD facilities.

Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.
120
Amazon Jobs — Fredericksburg regional data-center openingsAmazon Jobs · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Twelve current official requisitions are normalized across launch-team operations, network delivery, safety, critical facilities and construction; two multi-location records remain regional matches.

Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
121
Germanna launches AWS Information Infrastructure Pre-ApprenticeshipGermanna Community College · published / observed 2026-08-27
Workforce / training systemeducation workforcesupportingcurrent

College source documents a paid four-week AWS program covering electrical, HVAC, mechanical and data-center operations, with twenty graduates at the Fredericksburg Area Campus.

Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
122
AWS continues to invest in OhioAmazon Web Services · published / observed 2024-12-24
Owner / contractor disclosurefirst partydirectcurrent

Owner source documents a planned $10 billion Ohio expansion through 2030, identifies Fayette County as the first new site with an estimated $5 billion investment, and describes Columbus State workforce programs.

Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
123
Amazon Data Services CMH205 annual construction activity reportOhio Environmental Protection Agency · published / observed 2025-12-31
Environmental permit / docketpublic recordrecordcurrent

State filing identifies the Jeffersonville campus on 359.56 acres, with fifteen data-processing buildings and four ancillary buildings; Phase 1A began in March 2025 and Phase 1B work is scheduled through December 2027.

Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.
124
Amazon's economic impact in OhioAmazon · published / observed 2026-08-27
Owner / contractor disclosurefirst partydirectcurrent

Current owner impact page states that New Albany investments support more than 1,500 local jobs and provides statewide investment and employment context.

Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
125
Amazon Jobs — Jeffersonville data-center openingsAmazon Jobs · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Six current exact-city requisitions are normalized across security, engineering operations, facilities and cluster leadership; two multi-location engineering records remain regional matches.

Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
126
Amazon Jobs — New Albany data-center openingsAmazon Jobs · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Six current exact-city requisitions are normalized across engineering, safety, logistics and operations leadership; one multi-location logistics record remains a regional match.

Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
127
AWS Data Center Technician CertificateColumbus State Community College · published / observed 2026-08-27
Workforce / training systemeducation workforcesupportingcurrent

College source describes the technician certificate, hardware and network curriculum, maintenance and inventory skills, and AWS scholarships worth up to $3,000 per student.

Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
128
AWS plans $11 billion data center campus in Northern IndianaIndiana Economic Development Corporation · published / observed 2024-04-25
Incentive / development agreementpublic recordrecordcurrent

Locates the decade-scale campus at the Indiana Enterprise Center near New Carlisle and cites at least 1,000 jobs plus state training support.

Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.
129
Amazon plans additional $15 billion Northern Indiana data center investmentAmazon · published / observed 2025-11-24
Owner / contractor disclosurefirst partydirectcurrent

Adds 1,100 planned high-skilled roles and documents the Community Workforce Accelerator, Ivy Tech programs and paid pre-apprenticeship pathway.

Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
130
Amazon Jobs — New Carlisle data center openingsAmazon Jobs · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Official exact-city records observed across construction, controls, facilities, network delivery and operations leadership.

Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
131
Clayco Compute mission-critical portfolioClayco · published / observed 2026-08-27
Owner / contractor disclosurefirst partydirectcurrent

Clayco describes a confidential Indiana data center campus and separately features the AWS South Bend welcome event on the same official page; the client and New Carlisle assignment are not explicitly linked, so the relationship remains unverified.

Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
132
Meta's New Data Center in Lebanon, IndianaMeta · published / observed 2026-02-11
Owner / contractor disclosurefirst partydirectcurrent

Groundbreaking evidence for a 1 GW, $10B+ campus with 4,000+ peak construction jobs, 300 operating roles and a Boone County workforce program.

Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
133
Hello, Lebanon: construction information and opportunitiesMeta Data Centers · published / observed 2026-02-11
Owner / contractor disclosurefirst partydirectcurrent

Project-specific owner page names Mortenson, Turner Construction and Faith Technologies and directs workers to the Lebanon contractor hub.

Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
134
Mortenson begins Indiana data center constructionMortenson · published / observed 2026-02-11
Owner / contractor disclosurefirst partydirectcurrent

Confirms Mortenson's Lebanon delivery role, collaboration with Turner and Faith Technologies, and local trade-partner opportunities.

Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
135
FTI Lebanon project careersFaith Technologies Incorporated · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Project-specific hiring page verifies FTI's Turner and Mortenson partnership and publishes six official Lebanon application routes.

Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
136
Meta and BlackRock announce El Paso data center ventureMeta · published / observed 2026-07-29
Owner / contractor disclosurefirst partydirectcurrent

Current construction evidence for the 1 GW El Paso campus; 2,300 workers onsite, 4,000+ peak construction jobs and 300 operating roles, with first capacity expected in 2028.

Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
137
El Paso data center community resource hubCity of El Paso · published / observed 2026-08-27
Local planning / public recordpublic recordrecordcurrent

City project hub identifies Wiwynn, Faith Technologies and Schneider Electric as regional companies expected to provide services to the Meta project.

Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.
138
FTI El Paso skilled manufacturing and electrical hiringFaith Technologies Incorporated · published / observed 2026-01-27
Official ATS / job boardofficial job boarddirectdue soon

Documents dozens of local electrical, technician, manufacturing and entry-level roles tied to FTI's new El Paso manufacturing facility.

Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
139
FTI Workday — El Paso opening snapshotFaith Technologies Incorporated · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Official ATS location facet returns forty current El Paso-eligible requisitions: seventeen exact-city records and twenty-three multi-location records spanning electrical, controls, low voltage, commissioning, quality, safety, logistics, manufacturing and project delivery.

Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
140
Schneider Electric El Paso project-manager openingSchneider Electric Careers · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Official live El Paso project-execution requisition; the customer is not disclosed, so it is treated as a regional supplier signal.

Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
141
Electrical TechnologyEl Paso Community College · published / observed 2026-08-28
Workforce / training systemeducation workforcesupportingcurrent

Local one-year credit or continuing-education route covering commercial and industrial wiring, motors and controls, PLCs, troubleshooting, electrical safety and embedded OSHA 30 certification.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
142
Information Technology SystemsEl Paso Community College · published / observed 2026-08-28
Workforce / training systemeducation workforcesupportingcurrent

Local IT pathway covering hardware, network administration and troubleshooting, initial network cabling and computer operations; no Meta placement agreement is asserted.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
143
Birdsong Construction employment opportunitiesBirdsong Construction · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Official Clinton-based civil contractor application route; Amazon separately identifies Birdsong as participating in its Mississippi work.

Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
144
America's Workforce Academy: The Future Is for EveryoneMeta · published / observed 2026-06-08
Workforce / training systemeducation workforcesupportingcurrent

No-cost skilled-trades pathway with NCCER credentials and a conditional contractor-partner job; pilot states include Louisiana, Indiana and Texas.

Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
145
Shackelford County, Texas Data CenterOracle · published / observed 2026-01-01
Local planning / public recordpublic recordrecordcurrent

Ten-building, 1,200-acre campus with 5,000+ construction jobs, 1,600+ ongoing project-supported jobs, local-priority sourcing and closed-loop cooling.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.
146
Oracle Careers — Shackelford construction-management openingsOracle Careers · published / observed 2026-05-09
Official ATS / job boardofficial job boarddirectdue soon

Four distinct current field-based OCI construction-management requisitions explicitly cover Shackelford County or Shackelford, Texas, including contractor coordination and turnover readiness.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
147
Vantage unveils Frontier mega-campus in Shackelford CountyVantage Data Centers · published / observed 2025-08-19
Owner project announcementfirst partydirectcurrent

Owner announcement identifies Frontier as a $25B-plus, 1.4 GW campus with 10 data centers, 3.7M square feet and more than 5,000 construction and ongoing-operations workers. It says construction had begun and first delivery was scheduled for the second half of 2026.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect owner evidence for identity, scale and announced status. Investment, workforce and delivery figures remain owner projections until later filings, inspections and observed employment corroborate them.
148
Shackelford County Frontier campus registerVantage Data Centers · published / observed 2026-08-28
Owner facility registerfirst partydirectcurrent

Current owner page confirms the 1,200-acre, 10-building, 1.4 GW and 3.7M-square-foot program and describes liquid cooling, fiber, security and operating systems. First data-center delivery remains scheduled rather than certified complete.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for current owner-published specifications; delivery timing and operating status need inspection or later milestone evidence.
149
Texas qualified data-center register · TX301–TX310Texas Comptroller of Public Accounts · published / observed 2026-08-28
Texas Comptroller qualified data-center registerpublic recordrecordcurrent

State register lists ten Frontier entities effective October 8, 2025: Vantage TX301–TX310 as separate owners/operators and Oracle America Cloud Services as occupant for each facility.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyOfficial record for facility legal roles and effective dates. Qualification does not prove construction completion, energization or occupancy start.
150
Frontier TX301 · TABS2026024068Texas Department of Licensing and Regulation · published / observed 2026-06-29
State construction registrationpublic recordrecordcurrent

Building 1 filing: $950M, 344,796 sq. ft., scheduled Feb. 2026–Aug. 2027; Vantage TX301 owner and Kiewit designer; Project Registered.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for filed scope, owner, designer, value, area and schedule; registered dates are not field milestones.
151
Frontier TX302 · TABS2026024076Texas Department of Licensing and Regulation · published / observed 2026-06-29
State construction registrationpublic recordrecordcurrent

Building 2 filing: $1.185B, 398,117 sq. ft., scheduled Dec. 2025–Sep. 2027; Vantage TX302 owner and Kiewit designer; Project Registered.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for filed scope; status does not verify physical progress or completion.
152
Frontier TX303 · TABS2026024088Texas Department of Licensing and Regulation · published / observed 2026-06-29
State construction registrationpublic recordrecordcurrent

Building 3 filing: $990M, 344,796 sq. ft., scheduled Oct. 2025–Apr. 2027; Vantage TX303 owner and Kiewit designer; Project Registered.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for filed scope; status does not verify physical progress or completion.
153
Frontier TX304 · TABS2026024091Texas Department of Licensing and Regulation · published / observed 2026-06-29
State construction registrationpublic recordrecordcurrent

Building 4 filing: $1.315B, 453,385 sq. ft., scheduled Sep. 2025–May 2027; Vantage TX304 owner and Kiewit designer; Project Registered.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for filed scope; status does not verify physical progress or completion.
154
Frontier TX305 · TABS2026024094Texas Department of Licensing and Regulation · published / observed 2026-06-29
State construction registrationpublic recordrecordcurrent

Building 5 filing: $955M, 344,796 sq. ft., scheduled Oct. 2025–Feb. 2027; Vantage TX305 owner and Kiewit designer; Project Registered.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for filed scope; status does not verify physical progress or completion.
155
Frontier TX306 · TABS2026024095Texas Department of Licensing and Regulation · published / observed 2026-06-29
State construction registrationpublic recordrecordcurrent

Building 6 filing: $950M, 344,796 sq. ft., scheduled Jan. 2027–May 2028; Vantage TX306 owner and Kiewit designer; Project Registered.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for filed future scope; scheduled work is not current construction.
156
Frontier TX307 · TABS2026024102Texas Department of Licensing and Regulation · published / observed 2026-06-29
State construction registrationpublic recordrecordcurrent

Building 7 filing: $1.15B, 398,117 sq. ft., scheduled Nov. 2026–Apr. 2028; Vantage TX307 owner and Kiewit designer; Project Registered.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for filed future scope; scheduled work is not current construction.
157
Frontier TX308 · TABS2026024110Texas Department of Licensing and Regulation · published / observed 2026-06-29
State construction registrationpublic recordrecordcurrent

Building 8 filing: $965M, 344,796 sq. ft., scheduled Sep. 2026–Apr. 2028; Vantage TX308 owner and Kiewit designer; Project Registered.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for filed future scope; scheduled work is not current construction.
158
Frontier TX309 · TABS2026024111Texas Department of Licensing and Regulation · published / observed 2026-06-29
State construction registrationpublic recordrecordcurrent

Building 9 filing: $1.161B, 398,117 sq. ft., scheduled Apr. 2026–Nov. 2027; Vantage TX309 owner and Kiewit designer; Project Registered.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for filed scope; status does not verify physical progress or completion.
159
Frontier TX310 · TABS2026024112Texas Department of Licensing and Regulation · published / observed 2026-06-30
State construction registrationpublic recordrecordcurrent

Building 10 filing: $945M, 344,796 sq. ft., scheduled Jun. 2026–Oct. 2027; Vantage TX310 owner and Kiewit designer; Project Registered.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for filed scope; status does not verify physical progress or completion.
160
Frontier support office · TX311 · TABS2026024113Texas Department of Licensing and Regulation · published / observed 2026-06-30
State construction registrationpublic recordrecordcurrent

Separate $74M support-office filing at Building 11 lists 1,548,000 square feet. Gridwork excludes it from the ten data-center building total because the scope is not a data center and the unusually large filed area requires clarification.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for the filed record as written; qualified for physical area and campus rollup because the support-office classification and 1.548M-square-foot figure may reflect filing error or broader scope.
161
Shackelford County agenda · Vantage Data Center emergency responseShackelford County, Texas · published / observed 2026-04-13
County Commissioners Court agendapublic recordrecordcurrent

County agenda considered designating the Abilene Fire Department as primary responder for the Vantage Data Center, independently linking the Vantage identity to the county project area.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyOfficial agenda verifies the named emergency-response matter. It does not by itself prove the action taken; minutes or a signed agreement remain the next record target.
162
Kiewit · current Abilene data-center openingsKiewit Careers · published / observed 2026-08-28
Kiewit official careers searchofficial job boarddirectdue soon

Official board exposes exact-Abilene data-center roles across fiber, materials, quality and emergency/clinic operations. Six stable detail pages are normalized; additional list-only Abilene results remain discoverable but unnormalized until a stable record is resolved.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for current titles and location at observation time. Kiewit is named on Frontier filings, but postings do not print the Frontier customer or exact building; residual assignment ambiguity is disclosed on each opening.
163
ACS launches Coravel and signs first DFW hyperscale leaseACS Group · published / observed 2026-07-15
Owner platform announcementfirst partydirectcurrent

Owner announcement describes a five-facility DFW program: about 140 MW across three leased facilities plus expansion rights for about 100 MW across two more. Turner will lead construction, with staggered service dates through 2028. Gridwork resolves this to Hicks Field from the matching five-building program, ACS legal entities, filing sequence and Fort Worth records; the announcement itself does not print the street address.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for Coravel, capacity, building count, Turner and service-date plan. Exact Hicks Field identity is a high-confidence cross-record resolution because the release omits the address; service dates are not completion evidence.
164
M&C 25-0301 · Hicks Field economic-development agreementCity of Fort Worth · published / observed 2025-04-08
City council economic-development agreementpublic recordrecordcurrent

Official council communication identifies a 107-acre, five-building campus at 10059 and 10197 Hicks Field Road and 9401 Wagley Robertson Road. Terms require $481.6M in real-property improvements, $1.685B in business personal property, 37 full-time jobs by 2034 averaging at least $150,000, and 15% hard-construction spending with Business Equity Firms for the full incentive tier.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyOfficial adopted terms for minimum commitments and addresses. Commitment deadlines are not evidence that investment, hiring or local-equity spending has already occurred.
165
Fort Worth City Council minutes · M&C 25-0301 approvedCity of Fort Worth · published / observed 2025-04-08
City council minutespublic recordrecordcurrent

Official minutes record council approval of the Hicks Field economic-development agreement.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyHigh for approval status. The minutes do not establish later compliance, construction progress or grant payment.
166
Hicks Field Data Center Substation · waiver staff reportCity of Fort Worth · published / observed 2025-07-23
City Plan Commission docketpublic recordrecordcurrent

City staff report covers ACS Infra's proposed Oncor substation on 47.231 acres and calls it critical infrastructure for the associated future data center. Staff recommended the platting waiver.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyOfficial evidence of the proposed substation and staff recommendation. The agenda is not final action, energization or proof of campus operation.
167
Texas large-data-center register · Hicks FieldTexas Comptroller of Public Accounts · published / observed 2026-08-18
Texas Comptroller qualified data-center registerpublic recordrecordcurrent

State register lists ACS DC Hicks Field Road LLC as owner, the occupant field as rendered with Google LLC and Paile LLC, and Vanguard US ServiceCo LLC as operator, effective August 18, 2026.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyOfficial legal-role record. The page's occupant formatting is preserved rather than silently normalized; qualification does not establish service start or public hiring.
168
Hicks Field DFW11 · TABS2026008166Texas Department of Licensing and Regulation · published / observed 2025-12-16
State construction registrationpublic recordrecordcurrent

DFW11 filing: $280M, 251,303 sq. ft., two data halls and scheduled Jan. 2026–Jun. 2027; ACS DC Hicks Field Road owner and Corgan designer; Project Registered.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for filed scope, value, parties and schedule. Project Registered and scheduled dates do not verify field progress or completion.
169
ACS DFW12 Hicks Field · TABS2026016045Texas Department of Licensing and Regulation · published / observed 2026-03-26
State construction registrationpublic recordrecordcurrent

DFW12 filing: $100M, 283,274 sq. ft., four data halls and scheduled Aug. 2026–May 2028; Vanguard Project Co. DFW12 owner and Corgan designer; Project Registered.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for filed scope. The August start is scheduled, not a verified mobilization date.
170
ACS DFW13 Hicks Field · TABS2026019235Texas Department of Licensing and Regulation · published / observed 2026-05-04
State construction registrationpublic recordrecordcurrent

DFW13 filing: $100M, 283,274 sq. ft., four data halls and scheduled Jan. 2026–Jan. 2028; Vanguard PropCo 1 owner and Corgan designer; Project Registered.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for the record as filed. The owner name and design-firm address contain apparent filing typos, so Gridwork preserves the source while using corroborated entity relationships for the campus graph.
171
ACS 2025 consolidated financial statements · Vanguard affiliatesACS Group · published / observed 2026-02-01
Owner financial filingfirst partydirectcurrent

ACS consolidated affiliate list includes ACS Digital USA, Vanguard PropCo entities and Vanguard US ServiceCo, supporting the legal-entity resolution behind Coravel's U.S. platform.

Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · high accuracyHigh for ACS group-affiliate membership. The affiliate list alone does not allocate each entity to Hicks Field; the state and building records make that project link.
172
Adult Vocational Academy · maintenance, HVAC, electrical and plumbingTarrant County College · published / observed 2026-08-13
Community-college program registereducation workforcedirectcurrent

Fort Worth 12-week pathway covers maintenance fundamentals, electrical troubleshooting, HVAC, plumbing, safety, job-search preparation and EPA 608 certification.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for current published curriculum and duration. No Hicks Field, ACS, Turner, Coravel or Google placement agreement is asserted.
173
Tarrant County job-seeker and employer servicesWorkforce Solutions for Tarrant County · published / observed 2026-08-28
Public workforce boardeducation workforcedirectcurrent

County workforce board offers job matching, workforce centers, hiring events, training support and no-cost employer recruiting services.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for published services. No Hicks Field recruiting agreement or employer participation is public in this review.
174
Austin Campus AUS01 · LockhartPrime Data Centers · published / observed 2026-08-28
Owner campus registerfirst partydirectcurrent

Owner campus page presents an eight-building, 205-acre, 384 MW and 2,000,000-square-foot Lockhart plan with onsite Bluebonnet substation service and closed-loop air and liquid cooling. All eight buildings are labeled Development / Available; Gridwork does not treat that status as construction or completion.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for the owner-published campus plan and marketing status. The page's 144 MW figure appears only under AUS01-01 and is not multiplied across buildings; filed building scope is controlled separately by TDLR.
175
AUS01-02 technical sheetPrime Data Centers · published / observed 2025-10-01
Owner technical documentfirst partydirectcurrent

Owner technical sheet identifies AUS01-02 at 3300 FM 2720 as a 250,000-square-foot hyperscale building with liquid cooling in development and available for customers.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyDirect for owner-published product specifications. Marketing availability is not a permit, construction milestone or executed lease, and the PDF path month is used as the document date because no separate publication date is printed.
176
Prime Data Center AUS01 and AUS02 · TABS2026019473Texas Department of Licensing and Regulation · published / observed 2026-05-05
State construction registrationpublic recordrecordcurrent

State registration covers two new 380,000-square-foot shell buildings at 1395 Bob White Road: 760,000 filed square feet, $400 million stated cost and a scheduled June 2026–September 2027 window. Lockhart Property LLC is owner, no tenant is assigned and Gensler is designer.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for the record as filed. Project Registered and scheduled dates do not verify mobilization, inspection, completion or a separately filed AUS01-03 building.
177
Lockhart Property AUS01 · stormwater authorization TXR1558XRTexas Commission on Environmental Quality · published / observed 2026-03-19
TCEQ Central Registry and Water Quality General Permits Searchpublic recordrecordcurrent

Active construction authorization identifies Lockhart Property AUS01 at 1395 Bobwhite Road, Sundt Construction as operator, 88.81 disturbed acres, a March 11, 2026 estimated start, March 19 coverage, July 31, 2027 estimated end and receiving waters in the Plum Creek watershed. The registry supplies site coordinates 29.924164, -97.753544.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for authorization status, operator, dates, disturbed acreage, address and coordinates as recorded. Coverage and estimated dates authorize and describe construction; they do not independently prove the quantity of work completed or vertical-building progress.
178
Texas large-data-center register · AUS 01 02 03Texas Comptroller of Public Accounts · published / observed 2026-08-17
Texas Comptroller qualified data-center registerpublic recordrecordcurrent

State register names the large data center project AUS 01 02 03, Lockhart Property LLC as owner and operator, and Paile LLC as occupant, effective August 17, 2026.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyOfficial legal-role and project-name record. Qualification does not prove physical progress, service or hiring, and Paile's wider corporate identity is not inferred beyond the register here.
179
Caldwell County highlights · Prime reinvestment zone and six agreementsCaldwell County, Texas · published / observed 2024-03-12
County incentive and meeting recordpublic recordrecordcurrent

County recap records an initial three-building campus at FM 2720 and Bob White Road, three Chapter 312 abatements and three Chapter 381 agreements. It estimates $1.3 billion in aggregate improvements, $280,000 per property per year under the abatements and minimum employment conditions whose numeric threshold is not printed on the served page.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyHigh for approved program structure and stated amounts. The recap references minimum employment requirements but does not disclose the count, so Gridwork leaves the threshold unresolved.
180
Caldwell County sealed special minutes · Prime agreements approvedCaldwell County, Texas · published / observed 2024-03-12
County Commissioners Court minutespublic recordrecordcurrent

Official minutes record approval of Prime Reinvestment Zone #1, the three tax-abatement agreements, the three Chapter 381 agreements and the $1.3 billion aggregate improvement estimate.

Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · high accuracyHigh for formal approval. The minutes do not prove later compliance, construction progress, hiring or tax payments.
181
Lockhart Property development agreement · Prime AUS01Caldwell County, Texas · published / observed 2026-04-23
County development agreementpublic recordrecordcurrent

Execution version identifies Lockhart Property LLC, approximately 205.756 acres and the Prime Data Centers AUS01 development, and sets drainage, site-development and variance terms. County recap confirms approval on April 23, 2026.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the parties, acreage and adopted development framework. An agreement authorizes and conditions development; it is not a field-start or completion record.
182
Caldwell County data-center workshop · Prime and Tract separatedCaldwell County, Texas · published / observed 2026-03-16
County workshop recappublic recordrecordcurrent

County workshop recap distinguishes Prime's separate approximately 206-acre facility from Tract's 3,000-acre Caldwell Valley Technology Park. Gridwork uses this record to prevent the projects, capacity and job signals from being merged.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyHigh for the county's explicit project separation and approximate acreage. Negotiation status was current at the March workshop and was superseded by the April development-agreement approval.
183
Prime Data Centers · current Lockhart openingsPrime Data Centers Careers · published / observed 2026-08-28
Prime owner careers page and Rippling ATSofficial job boarddirectdue soon

Owner careers page displayed 36 total positions and seven exact-Lockhart listings across commissioning, two construction-scheduler postings, construction project management, controls operations, QA/QC and construction leadership. Five were simultaneously visible in the official Rippling index; the controls and VP records remain separately disclosed rather than silently collapsed.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · qualified accuracyHigh for titles and Lockhart locations observed on the owner page. Qualified for cross-system availability because the owner frontend and Rippling index were not perfectly synchronized at review time; refresh daily.
184
Sundt Careers · current Lockhart data-center openingsSundt Construction · published / observed 2026-08-28
Sundt Oracle Recruiting job inventoryofficial job boarddirectdue soon

Official job-board review found 46 current data-center results, including four that name Lockhart: Data Center MEP Manager, Quality Manager – Data Center Construction, Concrete Field Superintendent – Data Centers, and a multi-location HSE Manager – Data Center Construction role that includes Lockhart. Gridwork links these roles directly to AUS01 because TCEQ independently names Sundt as the site's construction-permit operator.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · qualified accuracyHigh for observed titles, locations, posting dates and official requisition URLs. The job descriptions do not print Prime or AUS01, so the project match relies on the independent TCEQ operator record plus Prime being the disclosed Lockhart data-center site; refresh daily because openings can close without notice.
185
Sundt subcontractor prequalification and vendor routeSundt Construction · published / observed 2026-08-28
General-contractor subcontractor portalfirst partydirectcurrent

Official trade-partner portal states that subcontractors must prequalify before award, routes firms through BuildingConnected / SubQual, requires annual status refresh and asks applicants to identify self-performed CSI MasterFormat scopes. The route is company-wide and does not expose an AUS01-specific bid package.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for Sundt's company-wide prequalification process and portal. Qualified for AUS01 opportunity because no public package, bid date or Lockhart solicitation is shown; firms should name the project and verify an active package with Sundt.
186
Caldwell Valley access construction · TXR1593YF and TXR1535YVTexas Commission on Environmental Quality · published / observed 2026-07-14
TCEQ Central Registry and Water Quality General Permits Searchpublic recordrecordcurrent

Two active construction authorizations name M. A. Mortenson Company as operator for Caldwell Valley Technology Park infrastructure. TXR1593YF covers 50 disturbed acres at the 727 Farmers Road LCRA access, began May 13 and estimates work through July 16, 2027. TXR1535YV covers 35 disturbed acres at the Farmers Road construction entrance, began July 14 and carries the same estimated end date. Both identify industrial construction, a common plan of development and Clear Fork Plum Creek receiving waters.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for permit status, operator, site labels, dates, disturbed acreage, locations and coordinates as recorded. The authorizations verify access and entrance construction scope; they do not establish a data-hall building start, installed power, tenant or percentage complete.
187
Mortenson trade-partner prequalification and bid-list routeMortenson · published / observed 2026-08-28
General-contractor trade-partner programfirst partydirectcurrent

Official company-wide program requires trade partners to complete prequalification before contract award, uses TradeTapp / BuildingConnected and provides a separate bid-list contact route. It does not publish a Caldwell Valley package, bid date or award on the served page.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for Mortenson's company-wide eligibility and bid-list process. Qualified as a Caldwell Valley opportunity route because no campus-specific solicitation is public; firms should identify Caldwell Valley and verify an active scope.
188
Workforce Solutions Rural Capital Area · Caldwell County centerWorkforce Solutions Rural Capital Area · published / observed 2026-08-28
Public workforce boardeducation workforcedirectcurrent

Official Lockhart center provides no-cost recruitment, employment and information services to employers and job seekers in Caldwell County.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for published center location and services. No Prime-, Tract- or contractor-specific intake or placement agreement is public in this review.
189
ACC Lockhart Center · skilled-trades coursesAustin Community College District · published / observed 2026-08-28
Community-college course scheduleeducation workforcedirectcurrent

Current Lockhart schedule and center pages identify hands-on training in HVAC, plumbing, welding and construction, including Basic Electricity for HVAC and Introduction to the Construction Industry at the 20,000-square-foot Ford Building.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for published programs and observed 2026 course schedule. Live sections, seats, prerequisites and future terms change; no Prime or Tract placement agreement is disclosed.
190
Caldwell County approves EDC Austin tax abatementCaldwell County, Texas · published / observed 2026-03-30
County Commissioners Court recappublic recordrecordcurrent

County recap records approval of the Chapter 312 agreement for a turnkey data center, identifies Edged Energy as expected owner/operator, places the campus on approximately 330 acres off SH 142 near LCRA's Timmerman Powerplant in the Maxwell area and publishes a $7.3 billion improvements estimate.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the county action, named public operator, approximate geography and county estimate. The acreage is rounded; the two executed development agreements control the exact 319.936-acre total. The estimate is not verified spend or taxable value.
191
EDC Austin abatement notice · CDE Acquisitions property-owner recordCaldwell County, Texas · published / observed 2026-02-19
Statutory tax-abatement notice in county agenda packetpublic recordrecordcurrent

The statutory newspaper notice reproduced in the March 26 county packet names CDE Acquisitions LLC as owner of the property and EDC Austin LLC as the tax-abatement applicant. It also publishes the four-corner Caldwell 142 Reinvestment Zone #1 coordinates and the $7.3 billion best-estimate capital figure. The packet's agenda cover instead calls EDC Austin both property owner and applicant, so Gridwork preserves the notice and agenda wording as a public-record discrepancy.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for what the published legal notice states. Qualified for current ownership because the same packet's agenda cover, executed agreement, later development agreements, land survey, TDLR filing and Texas register assign owner-like roles to different entities. The notice is not a deed, title report, permit or field-start record.
192
EDC Austin · executed Chapter 312 tax-abatement agreementCaldwell County, Texas · published / observed 2026-03-26
Executed county incentive agreementpublic recordrecordcurrent

Executed agreement projects construction by April 15, 2026 and substantial completion by August 15, 2028. It targets 30 full-time-equivalent jobs in abatement year one and 50 in years two through ten at a $67,500 average salary; qualifying jobs may be with the owner, affiliates, tenants or vendors whose full-time workplace is the project. It also sets a 215-gallon-per-month-per-megawatt water limit, excluding the initial non-potable cooling-system charge.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for executed terms, targets and definitions. Construction dates are contractual projections, not field evidence. Job and salary targets are incentive metrics rather than guaranteed payroll; missing them changes abatement and PILOT calculations but is expressly not a default.
193
Caldwell County approves two Edged campus development agreementsCaldwell County, Texas · published / observed 2026-04-13
County Commissioners Court recappublic recordrecordcurrent

County recap records unanimous approval of two development agreements for the Maxwell-area campus and states that Edged Energy will own and operate it. It reports the rounded 330-acre and $7.3 billion scope and describes closed-loop server cooling with a finite initial non-potable fill and potable water limited to ordinary fixtures and food preparation.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for approval and the county's public project description. Exact acreage, parties and permit conditions are taken from the executed agreements; the owner/operator statement is county attribution and should be rechecked if the project is assigned or sold.
194
EDC Austin · 127.328-acre development agreementCaldwell County, Texas · published / observed 2026-04-09
Executed county development agreement and exhibitspublic recordrecordcurrent

Executed phase-one agreement names EDC Austin LLC as developer of 127.328 acres. It sets the two-step mass-grading / permanent-road floodplain process, a two-stage site-and-foundation then vertical-building permit path, closed-loop cooling, contemplated interim onsite natural-gas generation, later LCRA or other utility interconnection and an illustrative Kimley-Horn site plan with two SH 142 entrances.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the legal party, exact acreage, adopted conditions and credited consultant. The agreement vests and permits a development path; its site plan is expressly illustrative and nonbinding, and it does not prove that a permit was issued or work began.
195
EDC Austin LandCo · 192.608-acre development agreementCaldwell County, Texas · published / observed 2026-04-09
Executed county development agreement and survey exhibitspublic recordrecordcurrent

Executed phase-two agreement names EDC Austin LandCo LLC as developer of 192.608 acres and applies the same closed-loop cooling, interim onsite-generation, utility-interconnection, floodplain, grading, foundation and vertical-permit framework. Together with phase one, the executed footprint totals 319.936 acres.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the legal party, exact acreage and adopted development conditions. It is authorization and entitlement evidence, not proof of construction, power delivery, final building configuration or completion.
196
Edged Energy-Austin · TABS2026019322Texas Department of Licensing and Regulation · published / observed 2026-05-04
State construction registrationpublic recordrecordcurrent

State accessibility registration identifies 11255 Hwy 142 in Maxwell, a $2.8 billion privately funded new 869,684-square-foot one-level data-center building, a filed June 2026–June 2028 schedule, Capital Land Investments I LP as building owner, no assigned tenant and MG2 Architecture Corporation as designer.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for the record as filed. Review Complete is the accessibility-plan status; it does not prove a building permit, mobilization, inspection, substantial completion or operation. Dates and cost are applicant-supplied and require refresh.
197
Maxwell parcel 11780 · appraisal roll and deed-history indexCaldwell County Appraisal District · published / observed 2026-08-28
County appraisal roll and deed-history indexpublic recordrecordcurrent

The 2026 appraisal roll identifies property 11780 / geo ID 0100188-184-000-00 on Hwy 142 in Maxwell as 320.35 acres with no improvements and Capital Land Investments I LP as 100% owner. The district's deed-history index shows a July 24, 2020 special warranty deed from JDB Turner Crest LLC to Capital Land Investments I LP, instrument 2020-003860 / page 2020-003851. The legal description spans the Thomas Maxwell A188 survey and part of Hector McNeill A199, matching the tract scale and landholder named in the Edged development exhibits and TDLR filing.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for the 2026 roll and indexed deed fields as displayed. Qualified for current legal title and exact acreage because the appraisal district labels its data research-only, directs users to verify legal descriptions and acreage, and reported ownership processing only through April 29, 2026 at review time. A later deed, assignment or unprocessed record may not appear; use the county clerk's official public records or a title report for legal title.
198
Caldwell County data-center engineering-register sweep · May–August 2026Caldwell County, Texas · published / observed 2026-08-27
Eight-packet county engineering invoice-register sweeppublic recordsupportingcurrent

Gridwork reviewed all eight regular-meeting agenda packets from May 14 through August 27. County engineer payment registers name Prime AUS03 site-plan review in May, Prime AUS01 site-plan review in June and August, and Prime AUS01 Buildings B&C review in August. They also continue Caldwell Valley traffic, driveway, floodplain CLOMR and LCRA-access-drive reviews. No reviewed register entry exactly names Edged, EDC Austin, CDE Acquisitions, Capital Land Investments, 11255 Hwy 142 or Kimley-Horn project 060027703.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for the exact invoice descriptions found and for the scoped no-match across the reviewed packet text. An invoice description proves county engineering review activity, not permit issuance, physical work or completion. A missing exact name does not prove no application exists under another label, parcel, consultant or unindexed county system.
199
Caldwell County Resolution 29-2026 · data-center safeguardsCaldwell County, Texas · published / observed 2026-05-14
Adopted county resolution and sealed meeting recordpublic recordrecordcurrent

The adopted resolution supports appropriately designed and sited data centers while requesting stronger state and local authority over grid reliability, water, roads, drainage, agriculture and public reporting. It favors closed-loop cooling, non-potable water where feasible, and independent impact analysis.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyHigh for the county's adopted policy position. The resolution requests safeguards and legislation; it is not a permit decision, zoning ordinance, construction moratorium or revocation of an existing development agreement.
200
Caldwell County fire code and large-data-center incentive pauseCaldwell County, Texas · published / observed 2026-08-17
County meeting recap, adopted fire code and Resolution 34-2026public recordrecordcurrent

The August 13 recap records adoption of portions of the 2024 International Fire Code with fire-marshal inspections for covered buildings and Resolution 34-2026, which pauses new county economic-incentive and tax-abatement agreements for large data centers until the 90th Texas Legislature adjourns. The county says future developers may still pursue development agreements without incentives.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the adopted county actions and their stated scope. The incentive pause is not a construction moratorium and does not by itself cancel Prime, Tract or Edged agreements. Fire-code applicability and inspection status must be checked at the building level.
201
Caldwell County unnamed data-center land-option lead · releasedCaldwell County, Texas · published / observed 2026-08-17
County minutes and subsequent county recappublic recordrecordcurrent

July 23 county minutes record a pre-sale agreement with a land-acquisition company interested in a potential data center. The August 13 county recap says the judge and all parties had been released from that agreement. No parcel, acreage, buyer legal name, project code, capacity, investment, application or permit is public in the reviewed record.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for the existence and subsequent release of the disclosed pre-sale agreement. Qualified as a project signal because the site, company and development scope were not disclosed, and a released land option is not an active data-center proposal. Monitor only for a new filing or materially new agreement.
202
Edged U.S. · careers and current rolesEdged U.S. · published / observed 2026-08-28
Owner careers page with employer-attributed listing cross-checkofficial job boarddirectdue soon

Official owner careers route for North American development, construction, commissioning and operations roles. No reviewed owner posting names Maxwell, EDC Austin or 11255 Hwy 142; one current employer-attributed Data Center Commissioning Manager listing says remote U.S. with greater-Austin candidates preferred and remains a regional lead only.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · qualified accuracyHigh for the official careers route. The Austin-preference detail is employer-attributed through LinkedIn because the owner page's open-role module is not reliably indexable; assignment to the Maxwell campus is unverified and must not be implied.
203
Data Center Commissioning Manager · greater Austin preferredEdged via LinkedIn · published / observed 2026-08-28
Employer-attributed professional-network listingreported secondarysupportingdue soon

Current employer-attributed full-time Edged listing is remote within the contiguous United States and says a candidate in greater Austin, or willing to relocate there, is highly preferred. The post does not name the Maxwell campus, EDC Austin or the Hwy 142 worksite.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · qualified accuracyQualified current hiring signal. Title and location preference are employer-attributed, but the listing is not the owner-controlled careers page and project assignment is unresolved. Recheck availability and application routing daily.
204
MG2 · Project Architect, Data CentersMG2 · published / observed 2026-08-28
Designer careers pageofficial job boarddirectcurrent

Official MG2 posting for a fully remote project architect with data-center expertise and no stated closing date. TDLR separately names MG2 on the Maxwell building, but the requisition does not name Edged, Maxwell or the Texas filing and is retained as a regional supplier lead only.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · qualified accuracyHigh for the posted role and requirements at review. Qualified for project matching because no site assignment is disclosed; reconfirm that applications remain accepted before relying on it.
205
Caldwell Valley · owner project registerTract · published / observed 2026-08-28
Owner campus registerfirst partydirectcurrent

Owner register labels Caldwell Valley Owned & In Development and publishes a 2,973-acre, 4,000 MW plan, 2028 site-energization target, 345 kV transmission access, the Kinder Morgan Permian Highway gas-pipeline corridor and multiple campus options.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for the owner's current plan and infrastructure description. Capacity and energization are development targets, not installed load, service or completed buildings.
206
Caldwell Valley expands to 2,973 acresTract · published / observed 2026-01-13
Owner acquisition and infrastructure announcementfirst partydirectcurrent

Owner announcement records two closed acquisitions adding 1,458 acres to the original 1,515-acre park. It says Tract, Bluebonnet and LCRA are planning a scalable onsite substation, with the first 250 MW contracted for Q1 2028 delivery, and that onsite generation planning has begun.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for closed acreage and owner-named planning parties. The 4 GW-plus potential, 1.6 GW substation scale, 250 MW delivery date and onsite generation remain forward-looking until utility, regulatory or energization records verify delivery.
207
Technology Park at Caldwell Valley · development agreementCaldwell County, Texas · published / observed 2025-02-11
County development agreement and conceptual site-plan exhibitspublic recordrecordcurrent

County-served agreement names TXLCO Caldwell County LLC as developer and covers ten tracts totaling approximately 1,515.309 acres. It allows data centers and related power, transmission, water and wastewater infrastructure; requires whole-property utility, drainage and traffic plans with the first preliminary plat; and states a $15 million road-improvement obligation. Exhibits show conceptual development areas, potential substations and Norris Design authorship.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · qualified accuracyThe county recap and meeting record establish approval, but the PDF served online is an unsigned copy of the approved terms. It resolves the recap's obvious acreage typo to 1,515.309 acres. The agreement says SH 2720 while county geography and later records identify FM 2720; Gridwork preserves that discrepancy and does not infer construction.
208
Caldwell Valley development-agreement expansionCaldwell County, Texas · published / observed 2025-10-23
County Commissioners Court recappublic recordrecordcurrent

County recap records approval of the first amendment adding approximately 1,500 acres to the Technology Park at Caldwell Valley development-agreement area near FM 2720 and Jolley Road. It describes data-center and innovation-center uses.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · qualified accuracyHigh for approval, purpose and approximate location. Tract's later closed-acquisition record supplies the more precise 1,458-acre addition and 2,973-acre total.
209
Caldwell Valley first-amendment approval · sealed minutesCaldwell County, Texas · published / observed 2025-10-23
County Commissioners Court sealed minutespublic recordrecordcurrent

Sealed minutes record Tract developer Mitch Nelson's request to add approximately 1,500 acres without changing the agreement's terms, Commissioner Theriot's recusal and unanimous approval by the participating court.

Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · high accuracyPrimary approval record. The minutes use an approximate acreage; the owner's later acquisition announcement controls the exact increment and total used in Gridwork.
210
Caldwell Valley civil-review activity · county payment registerCaldwell County, Texas · published / observed 2026-06-25
County engineering invoice and agenda-packet registerpublic recordsupportingcurrent

County payment register identifies active engineering review entries for Caldwell Valley's floodplain CLOMR and driveway access plus a Tract LCRA access drive. The May 28 register also names the campus traffic-impact assessment.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect evidence that named civil submissions were under county engineering review in May–June 2026. Invoice descriptions do not establish permit approval, physical mobilization, contractor award, completion or utility service.
211
Tract · official careers routeTract · published / observed 2026-08-28
Owner careers page and resource indexofficial job boarddirectcurrent

Official careers route and Tract resource index were reviewed. No current posting observed in this evidence cut names Caldwell Valley, Caldwell County, Lockhart, Uhland or Maxwell; older Denver and remote resource pages are not treated as current campus vacancies.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · qualified accuracyHigh for the absence of an exact project location on the reviewed official route. The page is JavaScript-rendered and older indexed role pages can persist, so the board requires weekly recheck.
212
LCRA · official career categories and locationsLower Colorado River Authority · published / observed 2026-08-28
Utility career indexofficial job boarddirectcurrent

Official board publishes Texas roles across transmission, engineering, project management, telecom, facilities, power operations and maintenance. No reviewed requisition names Caldwell Valley or the Tract LCRA access drive.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · qualified accuracyHigh for the current official career route and categories. Individual requisitions change and remain regional until LCRA names the Caldwell Valley worksite or assignment.
213
Kinder Morgan · official careersKinder Morgan · published / observed 2026-08-28
Pipeline operator career indexofficial job boarddirectcurrent

Official board covers field operations, trades, safety, engineering and project management. No reviewed posting names Caldwell Valley or an onsite-generation package.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · qualified accuracyHigh for the current official job route. The owner's pipeline-corridor reference establishes proximity, not a Kinder Morgan construction contract or project assignment.
214
Norris Design · official career routeNorris Design · published / observed 2026-08-28
Consultant career pageofficial job boarddirectcurrent

Official careers page exposes Texas and other office filters plus a general application route. No reviewed posting names Caldwell Valley.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · qualified accuracyHigh for the official route. A Texas office posting is not assigned to Caldwell Valley unless Norris Design names the project or worksite.
215
Bluebonnet careers and lineworker apprentice programBluebonnet Electric Cooperative · published / observed 2026-08-28
Utility careers and apprenticeship pageeducation workforcedirectcurrent

Utility careers page publishes year-round recruiting for its Department of Labor-certified lineworker apprentice pool, with 672 hours of technical instruction and 8,000 hours of on-the-job learning over roughly four years.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the employer's current program description. Entry into the application pool is not a vacancy, hire or assignment to either the Prime or Caldwell Valley substation program.
216
OpenAI and SoftBank Group partner with SB EnergySB Energy · published / observed 2026-01-09
Owner / contractor disclosurefirst partydirectcurrent

Names SB Energy as the builder and operator of OpenAI's 1.2 GW Milam County Stargate site, with initial service beginning in 2026.

Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
217
Milam County community commitmentsSB Energy · published / observed 2026-08-27
Local planning / public recordpublic recordrecordcurrent

Reports more than 1 GW under construction, 10,000 construction jobs and nearly $100 million in county revenue for the Milam campus.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.
218
SB Energy Burlington data center openingsSB Energy · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Official Greenhouse-backed board exposes current Building Engineering Lead and Site Operations Lead roles in Burlington, Texas.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
219
PSG Lordstown data center construction openingsPSG Group · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Official employer postings name a Lordstown hyperscale data center construction campus, but do not disclose the customer or connect the work to Stargate.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
220
Community Engagement Lead — OhioOpenAI · published / observed 2026-08-28
Official ATS / job boardofficial job boarddirectdue soon

Current OpenAI data-center role covers community relationships, workforce, education, incentive compliance and community benefits across Ohio; the posting does not name Lordstown as its sole assignment.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
221
Electrical/Electronic Engineering Technology — Trumbull CampusKent State University · published / observed 2026-08-28
Workforce / training systemeducation workforcesupportingcurrent

Local applied pathway with hands-on labs in circuits, electronics, robotics, automation and industrial controls; no Stargate placement agreement is asserted.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
222
Workforce Solutions of West Central Texas — Haskell and ShackelfordWorkforce Solutions of West Central Texas · published / observed 2026-08-27
Workforce / training systemeducation workforcesupportingcurrent

Official regional workforce board serves Haskell and Shackelford counties and offers employer, labor-market, training and job-seeker services.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
223
Workforce Solutions Panhandle — Hall and Childress countiesWorkforce Solutions Panhandle · published / observed 2026-08-27
Official Texas workforce boardeducation workforcedirectcurrent

Official regional workforce board explicitly includes Hall and Childress counties in its 26-county service area and provides job matching, training, rural access and employer recruiting services.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyOfficial service-area and program source. The separate August 4 event record establishes a Childress-specific recruiting relationship; no Turkey-campus recruiting agreement is yet public.
224
Workforce Solutions of Central Texas — Milam CountyTexas Workforce Commission · published / observed 2026-08-27
Workforce / training systemeducation workforcesupportingcurrent

Official Central Texas workforce system serves Milam County through Rockdale and Cameron offices with recruiting, training and job-seeker services.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
225
TSTC Waco Construction Technologies Center opens to studentsTexas State Technical College · published / observed 2026-02-02
Workforce / training systemeducation workforcesupportingcurrent

Confirms the 120,000-square-foot Waco center is open with Building Construction, Electrical Construction, HVAC, Plumbing and Pipefitting, and Solar Energy programs.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
226
TSTC Waco instrumentation and electrical-controls pathwaysTexas State Technical College · published / observed 2026-01-02
Workforce / training systemeducation workforcesupportingcurrent

Data-center employers describe direct demand for TSTC instrumentation, electrical power, controls, wiring, diagrams and troubleshooting skills; the programs are based at Waco.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
227
Adult Industrial Trade ClassesTrumbull Career & Technical Center · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Year-round adult offerings include industrial electricity, motors and controls, PLCs, instrumentation, piping, rigging, OSHA 10 and customized employer training.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
228
Google Data Centers — IndianaGoogle · published / observed 2026-08-27
Owner / contractor disclosurefirst partydirectcurrent

Current owner page identifies Fort Wayne as operational, Michigan City and Morgan County as developing, and promotes the Indiana STAR skilled-trades pathway.

Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
229
Area Lead, Data Center Operations, Third-Party Data CenterGoogle Careers · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Current multi-location Google operations-lead requisition includes Michigan City and Aurora; the posting does not identify a specific facility assignment.

Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
230
Data Center TechnicianGoogle Careers · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Current official requisition names Michigan City as its sole location and covers server, network and infrastructure deployment and maintenance; the posting does not name a specific campus.

Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
231
Data Center Technician IIIGoogle Careers · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Current official requisition names Michigan City as its sole location and publishes a $105,000–$146,000 base-pay range plus bonus and equity; the posting does not name a specific campus.

Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
232
Technical Operations Manager, Third Party Data CentersGoogle Careers · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Current official exact-city role leads Michigan City colocation electrical, cooling and IT infrastructure; its third-party-data-center scope means it is a local market signal, not proof of assignment to Google's developing owned campus.

Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
233
Michigan City data center logistics openingsDSV · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Current official board exposes a Michigan City Data Center Associate, Data Center Team Lead and Data Center Supervisor at the Royal Road location; DSV does not identify its customer.

Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
234
Ordinance 2025-1 — Morgan County Data Center Project I PUDMorgan County, Indiana · published / observed 2025
Local planning / public recordpublic recordrecordcurrent

Official county ordinance creates the Morgan County Data Center Project I Planned Unit Development District and permits data-center development under its concept plan.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.
235
WorkOne Michigan CityIndiana Department of Workforce Development · published / observed 2026-08-27
Workforce / training systemeducation workforcesupportingcurrent

Official Region 1 register lists the Michigan City WorkOne office and routes residents to local career, training and job-search services.

Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
236
Industrial TechnologyIvy Tech Community College · published / observed 2026-08-27
Workforce / training systemeducation workforcesupportingcurrent

Current program register lists industrial mechanical, interdisciplinary workforce and safety pathways at Michigan City, with data center engineering operations available at Valparaiso and four other Indiana locations.

Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
237
WorkOne Central — Morgan CountyWorkOne Central Indiana · published / observed 2026-08-27
Workforce / training systemeducation workforcesupportingcurrent

Official Region 5 workforce board confirms Morgan County coverage for job-seeker, training and employer services.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
238
HVAC Water Chillers and Cooling TowersIvy Tech Community College · published / observed 2026-08-28
Workforce / training systemeducation workforcesupportingcurrent

Current employer-scheduled training covers chiller and cooling-tower operation, maintenance, controls, water treatment and performance; Ivy Tech identifies a dedicated Morgan County employer consultant.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
239
Fortis Cheyenne-capable construction openingsFortis Construction · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Current official Workday board exposes four multi-location records that include Cheyenne: Project Engineer, Construction Technologist and two electrical preconstruction leadership roles.

Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
240
Hagerman subcontractor prequalificationThe Hagerman Group · published / observed 2026-08-27
Owner / contractor disclosurefirst partydirectcurrent

Official BuildingConnected / TradeTapp route adds qualified trade firms to Hagerman's bidder network for suitable upcoming opportunities; no Google package award is implied.

Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
241
EMCOR trade apprenticeshipsEMCOR Group · published / observed 2026-08-27
Workforce / training systemeducation workforcesupportingcurrent

Official earn-while-you-learn pathway covers electrical, HVAC, building automation, low voltage and other trades used in data-center construction; Fort Wayne availability requires a live local-board check.

Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
242
Google Data Center community hubCity of Fort Wayne · published / observed 2026-08-27
Local planning / public recordpublic recordrecordcurrent

City source reports 1,000 construction jobs, 200 expected permanent roles and names Shambaugh & Son, Hi-Tech Electric, Hagerman Group and Brooks Construction as local project companies.

Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.
243
Google Fort Wayne data center technician openingGoogle Careers · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Current exact-city operations opening for deploying, troubleshooting and maintaining Fort Wayne data center infrastructure.

Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
244
Google Careers — Monrovia data center searchGoogle · published / observed 2026-08-28
Official ATS / job boardofficial job boarddirectdue soon

Official exact-location search and detail pages expose ten current Monrovia roles across site leadership, facilities, controls, electrical, mechanical, maintenance planning, business programs and security.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
245
Google STAR graduates first Indiana cohortIvy Tech Community College · published / observed 2024-09-20
Workforce / training systemeducation workforcesupportingcurrent

Confirms the first paid Fort Wayne STAR cohort and that graduates moved into sponsor-company work at the Google site or other local projects.

Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
246
Hi-Tech Electric Fort Wayne openingsHi-Tech Electric Company · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Current official intake lists a project manager, journeyman electrician and electrical foreman for Fort Wayne and Northeast Indiana.

Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
247
Brooks Construction Fort Wayne laborer openingBrooks Construction Company · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Current official Fort Wayne construction-laborer application; the posting does not identify the Google project.

Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
248
Hello, Cheyenne!Meta Data Centers · published / observed 2024-07-02
Owner / contractor disclosurefirst partydirectcurrent

Announces the 715,000-square-foot campus, more than $800 million investment, 1,000 peak construction workers, about 100 operating jobs and Fortis as builder.

Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
249
Meta Cheyenne CampusFortis Construction · published / observed 2026-08-27
Owner / contractor disclosurefirst partydirectcurrent

Builder portfolio verifies Fortis's Cheyenne delivery role and directs subcontractors to the public plan room.

Reviewed 2026-08-27 · next 2026-10-11 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
250
2025 data center workforce development reviewMeta Data Centers · published / observed 2026-02-01
Workforce / training systemeducation workforcesupportingcurrent

Confirms Meta support for the Laramie County Trades Academy and its industry-led construction, electrical, HVAC, fiber and heavy-equipment pathways.

Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
251
T5 Cheyenne critical-facilities openingsT5 Data Centers · published / observed 2026-08-27
Official ATS / job boardofficial job boarddirectdue soon

Official Lever board exposes two current Cheyenne operations roles; the customer and facility are not identified.

Reviewed 2026-08-27 · next 2026-08-28 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
252
Essential Systems Technician TrainingLaramie County Community College · published / observed 2026-08-19
Workforce / training systemeducation workforcesupportingcurrent

Current Cheyenne pathway for high school seniors and adults covers HVAC, electrical systems, safety and basic facility operations.

Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
253
Cheyenne business and technical programsLaramie County Community College · published / observed 2026-08-27
Workforce / training systemeducation workforcesupportingcurrent

Current program register includes Data Center Technician, Electrical Technology, Industrial Maintenance, networking and cloud administration at the Cheyenne campus.

Reviewed 2026-08-27 · next 2026-09-26 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
254
Project Azalea special exception recordMcDuffie County, Georgia · published / observed 2026-03-17
McDuffie County project registerpublic recordrecordcurrent

County project register documents the special-exception process for parcel 00710034 on Randall Hunt Road and links the official planning, DRI and Board materials. The register is the discovery hub; the linked packet and DRI carry the underlying facts.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyOfficial county index to the filed special-exception and regional-review record; final signed disposition is not posted on the index page.
255
Board of Commissioners agenda packet · Project AzaleaMcDuffie County, Georgia · published / observed 2026-03-17
McDuffie County Board packetpublic recordrecordcurrent

Filed packet identifies parcel 00710034, a 400 MW full-buildout request, City of Thomson water and sewer, no existing sewer or natural gas at the site, $1 billion estimated buildout, 125 estimated full-time jobs and no requested tax abatement at the staff-report date. It reports 30,000 gallons per day of water, which conflicts with the DRI's 0.1 MGD figure and remains unresolved.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyOfficial filed staff report and Planning Commission materials; projections are applicant or regional-review estimates, not audited commitments. Water-demand conflict is retained explicitly.
256
DRI #4602 · Project Azalea final reportCentral Savannah River Area Regional Commission · published / observed 2026-02-13
Georgia DRI review via McDuffie Countypublic recordrecordcurrent

Public regional-impact record reports six buildings totaling 950,000 square feet, a 2029 projected buildout, $1 billion estimated value, 125 estimated full-time jobs and a 400 MW request. It says sufficient power was not then available; Jefferson Energy, Georgia Transmission and Georgia Power were studying upgrades. It reports 0.1 MGD water demand, conflicting with the county packet's 30,000 gallons per day.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyOfficial regional-impact filing. Capacity, timing, investment and employment are filed estimates; utility availability and conflicting water figures remain unresolved.
257
Project Azalea · applicant project pageProject Azalea LLC · published / observed 2026-08-28
Applicant project sitefirst partysupportingcurrent

Applicant-maintained page says the Planning Commission and Board approved the special exception with conditions. Because the county index does not surface signed final minutes or a resolution, the final disposition remains qualified pending retrieval of the official action record.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyDirect applicant statement, useful for status but not a substitute for the signed county disposition.
258
Williams Brothers Development · team and data-center portfolioWilliams Brothers Development · published / observed 2026-08-28
Developer portfolio plus county filing cross-checkfirst partydirectcurrent

Developer site identifies Cameron Grogan as founder and development lead and lists completed or permitting data-center work in Greensboro and Burlington, North Carolina. McDuffie County's filing names Grogan as Project Azalea's representative; the record does not identify the end user.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyCompany identity and portfolio are first-party; the Azalea relationship is established by the county filing naming Cameron Grogan, while ownership and end-user identity remain undisclosed.
259
Jefferson Energy Cooperative · current openingsJefferson Energy Cooperative · published / observed 2026-08-28
Jefferson Energy employment pageofficial job boarddirectdue soon

Official board currently lists Engineering Technician, Facility Maintenance Technician and Facility Worker. The DRI names Jefferson Energy as the planned electric supplier, but none of the requisitions names Project Azalea, parcel 00710034 or a Thomson worksite; all three are regional utility signals only.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh confidence that the openings are live on the employer's board; project attribution is deliberately limited to regional because the postings do not name Azalea.
260
Georgia Transmission · careers and open positionsGeorgia Transmission Corporation · published / observed 2026-08-28
Georgia Transmission careers pageofficial job boarddirectdue soon

Official board exposes engineering, technician, planning, land, relay, substation and project roles at the Tucker headquarters. The DRI names Georgia Transmission only as a participant in ongoing upgrade studies; no Azalea construction award or project-assigned vacancy is asserted.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyLive employer-controlled openings are accurate as observed; the connection to Azalea is limited to the DRI's study-participant statement.
261
Georgia Power · careersGeorgia Power · published / observed 2026-08-28
Georgia Power careers pageofficial job boarddirectcurrent

Official careers route for statewide power and infrastructure work. The DRI says Georgia Power was participating in upgrade studies; it does not establish a delivery package, construction award or project-specific vacancy.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyEmployer-controlled careers route; any Azalea relationship beyond study participation remains unverified.
262
WorkSource CSRA · McDuffie County servicesWorkSource CSRA · published / observed 2026-08-28
Official WIOA workforce systemeducation workforcedirectcurrent

Official regional workforce system explicitly serves McDuffie County with employment services, training support, assessments, job fairs and employer recruitment.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyOfficial service-area and program route; it does not prove a Project Azalea hiring partnership or placement.
263
Advanced Manufacturing and Engineering Technology programsAugusta Technical College · published / observed 2026-08-28
Official college program registereducation workforcedirectcurrent

Current college register lists electrical systems, industrial systems, mechatronics, HVAC, welding and engineering-technology pathways in the Augusta labor market.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyCurrent official program catalog; no exclusive Azalea cohort or placement agreement is claimed.
264
Port Washington Data Center ProposalWisconsin Department of Natural Resources · published / observed 2026-06-12
Owner / contractor disclosurepublic recordrecordcurrent

State environmental register confirms Vantage's 672-acre Lighthouse construction site, wetland and stormwater actions, sewer and water reviews, transmission coordination and permits for 45 emergency generators.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.
265
Vantage Lighthouse Campus · Port WashingtonVantage Data Centers · published / observed 2026-08-28
Owner / contractor disclosurefirst partydirectcurrent

Owner project page reports a $15 billion-plus investment, four data centers, nearly 1 GW and 2.5 million square feet, with 4,000-plus construction jobs, 300-plus Vantage positions and 700 customer positions at completion.

Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
266
Lighthouse local career expo and hiring-partner rosterVantage Data Centers · published / observed 2026-03-30
Owner / contractor disclosurefirst partydirectcurrent

Owner account documents a local-first, union-first career expo attended by more than 200 job seekers and names Oracle, Gurtz Electric, H.J. Martin, Michels, Turner, McCarthy, Weitz and WRTP | BIG STEP as hiring partners.

Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
267
Vantage and Wisconsin Building Trades Council partnershipVantage Data Centers · published / observed 2025-10-30
Owner / contractor disclosurefirst partydirectcurrent

First-party labor pledge commits to local union labor to the fullest extent possible and describes a three-year peak construction window requiring more than 4,000 skilled workers.

Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
268
H.J. Martin · Port Washington openingH.J. Martin and Son · published / observed 2026-08-28
Official ATS / job boardofficial job boarddirectdue soon

Official employer board lists a current Commercial Drywall Carpenter opening in Port Washington; the page does not identify the assigned project.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
269
WRTP | BIG STEP programs and servicesWRTP | BIG STEP · published / observed 2026-08-28
Workforce / training systemeducation workforcesupportingcurrent

Official workforce intermediary publishes apprenticeship-readiness, entry-level construction skills, tutoring and career-navigation routes for Wisconsin residents and employers.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
270
Nine Mile Data conditional-use findings reportDuchesne County · published / observed 2026-04-02
Local planning / public recordpublic recordrecordcurrent

County filing identifies the applicant and developer entities, four parcels totaling 960.32 acres, a roughly 475-acre data-center footprint, a $10 billion estimate, up to 1,000 peak construction workers, 200 long-term employees, adjacent power development and an 18-month substantial-action condition.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.
271
FY26 Electrical Apprenticeship Classroom TrainingUintah Basin Technical College · published / observed 2025-09-01
Workforce / training systemeducation workforcesupportingcurrent

Current college catalog documents a Roosevelt-based 720-hour electrical apprenticeship classroom pathway delivered with employer-provided on-the-job training.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
272
Utah Department of Workforce ServicesState of Utah · published / observed 2026-08-28
Workforce / training systemeducation workforcesupportingcurrent

Official statewide job, employer-recruiting, apprenticeship and workforce-services route, including an Eastern Utah service network. It does not imply a Nine Mile Data placement.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
273
DC BLOX Nashville Data CenterDC BLOX · published / observed 2026-08-28
Owner / contractor disclosurefirst partydirectcurrent

Developer project page identifies the Grassmere Business Park site, a 69,200-square-foot 10 MW first-phase building, a $380 million-plus estimate, hundreds of peak construction workers, local-union intent and an evaluation-stage status.

Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
274
BL2026-1391 · Nashville data-center zoning standardsMetropolitan Government of Nashville and Davidson County · published / observed 2026-07-31
Local planning / public recordpublic recordrecordcurrent

Passed city record creates small, medium, large and campus classifications and adds siting, cooling, generator, noise and annual-compliance requirements. It is a policy record, not proof that Grassmere is approved.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.
275
BL2026-1489 · 648 Grassmere Park acquisition authorityMetropolitan Government of Nashville and Davidson County · published / observed 2026-08-07
Local planning / public recordpublic recordrecordcurrent

Passed and mayor-approved ordinance authorizes Metro to acquire the 23.49-acre project parcel through negotiation or condemnation; authorization does not establish that an acquisition has occurred.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.
276
DCB Nashville, LLC v. Metropolitan Government · case 3:26-cv-01143U.S. District Court docket mirror via Justia · published / observed 2026-08-12
Court / administrative appealpublic recordsupportingcurrent

Third-party docket mirror records the August 11 federal complaint and a November 16 initial case-management conference. Later filings must be rechecked against PACER or the court docket.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyQualified docket metadata from a third-party mirror; recheck the official court system for later filings and outcomes.
277
DC BLOX official open positionsDC BLOX / Ashby · published / observed 2026-08-28
Official ATS / job boardofficial job boarddirectdue soon

Official Ashby feed exposes five current corporate openings, all at the Atlanta office; no Nashville, Birmingham or Huntsville requisition is normalized in this evidence cut.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the posting at observation time; availability can change without notice.
278
Electrical Engineering TechnologyNashville State Community College · published / observed 2026-08-28
Workforce / training systemeducation workforcesupportingcurrent

Current two-year Nashville program covers electrical systems, industrial automation, PLCs, controls, motors, generators, power distribution and troubleshooting.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
279
Nashville skilled-trades and industrial programsTennessee College of Applied Technology Nashville · published / observed 2026-08-28
Workforce / training systemeducation workforcesupportingcurrent

Current program register includes HVAC/R, industrial maintenance and mechatronics, commercial and industrial electricity, construction, networking and cybersecurity, and welding pathways.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
280
Birmingham Community Outreach · planned expansionsDC BLOX · published / observed 2026-08-28
Owner / contractor disclosurefirst partydirectcurrent

Owner project page separates a contracted 5 MW, 36,500-square-foot expansion scheduled for Q2 2026 through Q4 2027 from a larger 60 MW, 263,000-square-foot adjacent concept that remains under evaluation.

Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
281
Birmingham Data CenterDC BLOX · published / observed 2026-08-28
Owner / contractor disclosurefirst partydirectcurrent

Owner facility page identifies the operating campus at 433 6th Street South, its 2019 opening, initial 31,000-square-foot facility, Tier III certification, current colocation service and expansion-ready power and acreage claims.

Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
282
City of Birmingham Online Permit CenterCity of Birmingham · published / observed 2026-08-28
Local planning / public recordpublic recordrecordcurrent

Official city route for tracking permit applications, review steps, fees, documents and inspections. A project-specific expansion permit number was not exposed in this review and must be resolved through the address search or a public-records request.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.
283
Data Centers in Birmingham · current zoning protectionsCity of Birmingham · published / observed 2026-06-09
Local planning / public recordpublic recordrecordcurrent

Official city register documents 20 current hyperscale-data-center conditions covering separation, load and phasing disclosure, water and closed-loop cooling, utilities, noise, backup power, site plans and neighbor notification. Application to a specific expansion still requires permit-level confirmation.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.
284
Electrical · Industrial Training AcademyJefferson State Community College · published / observed 2026-08-28
Workforce / training systemeducation workforcesupportingcurrent

Current Birmingham workforce course covers safety, electrical theory, NEC, raceways, test equipment, conductors and construction documents; the college describes it as grant-funded with ongoing enrollment but publishes no DC BLOX placement agreement.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
285
Industrial ElectronicsLawson State Community College · published / observed 2026-08-28
Workforce / training systemeducation workforcesupportingcurrent

Current Bessemer program offers short-certificate, certificate and AAS routes covering industrial equipment, motors, motor controls, PLCs, maintenance and troubleshooting; no DC BLOX placement agreement is disclosed.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
286
AlabamaWorks employment serviceAlabama Department of Workforce · published / observed 2026-08-28
Workforce / training systemeducation workforcesupportingcurrent

State employment-service page identifies AlabamaWorks as the statewide 24/7 job-matching and employer-recruiting system. Individual employer, worksite and project relationships still require verification.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
287
Huntsville Data CenterDC BLOX · published / observed 2026-08-28
Owner / contractor disclosurefirst partydirectcurrent

Owner facility page identifies the operating Tier III colocation site at 333 Diamond Drive NW, a 9,000-square-foot initial facility expandable to 52,400 square feet and up to 13.5 MW, and a Huntsville portfolio count of two facilities operational or in development.

Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
288
DC BLOX to develop four Southeastern hyperscale edge nodesDC BLOX · published / observed 2024-11-14
Owner / contractor disclosurefirst partydirectcurrent

Owner announcement identifies a new Huntsville site designed to provide 5 MW to a hyperscale client. It does not disclose the parcel, construction team, delivery date or whether later 333 Diamond Drive permits serve that node.

Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
289
333 Diamond Drive NW · issued building permitsCity of Huntsville · published / observed 2026-08-28
Local planning / public recordpublic recordrecordcurrent

Official address query returns permit 654979 for $24.0377 million of commercial new construction issued October 16, 2024 and permit 689774 for $18.71382 million of industrial alteration issued April 30, 2026. The layer does not name the contractor or detailed scope, so neither permit is assigned to the separate 5 MW node without further records.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.
290
Electrical Technology and MechatronicsDrake State Community & Technical College · published / observed 2026-08-28
Workforce / training systemeducation workforcesupportingcurrent

Current Huntsville pathways cover industrial wiring, transformers, NEC, motor controls, PLCs, drives, automation, robotics and preventive maintenance; degree, certificate and short-certificate options are published without a DC BLOX placement agreement.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
291
Heating & Air ConditioningDrake State Community & Technical College · published / observed 2026-08-28
Workforce / training systemeducation workforcesupportingcurrent

Current Huntsville HVAC pathway offers an AAS, certificate and short certificate and publishes HVAC Excellence accreditation; intake and seat counts require college confirmation and no DC BLOX placement agreement is disclosed.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
292
2025 Hyperscale Data Center Campuses · Montgomery MGM1DC BLOX · published / observed 2025-01-01
Owner / contractor disclosurefirst partydirectcurrent

Owner campus sheet places MGM1 at 7610 Bill Joseph Parkway in Hope Hull and describes an 18-acre, one-building, 113,000-square-foot planning-stage campus. Its diagram shows an initial 5 MW building and future halls; later delivery still requires permit evidence.

Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
293
Construction Permits · public feature layerCity of Montgomery GIS · published / observed 2026-08-28
Municipal building permit systempublic recordrecordcurrent

Authoritative city layer exposes permit number, issue and completion dates, status, work description, declared cost, owner, contractor, contractor address, job description, physical address and parcel. Permit issuance records authorization and declared scope; it does not prove final cost, completion or operation.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for city-recorded permit fields. Contractor identity is resolved separately when the permit lists only a person and address; issued status is not completion.
294
7610 Bill Joseph Parkway · DC BLOX permit setCity of Montgomery GIS · published / observed 2026-08-28
Municipal building permit systempublic recordrecordcurrent

City records show grading and NPDES work, a $23 million 37,066-square-foot data-center building permit, underground medium-voltage and telecom, temporary power, building electrical installation and 2026 DC BLOX signage. Most records remain issued rather than completed, so Gridwork classifies the site as active fit-out—not operating.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for the six cited permit records and declared scopes. Valuation is permit-reported, contractor names may be individual license holders, and issued status does not prove completion.
295
Burr Computer Environments · company and careers profileBurr Computer Environments · published / observed 2026-08-28
Permit contact / entity resolutionreported secondarysupportingcurrent

Company profile identifies BCEI as a Houston data-center design/build engineering firm and publishes careers@bcei.com. The MGM1 building permit names Jeremy Dreiling at BCEI's 10400 Rodgers Road address; Gridwork treats the firm match as strong entity resolution while keeping the project role qualified because the permit names the license holder, not the company.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyExact permit name-and-address resolution is strong, but the public permit does not print BCEI's company name. Recheck the contractor-of-record field or owner disclosure before treating BCEI as an unqualified general-contractor award.
296
Luca Electric · leadership and careersLuca Electric · published / observed 2026-08-28
Permit contact / contractor sitefirst partydirectcurrent

Official company site identifies Jeff Luca as president and publishes the same Powder Springs headquarters carried by MGM1 temporary-power and building-electrical permits. This resolves Luca Electric as an active electrical contractor at the site; the public permits do not disclose crew count or package value.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for company identity through exact name and address matching to city permits; scope and status remain limited to the cited permit descriptions.
297
Planning Commission · DC BLOX and CLOP development-plan hearingsCity of Montgomery · published / observed 2025-02-27
Local planning / public recordpublic recordrecordcurrent

City agenda separately identifies DP-2025-004 for DCB Montgomery LLC / DC BLOX at Bill Joseph Parkway and DP-2025-006 for CLOP Montgomery AL LLC on Perimeter Parkway. The agenda proves two filings and hearings, not either disposition or construction start.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.
298
Board of Adjustment · CLOP project-substation exceptionCity of Montgomery · published / observed 2025-02-20
Utility / interconnection docketpublic recordrecordcurrent

Official agenda records CLOP Montgomery AL LLC's request for a special exception to build an electrical substation on the Perimeter Parkway project parcel. Agenda placement proves the application and hearing, not final approval, energization or data-center construction.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.
299
6220 Perimeter Parkway · CLOP / Oppidan permit setCity of Montgomery GIS · published / observed 2026-08-28
Municipal building permit systempublic recordrecordcurrent

Issued city records cover grading, a $30.585 million 61,544-square-foot building, a 5 MW Phase 1 electrical package, plumbing, temporary job-trailer power and 2026 cooling/mechanical work. The records name CLOP Montgomery AL LLC, call the temporary-power job Oppidan Data Center and identify permit contacts for Caddell, Wayne J. Griffin Electric, AL-CLY Plumbing and Hardy.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for the six cited permit records, declared value, size and 5 MW Phase 1 scope. Permit issuance is not completion; the tenant and total build-out remain undisclosed.
300
Caddell Construction · Montgomery careersCaddell Construction · published / observed 2026-08-28
Permit contact / official employer boardofficial job boarddirectcurrent

Official company page publishes Caddell's 445 Dexter Avenue, Suite 11000 headquarters—the exact address on the CLOP building permit—and routes applicants to current openings. The address match resolves the permit contact to Caddell; it does not disclose a project-specific requisition or subcontract package.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for entity resolution and the current Caddell intake route. A role is not CLOP-specific unless its posting names Montgomery, Oppidan, CLOP or the Perimeter Parkway worksite.
301
Wayne J. Griffin Electric · Alabama openings and apprenticeshipWayne J. Griffin Electric · published / observed 2026-08-28
Permit contact / official employer boardofficial job boarddirectcurrent

Official board lists current Alabama apprentice, electrician, foreperson and project-engineer intake plus a debt-free NCCER apprenticeship. The permit's Mike Irby contact and 296 Cahaba Valley Parkway address resolve to Griffin's Pelham office; no posting names the CLOP project.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for current statewide Alabama intake and company identity. Openings are regional signals until employer confirmation ties a worker to 6220 Perimeter Parkway.
302
AL-CLY Plumbing · apprentice and journeyman intakeAL-CLY Plumbing · published / observed 2026-08-28
Permit contact / official employer boardofficial job boarddirectcurrent

Official employer page lists apprentice, journeyman and gas-fitter opportunities. Founder Albert Lee Hagler and the Alton address resolve the plumbing permit contact to AL-CLY; the hiring page is statewide and does not assign applicants to the Oppidan site.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the live company intake and permit entity match. Treat all three openings as regional until the employer confirms a project assignment.
303
Hardy Corporation · mechanical careersHardy Corporation · published / observed 2026-08-28
Permit contact / official employer boardofficial job boarddirectcurrent

Official employer page publishes current openings and a general application at 350 Industrial Drive. The CLOP mechanical permit explicitly says the cooling systems are furnished and installed by Hardy and names a contractor at that exact address.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for Hardy's named mechanical scope and official application route. Individual openings and crew assignments can change without notice.
304
Hello, MontgomeryMeta Data Centers · published / observed 2024-05-02
Owner / contractor disclosurefirst partydirectcurrent

Meta's original announcement identifies a company-owned and operated 715,000-square-foot campus, more than $800 million of investment, roughly 100 operations jobs and more than 1,000 peak construction workers. It directs construction inquiries to Hensel Phelps.

Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
305
Montgomery, we're growingMeta Data Centers · published / observed 2025-09-23
Owner / contractor disclosurefirst partydirectcurrent

Meta adds two buildings and updates the campus to nearly 1.3 million square feet and more than $1.5 billion, with more than 1,000 skilled tradespeople at peak and more than 100 future operations jobs. The disclosure does not provide IT MW.

Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
306
Meta awards Hensel Phelps Montgomery Data CenterHensel Phelps · published / observed 2024-05-02
Owner / contractor disclosurefirst partydirectcurrent

The contractor directly confirms Meta awarded Hensel Phelps the Montgomery campus, repeats the original 715,000-square-foot and $800 million-plus scope and states an expected end-2026 completion. Meta's later expansion and city permits supersede the original size while the contractor relationship remains current evidence.

Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
307
1055 Hyundai Boulevard · Meta multi-building permit setCity of Montgomery GIS · published / observed 2026-08-28
Municipal building permit systempublic recordrecordcurrent

City records show 2024 grading; DCB1 and DCB2 building and electrical work; renewed 2025 permits; two $330 million, 144,000-square-foot expansion buildings; 2026 erection, mechanical and electrical packages; and continuing grading through August 2026. The mixed building and MEP activity supports a multi-building construction classification, not an operating-status claim.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for city-recorded permit fields and named license contacts. Declared valuations are not audited spend, individual permits may be revisions, and active construction does not establish turnover or operation.
308
Plateau Excavation · mission-critical sitework and careersPlateau Excavation · published / observed 2026-08-28
Permit contact / official employer boardofficial job boarddirectcurrent

Plateau publishes mission-critical sitework capability, an active field-career intake and its 375 Lee Industrial Boulevard shop. Its staff page identifies Sean Whitaker as a senior project manager; the same name and address appear on Meta's 2024 grading permit.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for entity resolution and the official careers route. The permit establishes the grading contact; it does not disclose Plateau's full subcontract value or present crew size.
309
Marathon Electrical · careers and apprenticeshipMarathon Electrical Contractors · published / observed 2026-08-28
Permit contact / official employer boardofficial job boarddirectcurrent

Official site publishes electrical project-manager, journeyman and low-voltage career paths, a registered NCCER apprenticeship and the 2830 Commerce Boulevard office. That exact address and Marathon project manager Jamie Stephens appear on Meta electrical permits.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for entity resolution and current career routes. The city permits establish electrical work, but individual postings remain regional unless they identify the Meta Montgomery site.
310
Clayco Compute · mission-critical delivery and careersClayco · published / observed 2026-08-28
Permit contact / contractor portfoliofirst partydirectcurrent

Clayco's official mission-critical page publishes its 8640 Evans Avenue headquarters and career, subcontractor and vendor routes. Meta's 2025-26 expansion permits name Matthew Drobak at that exact address, resolving Clayco as the expansion-building contractor while the page does not name the confidential client.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for exact permit-to-company address resolution and active mission-critical capability; the contractor page itself does not name Meta Montgomery, so scope stays bounded to the cited permits.
311
RJ Mechanical · employment statusRJ Mechanical · published / observed 2026-08-28
Permit contact / official employer boardofficial job boarddirectcurrent

Official site confirms the 3153 Bellwood Drive company address and HVAC, plumbing and piping capability. Meta's 2026 mechanical permit names Joseph D. Martin at that exact address. RJ currently says it is not accepting applications, so Gridwork exposes the contractor relationship without an active-opening count.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for exact company resolution and the no-current-intake status observed on August 28, 2026. Recheck weekly because employment status can change.
312
Connect Data Centers · Montgomery project listingBaxtel · published / observed 2026-08-28
Industry project registerreported secondarysupportingcurrent

Industry directory reports a planned single-story 61,554-square-foot Montgomery data center attributed to Oppidan / Connect. The city filings establish the project parcel and entity, but the reported area still requires a building permit or owner project page before it is treated as filed scope.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyQualified directory record; reconcile the building area, end user, capacity and status against the city permit file or a named owner disclosure.
313
Oppidan · development and mission-critical staff rosterOppidan Investment Company · published / observed 2026-08-28
Owner / contractor disclosurefirst partydirectcurrent

Official company roster identifies Dylan Rusk as an Oppidan developer and names dedicated data-center development, preconstruction, construction and operations staff. Combined with Montgomery's agenda naming Rusk as the CLOP presenter, this resolves Oppidan's project relationship but not the undisclosed tenant.

Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
314
Planning Commission · DCB Plat No. 1 final-plat requestCity of Montgomery · published / observed 2024-03-28
Local planning / public recordpublic recordrecordcurrent

City agenda records a final-plat approval request at Bill Joseph Parkway and Wasden Road. A meeting-calendar entry is not treated as proof that the plat was approved.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.
315
Electrical TechnologyTrenholm State Community College · published / observed 2026-08-28
Workforce / training systemeducation workforcesupportingcurrent

Current Montgomery pathway covers electrical principles, National Electrical Code, residential and commercial wiring, controls, transformers and PLC applications; no DC BLOX placement agreement is disclosed.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
316
Montgomery Regional Workforce Training CenterAlabama Industrial Development Training · published / observed 2026-08-28
Workforce / training systemeducation workforcesupportingcurrent

AIDT lists the Montgomery Regional Workforce Training Center as a local route for entry-level, upskilling, two-year-college and K-12 workforce training. Current data-center-specific cohorts and seats are not published.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
317
Atlanta East Hyperscale Data Center CampusDC BLOX · published / observed 2026-08-28
Local planning / public recordpublic recordrecordcurrent

Current owner page confirms groundbreak and site preparation beginning in September 2024 at 1726 Farmer Road, shows dated construction images through October 2025 and markets four data centers totaling 747,787 square feet and 154 critical MW. This current configuration is narrower than the county's seven-building approved-campus description.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.
318
ATL2-A Data Center · design-build project recordEvans General Contractors · published / observed 2026-08-28
Owner / contractor disclosurefirst partydirectcurrent

The contractor's project page directly identifies Evans as DC BLOX's design-build contractor in Conyers and describes ATL2-A as a single-tenant building with 2 MW fitted on day one, an 8 MW cold-dark shell, N+1 electrical and cooling, a lift station and an offsite sanitary force main. It documents the first building, not every future campus package.

Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
319
Evans selected for DC BLOX ATL1 and ATL2Evans General Contractors · published / observed 2024-01-29
Owner / contractor disclosurefirst partydirectcurrent

Evans identifies its Advanced Technology team as design-build lead for DC BLOX's Conyers campus and records its early master-planning, entitlement, design, permitting and procurement role. The announcement does not identify lower-tier trade awards or current vacancies.

Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
320
Atlanta East Building 1 completionDC BLOX · published / observed 2026-03-17
Owner milestone disclosurefirst partydirectcurrent

Owner-published completion update says Building 1 at Atlanta East was completed and celebrated with Evans and the Conyers–Rockdale community. It supports physical completion of the first structure, but does not by itself establish tenant acceptance, production operation or the status of later campus buildings.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the owner's stated Building 1 completion milestone. Commissioning, tenant acceptance and live IT load still require separate evidence.
321
Issued air permit 7374-247-0076-B-01-0 · Atlanta EastGeorgia Environmental Protection Division · published / observed 2025-02-26
State issued-air-permit indexpublic recordrecordcurrent

Georgia's issued-permit index records the final SIP permit on February 26, 2025. The linked narrative covers six Caterpillar 3516E emergency generators staged across 2025–2028, says construction began in October 2024 and anticipates final installation and operation in November 2028. Emergency-generator nameplate is not critical IT load.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for permit number, issuance date, regulated equipment and the applicant's installation schedule. An air permit does not establish building occupancy or IT operation.
322
ATL2 stream-buffer variance approval · BV-122-25-02Georgia Environmental Protection Division · published / observed 2025-06-20
State watershed approvalpublic recordrecordcurrent

EPD granted ATL2's State-waters buffer variance subject to erosion controls, Rockdale land-disturbance conditions and prior USACE Section 404 authorization. The approval governs specified buffer impacts; it is not a blanket construction or occupancy permit.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the granted variance and its conditions. Compliance and separate federal/local authorizations must be tracked independently.
323
DRI 4120 · DC BLOX ATL East final regional reviewAtlanta Regional Commission · published / observed 2024-05-31
Regional development reviewpublic recordrecordcurrent

The final regional review records a 68.41-acre ATL2 plan at 1726 and 1830 Farmer Road with three two-story buildings totaling 1,016,828 square feet, a substation and 30/80/40 MW building labels. Those planning labels are not audited critical-load commitments and differ from the owner's later four-building configuration.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyHigh for the filed 2024 plan and review comments. The plan is a historical design state and must not override newer owner or permit records without reconciliation.
324
ATL2-A East · geotechnical and code-compliance recordUES · published / observed 2026-08-28
Consultant project portfoliofirst partydirectcurrent

UES directly identifies DC BLOX as its client and documents geotechnical evaluation, slab/subgrade recommendations, tilt-wall and foundation inspections, civil-improvement inspection and code-compliance oversight for the 10 MW first phase. Its 85,000-square-foot area differs from Evans' 78,000-square-foot completion post and is retained as a source discrepancy.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for UES's own scope and client relationship. Area and phase labels require reconciliation with owner, contractor and permit records.
325
ATL2-A project team · tilt-up profileTilt-Up Concrete Association · published / observed 2026-08-28
Industry-association project registerreported secondarysupportingcurrent

Industry-association project profile identifies Evans as general contractor and Martin Concrete Construction as concrete contractor and supplier for the 77,000-square-foot, 55-panel ATL2-A structure. The profile is useful project-team evidence but remains a member-submitted association record rather than a county permit.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyQualified team roster from a recognized industry association. Reconfirm Martin's package against an owner, contractor or permit disclosure when available.
326
Martin Concrete · careers and internshipsMartin Concrete Construction · published / observed 2026-08-28
Contractor careers pageofficial job boarddirectcurrent

Official contractor route covers company openings and field, project-management, estimating and safety internships. No current listing in this evidence cut names ATL2-A or Conyers.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the official intake route. Any project assignment requires employer confirmation.
327
UES · official careersUES · published / observed 2026-08-28
Consultant ATSofficial job boarddirectcurrent

Official national board for engineering, materials testing, inspection and technician roles. Georgia openings are regional signals and are not assigned to ATL2-A without a named worksite or employer confirmation.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for live postings at observation time; project assignment and availability can change without notice.
328
ATL3 Pippin · Section 401 water-quality certification noticeGeorgia Environmental Protection Division · published / observed 2025-11-18
State water-quality public noticepublic recordrecordcurrent

State notice and Terracon's attached request identify a separate 52.84-acre, nine-parcel ATL03/Pippin site west of Farmer and Lester Roads with three buildings, a substation, five ponds and associated roads and parking. The applicant estimated regulated construction for October 2026 after 401/404 authorization; the notice is an application record, not approval or evidence that work began.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed scope, parcels, consultants and applicant schedule. Authorization, land control, local permits and actual mobilization remain unresolved.
329
Terracon · Georgia openingsTerracon · published / observed 2026-08-28
Consultant ATSofficial job boarddirectcurrent

Official Georgia board includes environmental, NPDES, geotechnical, inspection and materials-testing roles. No posting in this cut names ATL2, ATL3 Pippin or DC BLOX, so the route is regional only.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for live Georgia postings at observation time; exact project assignment is unverified.
330
Thomas & Hutton · official openingsThomas & Hutton · published / observed 2026-08-28
Consultant ATSofficial job boarddirectcurrent

Official board covers civil/site, water-resources, field and design roles across the firm's footprint. The ATL3 plan establishes project work, but no current posting is assigned to the Pippin site.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for current official openings; exact DC BLOX assignment requires employer confirmation.
331
VAR2024-33 · Atlanta East parking variance staff reportRockdale County Planning & Development · published / observed 2025-02-03
Local planning / public recordpublic recordrecordcurrent

Official staff report identifies DC BLOX Atlanta East LLC as applicant and owner for 1726 and 1830 Farmer Road, records a 68.41-acre undeveloped site and recommends denial of a parking-location variance. The staff recommendation is not treated as the Board of Adjustments' final disposition.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.
332
Air-permit advisory · DCB Atlanta East application 29442Georgia Environmental Protection Division · published / observed 2024-10-01
Environmental permit / docketpublic recordrecordcurrent

State air-permit advisory records DCB Atlanta East LLC's application to construct a new data center at 1726 Farmer Road. An application under review is not proof of permit issuance or construction completion.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.
333
Air-permit advisory · 97 emergency generatorsGeorgia Environmental Protection Division · published / observed 2025-11-01
Environmental permit / docketpublic recordrecordcurrent

State advisory records application 29932 for construction and operation of 97 diesel-fired emergency generators rated at 3 MW each at the Atlanta East address. Generator nameplate is emergency equipment capacity and must not be represented as critical IT load; issuance remains unresolved in this evidence cut.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.
334
Planning Commission agenda · DC BLOX Farmer Road applicationsRockdale County · published / observed 2023-09-14
Local planning / public recordpublic recordrecordcurrent

County agenda identifies DC BLOX as applicant for 71.5 acres at 1726 and 1830 Farmer Road, with land-use, rezoning and substation special-use requests. Agenda placement is evidence of application, not disposition.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.
335
Ordinance 40-2023-20 · FLU Case 2023-03Rockdale County · published / observed 2023-09-26
Local planning / public recordpublic recordrecordcurrent

Adopted ordinance redesignates 1726 and 1830 Farmer Road from Medium Density Residential to Office Institutional / Technology Park for a DC BLOX data center.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.
336
Rockdale County 2026 Budget BookRockdale County · published / observed 2026-04-01
Local planning / public recordpublic recordrecordcurrent

County budget identifies a $250 million Phase 1 data center by DC BLOX as recent economic activity. The figure is a county-reported phase estimate, not an audited spend-to-date value.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.
337
Rockdale County Data Center Fact SheetRockdale County · published / observed 2026-05-12
Local planning / public recordpublic recordrecordcurrent

County fact sheet says the approved DC BLOX Farmer Road campus has seven planned buildings, its first phase is being built, and the completed site is expected to support 50–60 staff. It also records the 2026 county moratorium; the seven-building approval and current owner-marketed four-building configuration must be reconciled on refresh.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.
338
Industrial Systems TechnologyGeorgia Piedmont Technical College · published / observed 2026-08-28
Workforce / training systemeducation workforcesupportingcurrent

Current regional program covers industrial wiring, motors, controls, PLCs, instrumentation, electronics, mechanical systems, pumps and piping. It is a skills pathway, not a DC BLOX placement guarantee.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
339
WorkSource Atlanta Regional · Rockdale Career Resource CenterAtlanta Regional Commission · published / observed 2026-08-28
Workforce / training systemeducation workforcesupportingcurrent

Official regional register lists the Conyers career center and job-seeker, training-provider, recruitment and employer upskilling services. Individual results require employer and worksite verification.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
340
Atlanta West Hyperscale Data Center CampusDC BLOX · published / observed 2026-08-20
Owner campus registerfirst partydirectcurrent

Current owner page locates Atlanta West at 1701 North River Road and markets three data centers across 100 acres, 1.37 million square feet and 200 critical MW, with one remaining 498,000-square-foot, 80 MW building. Its 'operational & in development' label is campus-wide and does not enumerate each building's acceptance or live IT load.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for the owner's current marketed campus configuration, address and coordinates. Aggregate operating/development language does not prove each building is live, and current scope must be reconciled with the two-building air permit and older 55-acre plan.
341
DC BLOX acquires 55 acres and commences Atlanta West constructionDC BLOX · published / observed 2023-10-31
Owner development announcementfirst partydirectcurrent

Original owner announcement records a 55-acre, 750,000-square-foot, twelve-data-hall plan, more than $1.2 billion in expected capital investment, 180 MW of committed gross power and Evans as design-builder with DLB Associates, Corgan, Thomas & Hutton and Bennett & Pless. It is a historical scope, not the current 100-acre campus state.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyHigh for the original 2023 plan and named design team. The Q3 2025 customer-move-in target and original dimensions require later milestone corroboration and are superseded where the current owner register differs.
342
$1.15 billion green loan for Douglas County campus developmentDC BLOX · published / observed 2025-08-11
Owner financing disclosurefirst partydirectcurrent

Owner financing release says the loan supports a 120 MW Douglas County data center plus 80 MW of expansion capacity available as early as 2027. Financing capacity is not spend-to-date, and the release does not establish building turnover.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the closed financing amount and stated financed capacity. Do not treat loan proceeds as audited construction spend or the 2027 availability target as completion evidence.
343
Retaining-wall permit J24-0213 · Atlanta WestCity of Douglasville Building Division · published / observed 2024-04-25
City monthly building-permit registerpublic recordrecordcurrent

City register records a $373,377 retaining-wall permit at 1701 North River Road with Reinforced Wall Systems LLC as applicant. The declared package value is not total campus investment, and issuance does not establish completion or current crew demand.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for permit number, issue date, exact address, applicant and declared value. Closeout, subcontract tier and current staffing require separate evidence.
344
Electrical permit J25-0087 · Atlanta WestCity of Douglasville Building Division · published / observed 2025-07-25
City monthly electrical-permit registerpublic recordrecordcurrent

City register records a $9,821,480 electrical permit at 1701 North River Road with Cleveland Electric Company. This exact-address record verifies the contractor relationship; it does not prove the employer's current Lithia Springs opening is assigned to Atlanta West.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for permit number, issue date, exact address, contractor and declared value. The permit does not disclose crew size, package completion, building assignment or requisition assignment.
345
New-construction permit J24-0499 · Atlanta WestCity of Douglasville Building Division · published / observed 2025-10-07
City monthly building-permit registerpublic recordrecordcurrent

City register records Evans General Contractors on a 499,444-square-foot commercial new-construction permit at 1701 North River Road. The register reports a zero-dollar declared value, so Gridwork uses the floor area and contractor but does not infer package cost.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for permit number, issue date, exact address, contractor and permitted area. The zero-dollar field is retained as reported and is not evidence that the work had no cost.
346
New-construction permit J25-0622 · Atlanta WestCity of Douglasville Building Division · published / observed 2026-01-09
City monthly building-permit registerpublic recordrecordcurrent

City register records Evans General Contractors on a separate 128,000-square-foot commercial new-construction permit at 1701 North River Road with a $100 million declared value. The relationship between this package and the 499,444-square-foot permit remains unresolved.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for permit number, issue date, exact address, contractor, permitted area and declared value. Do not combine floor areas or values into a campus total until package and building overlap is reconciled.
347
Reinforced Wall Systems · retaining-wall contractorReinforced Wall Systems · published / observed 2026-08-28
Permit-contractor company sitefirst partydirectcurrent

Official company site describes an Alpharetta-based retaining-wall contractor specializing in MSE, cast-in-place and culvert systems with in-house crews. It exposes company contact but no public requisition board or Atlanta West staffing count.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for company identity and capabilities. The city permit, not the marketing site, establishes the exact Atlanta West relationship; current hiring remains unverified.
348
Issued air permit 7374-097-0102-S-01-0 · Atlanta WestGeorgia Environmental Protection Division · published / observed 2026-01-28
State issued-air-permit indexpublic recordrecordcurrent

Issued-permit index and narrative cover a two-building data center at 1701 North River Road with 76 emergency generators: 60 rated 3.0 MW and 16 rated 2.5 MW. The narrative records January 2024 site work, corrects building construction from 2027 to 2025 in its addendum and schedules generator installation from November 2025 through August 2027. Generator nameplate is not critical IT load.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the issued permit, regulated equipment, fuel limit and applicant schedule. Installation dates are planned dates in the permit record, and an air permit does not establish actual commissioning, occupancy or live customer load.
349
DCB Atlanta West amended tax-incentive and bond recordDouglas County Board of Assessors · published / observed 2024-10-29
County incentive / bond minutespublic recordrecordcurrent

County minutes record DC BLOX assigning project rights to wholly owned DCB Atlanta West LLC, a 0.4-acre public cul-de-sac conveyance and unanimous acknowledgement of amended bond and tax-incentive documents. The minutes do not disclose construction completion or a current building count.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyHigh for the entity assignment and board action recorded in adopted minutes. The underlying incentive schedules and final bond exhibits should be refreshed if the county publishes them separately.
350
DCB Atlanta West construction-loan resolutionDevelopment Authority of the City of Douglasville · published / observed 2025-09-11
Local development-authority minutespublic recordrecordcurrent

Authority minutes approve security and estoppel documents requested by DCB Atlanta West for a construction loan under the DC BLOX Project Series 2023-A bond transaction. The action corroborates active financing, not an amount funded or a delivery milestone.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the recorded resolution. Recheck later authority minutes for amendments, releases or project updates; financing authorization is not proof of construction completion.
351
DC BLOX West medium-voltage installationState Electric Supply · published / observed 2026-06-01
Supplier project case studyfirst partydirectcurrent

Supplier case study directly identifies The Outside Line Company as the DC BLOX West medium-voltage subcontractor and State Electric as material supplier. It records a seven-person crew completing 260 terminations across metering, distribution and 26 transformer cabinets over three weeks, followed by a zero-comment client QA/QC inspection.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the firms' own completed package, crew size and equipment count. The case study does not identify a general electrical contractor, contract value, building number or current onsite headcount.
352
Safety Manager · Day Shift Lithia SpringsCleveland Electric Company · published / observed 2026-08-25
Contractor ATS / secondary-title reconciliationofficial job boarddirectcurrent

Official UKG posting remains open for a full-time Safety Manager working in Lithia Springs and requiring industrial-construction experience, OSHA 30 and OSHA 510. The official title does not name DC BLOX; third-party job indexes add a DC BLOX West label, so Gridwork retains the opening as a qualified market-level signal rather than a direct project match.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · qualified accuracyHigh for employer, live status, role and Lithia Springs work location. Project assignment remains unverified because the official posting does not name DC BLOX or 1701 North River Road.
353
DLB Associates · official careersDLB Associates · published / observed 2026-08-28
Design partner careers pageofficial job boarddirectcurrent

Official engineering career route for the Atlanta West design partner. Current openings are national or office-based and must not be presented as campus assignments without employer confirmation.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the official intake route and live employer openings; exact Atlanta West assignment is unverified.
354
Corgan · official careersCorgan · published / observed 2026-08-28
Design partner careers pageofficial job boarddirectcurrent

Official architecture and design board for the Atlanta West design partner, including Atlanta and data-center practices. No current requisition in this evidence cut is assigned to DC BLOX West.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the official hiring route; project assignment requires employer confirmation.
355
Bennett & Pless · official careersBennett & Pless · published / observed 2026-08-28
Design partner careers pageofficial job boarddirectcurrent

Official structural-engineering board for the Atlanta West design partner with Atlanta, BIM and engineering routes. Current openings remain regional unless the employer names the campus.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the official hiring route; exact DC BLOX assignment is unverified.
356
Microsoft Datacenter Academy · DouglasvilleWest Georgia Technical College · published / observed 2026-05-20
Technical-college program announcementeducation workforcesupportingcurrent

WGTC opened a hands-on datacenter training lab at its Douglasville campus with Microsoft support, mentorship and IT career pathways. It is a strong regional talent route but no DC BLOX placement agreement is disclosed.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the academy, location and Microsoft partnership. Employer placement, cohort capacity and DC BLOX hiring linkage remain unverified.
357
WorkSource Atlanta Regional · Douglas Career Resource CenterAtlanta Regional Commission · published / observed 2026-08-28
Regional workforce-board registereducation workforcesupportingcurrent

Official register lists the Douglasville center at 5903 Stewart Parkway with job-search, training and employer services. Referrals require employer, worksite and project verification.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for center location and services. It is a navigation route, not evidence of a DC BLOX partnership or placement outcome.
358
Csquare ATL1 · Lithia Springs facility specificationCsquare · published / observed 2026-08-28
Owner facility registerfirst partydirectcurrent

Current operator sheet identifies ATL1 at 375 Riverside Parkway, reports 102,421 square feet, 81.5 MW utility capacity, 9.2 MW UPS capacity, 24/7 on-site staffing and 14 connectivity providers. These figures conflict with the operator's 2024 sheet and require building/suite reconciliation.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for current operator identity, address and published configuration. Utility capacity is not equivalent to live IT load, and the changed area/power figures require clarification before longitudinal comparison.
359
375 Riverside Parkway A / B · local business registrationsDouglas County · published / observed 2025-11-30
County business-license registerpublic recordrecordcurrent

County business register records 375 Riverside Parkway A LLC at suites 125, 135, 145 and 150 and 375 Riverside Parkway B LLC under the operator's Coppell headquarters. It supports active local entities, not employment or commissioned-load counts.

Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · high accuracyHigh for registered entities, addresses and filing month. The register does not establish ownership, headcount, suite utilization or capacity.
360
375 Riverside Parkway · address matchU.S. Census Bureau · published / observed 2026-08-28
Federal address geocoderpublic recordsupportingcurrent

Current public address-range geocoder matched the operator-published address and returned representative point -84.582821, 33.743617. The point locates the address range, not a surveyed building centroid.

Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracySuitable for map placement at street-address scale. It is not parcel geometry or a surveyed facility coordinate.
361
Csquare · careersCsquare · published / observed 2026-08-28
Owner careers pageofficial job boarddirectcurrent

Official operator route links to current openings. No requisition in this evidence cut is normalized as an exact ATL1 or Lithia Springs vacancy.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · qualified accuracyHigh for the hiring route; current exact-site vacancy count remains zero until the linked ATS is fully enumerated and location-matched.
362
Atlanta · Douglasville 1 data centerFlexential · published / observed 2026-08-28
Owner facility registerfirst partydirectcurrent

Current owner page identifies the operating 1700 North River Road facility at about 205,000 square feet with 22.5 MW critical power, 34 MW standby generation and 25 MW cooling.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for owner-published address, design and service configuration. Critical-power design is not a disclosure of customer load or utilization.
363
Atlanta · Douglasville 2 data centerFlexential · published / observed 2026-08-28
Owner facility registerfirst partydirectcurrent

Current owner page identifies the operating 1750 North River Road facility with 36 MW critical-load UPS capacity, high-density and liquid-ready infrastructure.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for owner-published address and design configuration. Published UPS capacity does not establish current energized customer load.
364
Alteration permits J23-0745 and J23-0746 · Douglasville 1City of Douglasville Building Division · published / observed 2024-01-26
City monthly building-permit registerpublic recordrecordcurrent

City register records Brasfield & Gorrie on two commercial alterations at 1700 North River Road: $40 million / 89,670 square feet and $20 million / 204,704 square feet. Gridwork combines the declared values to $60 million but does not add the floor-area fields because the scopes may overlap.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for permit numbers, issue dates, exact address, contractor, declared values and reported floor-area fields. Package overlap, closeout and relationship to the owner's roughly 205,000-square-foot facility area require reconciliation.
365
Brasfield & Gorrie · careersBrasfield & Gorrie · published / observed 2026-08-28
Verified permit contractor careers pageofficial job boarddirectcurrent

Official employer route exposes current jobs plus mission-critical, trade, student and entry-level pathways. No current stable requisition in this cut names 1700 North River Road or Flexential Douglasville 1.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the official hiring route and employer pathways. The city permits establish the project relationship; current project assignment still requires an employer-named worksite.
366
Partial-demolition permit J25-0405 · Douglasville 2City of Douglasville Building Division · published / observed 2025-06-12
City monthly building-permit registerpublic recordrecordcurrent

City register records Corgan Associates on a partial-demolition permit at 1750 North River Road with a zero-dollar declared value. The record establishes early alteration activity but does not disclose demolition area, cost, completion or current staffing.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for permit number, date, exact address and applicant. The zero-dollar field is retained as reported and is not evidence that the work had no cost.
367
Alteration permit J25-0247 · Douglasville 2City of Douglasville Building Division · published / observed 2025-09-08
City monthly building-permit registerpublic recordrecordcurrent

City register records Corgan Associates on a 326,751-square-foot commercial alteration at 1750 North River Road with a $165 million declared value. The permitted area differs from the owner's 358,000-square-foot gross facility figure and is kept as a separate scoped field.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for permit number, date, exact address, applicant, declared value and permitted area. The permit is not audited spend-to-date, facility gross area, final inspection or occupancy evidence.
368
Flexential acquires Douglasville 2 real estateFlexential · published / observed 2025-05-12
Owner acquisition announcementfirst partydirectcurrent

Owner announcement reports acquisition of Douglasville 2, describes it as a 358,000-square-foot, 36 MW facility and says Douglasville 1 had been acquired in 2023. It establishes real-estate control, not workforce headcount.

Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · high accuracyHigh for transaction disclosure, addresses and operator-published facility scope. Customer utilization and building-level staffing remain undisclosed.
369
DigitalOcean GPU deployment · Douglasville 1Flexential · published / observed 2025-03-18
Operator customer announcementfirst partydirectcurrent

Flexential identifies a phased DigitalOcean GPU deployment across two connected halls at Douglasville 1. The announcement does not disclose local jobs or customer-utilized MW.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyHigh for named facility and customer deployment relationship. Deployment completion, utilization and hiring effects are not quantified.
370
CoreWeave high-density deployment · DouglasvilleFlexential · published / observed 2023-10-10
Operator customer announcementfirst partydirectcurrent

Flexential names CoreWeave as a customer in its new Douglasville facility and reports a 9 MW allocation to the Georgia deployment within an 18 MW two-market agreement. The exact building is inferred as Douglasville 1 from the 2023 campus chronology and remains labeled qualified.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · qualified accuracyHigh for customer, metro and Georgia allocation. Exact suite, building and current utilized load require confirmation.
371
Flexential · careersFlexential · published / observed 2026-08-28
Owner careers pageofficial job boarddirectdue soon

Official operator careers route covers data-center operations and technical roles. The linked Greenhouse board currently includes an exact Las Vegas North technician opening and a separate multi-city customer-success role; neither is reassigned to Douglasville or Phoenix.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · qualified accuracyHigh for the employer route and current Greenhouse inventory. Facility assignment is direct only where the requisition prints the owner location; multi-city roles remain regional.
372
Data Center Technician I · Las Vegas NorthFlexential · published / observed 2026-08-28
Greenhouse / Flexential current opening detailofficial job boarddirectdue soon

Current official requisition assigns a Data Center Technician I to NV – Las Vegas North, lists $19–$21 per hour, accepts a high-school diploma or equivalent with 0–4 years of experience, and describes four weeks of weekday training before varied shifts.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyDirect for the current title, owner location, pay, qualifications and training language. The posting names Las Vegas North but not the Lone Mountain street address; the exact facility match is supported by Flexential's separately verified two-site market register.
373
Senior Customer Success Manager · WestFlexential · published / observed 2026-08-28
Greenhouse / Flexential current opening detailofficial job boarddirectdue soon

Current official requisition lists Denver, Las Vegas, Portland and Salt Lake City as eligible locations and publishes an $84,000–$94,000 base range plus expected commission.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · qualified accuracyDirect for the role and eligible cities. It is a multi-city commercial opening, not evidence of a vacancy at either Las Vegas facility, so Gridwork preserves it only as a regional market signal.
374
1700 North River Road · address matchU.S. Census Bureau · published / observed 2026-08-28
Federal address geocoderpublic recordsupportingcurrent

Current public address-range geocoder matched 1700 North River Road and returned representative point -84.617891, 33.728721.

Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracySuitable for address-scale map placement; not parcel geometry or a surveyed building centroid.
375
1750 North River Road · address matchU.S. Census Bureau · published / observed 2026-08-28
Federal address geocoderpublic recordsupportingcurrent

Current public address-range geocoder matched 1750 North River Road and returned representative point -84.616202, 33.731694.

Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracySuitable for address-scale map placement; not parcel geometry or a surveyed building centroid.
376
Hickman Property · DRI 4422 final reportAtlanta Regional Commission · published / observed 2025-07-28
Regional-impact filing registerpublic recordrecordcurrent

Primary regional-impact record identifies East Village Dothan, Eberly and NV5; eleven data-center buildings totaling 6.22 million square feet plus 66,000 square feet of flex space on 736 acres; 538.8 retained open-space acres; two substations; and the Liberty / Tyson Road site. The site plan is stamped not issued for construction.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyHigh for the 2025 filed concept, applicant, consultants, parcels and environmental / traffic review. This superseded concept was later revised and denied; it is not build evidence.
377
East Village Dothan · M2025-03 / Z2025-77 / S2025-78Douglas County · published / observed 2025-12-02
County zoning agendapublic recordrecordcurrent

County agenda records the 700-acre Tyson Road data-center application and its November 2025 deferral. It is useful hearing history, not a final disposition.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyHigh for case numbers, applicant, parcels, acreage and deferral. Later July 2026 disposition controls current status.
378
Hickman hearing · revised five-building proposalFOX 5 Atlanta · published / observed 2026-07-07
Local government hearing coveragereported secondarysupportingcurrent

Local hearing coverage records the later five-building, 700-plus-acre proposal and the developer's claim of 200–300 permanent jobs. Those jobs were proposed, not observed or committed hires.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · qualified accuracyStrong for the revised hearing scope and quoted applicant claim. Retrieve the final revised site plan and applicant economic exhibit before treating dimensions or jobs as primary-record facts.
379
Douglas County denies Hickman / East Village Dothan requestData Center Dynamics · published / observed 2026-07-09
Local decision / industry reporting reconciliationreported secondarysupportingcurrent

Industry reporting records a 4–1 county denial of the revised five-building, approximately 4.4-million-square-foot proposal and reports EdgeConneX as the developer behind the applicant. The operator relationship remains qualified pending the applicant record or EdgeConneX disclosure.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh-confidence corroboration of the July 2026 denial and revised scope. The signed decision, vote sheet and primary EdgeConneX relationship record remain outstanding.
380
Liberty Road / Tyson Road · public road centerlinesOpenStreetMap contributors · published / observed 2026-08-28
Public road geocoder + filed site-plan reconciliationpublic recordsupportingcurrent

Public road geometry for Tyson Road was reconciled with Liberty Road way 613973072 and the filed DRI site plan. Gridwork uses representative point -84.889, 33.724 for the denied campus footprint; it is a digitized campus-scale point, not parcel geometry.

Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracySuitable for a denied campus-scale marker constrained by the two filed roads and I-20. Do not use for title, surveying or building-level placement.
381
EdgeConneX · careersEdgeConneX · published / observed 2026-08-28
Operator careers page + embedded Rippling boardofficial job boarddirectdue soon

Official operator route embeds a structured Rippling board. The board exposed 37 current roles and zero results for a Las Vegas search on August 28; no role is assigned to LAS01, and none may be attributed to the denied Hickman proposal.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · qualified accuracyHigh for the current board inventory and zero Las Vegas search result at observation time. Job boards change quickly; the Hickman relationship remains secondary-reported and the project was denied.
382
Americas Data Center Update · 7800 Strickland land saleCushman & Wakefield · published / observed 2024-12-31
National data-center land-transaction tablereported secondarysupportingcurrent

Brokerage transaction table records a November 2024 sale of 129 acres at 7800 Strickland Street for $64.7 million, with Amazon as buyer and TPA Group as seller. It is land-sale evidence, not a data-center plan, permit, construction start or operating record.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · qualified accuracyStrong for the reported address, acreage, month, price and parties. Retrieve the recorded deed and transfer-tax filing before treating the table as the controlling title record.
383
Amazon's Douglasville land acquisitionsCoStar News · published / observed 2025-01-08
Commercial-property transaction reportingreported secondarysupportingcurrent

CoStar reports that Amazon paid just over $64.7 million for a 129-acre Douglasville tract in November 2024 and names TPA Group as seller. The article says AWS did not disclose specific Georgia data-center locations and separately identifies the Echo Road / Rockhouse purchases.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · qualified accuracyUseful corroboration and essential for separating the TPA tract from Amazon's other Douglas County assemblages. It does not establish a campus scope, permit or delivery phase.
384
AWS plans at least $11B across Butts and Douglas countiesAmazon · published / observed 2025-01-07
Owner investment announcementfirst partydirectcurrent

AWS announces an estimated $11 billion Georgia infrastructure expansion and at least 550 high-skilled jobs across Butts and Douglas counties. The announcement names neither 7800 W Strickland nor any site-level allocation, schedule, building count or megawatt figure.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for the statewide / multi-county company commitment and described role families. Dollars and jobs cannot be assigned to this tract—or any single Georgia campus—without an allocation record.
385
7800 W Strickland · 31-report city permit sweepCity of Douglasville · published / observed 2026-08-28
City monthly building-permit register · full-period local filing sweeppublic recordrecordcurrent

Gridwork searched all 31 city monthly permit reports from January 2024 through July 2026 for 7800, Strickland, Amazon, TPA and data-center terms. No exact-address, Amazon or TPA construction record was found. This is a bounded negative result: differently addressed, county, state, utility or unindexed permits may still exist.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for the searched city reports and date range. Absence from this index does not prove absence from every permitting authority or from records using a different project address.
386
7800 W Strickland · quarry / production DRI 2983Atlanta Regional Commission · published / observed 2019-10-04
Regional-impact filing archivepublic recordrecordcurrent

Historic regional-impact filing places a proposed 78.62-acre quarry and production facility at 7800 W Strickland, north of US 78, with access from W Strickland. It provides address and site-history context only; it is not evidence of Amazon's current scope.

Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · high accuracyHigh for the 2019 proposal, address, access and historic site context. Parcel boundaries and current post-sale use require current title, zoning and permit records.
387
Douglasville redevelopment parcel register · 7800 W StricklandCity of Douglasville · published / observed 2020-10-01
City redevelopment and tax-allocation parcel appendixpublic recordrecordcurrent

City redevelopment-plan parcel table lists 7800 W Strickland as parcel 190025-9 with 45.55 acres and then-current light-industrial zoning; adjacent acreage appears under separate parcel records. The 129-acre Amazon transaction therefore should not be represented as one legacy parcel polygon.

Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracyHigh for the dated parcel table. Ownership, acreage assembly, zoning and assessed value are stale after the 2024 sale and require current assessor/deed retrieval.
388
W Strickland terminus · campus-scale reference pointOpenStreetMap contributors · published / observed 2026-08-28
Public road geometry + historic site-plan reconciliationpublic recordsupportingcurrent

Public road geometry places the western W Strickland terminus near the historic filed property. Gridwork uses representative campus-scale point -84.790, 33.747, reconciled with the historic DRI's north-of-rail / west-of-S Flat Rock description. Census returned no exact address match.

Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracySuitable for market navigation and distinguishing the tract from Echo Road sites. It is not a surveyed centroid, parcel boundary or building location.
389
TPA Group · digital infrastructure practiceTPA Group · published / observed 2026-08-28
Reported seller identity + current company sitefirst partydirectcurrent

Current company site identifies TPA Group as a real-estate investment, acquisition and development firm with a digital-infrastructure practice. It does not publish a 7800 W Strickland project page, current role board or continuing post-sale assignment.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for company identity and service line. The sale relationship is established by transaction reporting, not this first-party page; ongoing project involvement is not asserted.
390
Douglas Waldrop · DRI 4192 final reportAtlanta Regional Commission · published / observed 2024-10-09
Regional-impact filing registerpublic recordrecordcurrent

Primary regional-impact record identifies TC Atlanta Development, 2912 Post Road, a revised two-building plan totaling 1,760,850 square feet on about 166 acres, a $2.2 billion filed build-out estimate and a 2027 target. It records a plan, not construction or realized investment.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the filed applicant, site, revised scope, study assumptions and target schedule. The filing does not prove construction, operator identity, commissioned capacity or spend-to-date.
391
TC Atlanta Development · M2024-07 / Z2024-55 / S2024-56Douglas County · published / observed 2025-02-04
County zoning agendapublic recordrecordcurrent

County agenda records the 164.7-acre land-use, rezoning and special-use requests for a data center, substation and watershed impervious-surface exception at Veterans Memorial, Mason Creek and Old Post Road after two prior tablings. The packet is an application record, not the adopted order.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for case numbers, hearing history, parcels, acreage and requested uses. Retrieve the signed decision and conditions before treating the agenda itself as approval evidence.
392
Douglas County commissioners approve revised Waldrop planWSB-TV · published / observed 2025-02-05
Local government meeting coveragereported secondarysupportingcurrent

Local reporting says commissioners approved TC Atlanta Development's revised two-building campus and substation with added conditions on February 4, 2025. The signed county order and full condition schedule remain outstanding primary records.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyStrong corroboration of the approval vote and revised building count, but the final order, vote sheet and conditions should replace this source when retrieved.
393
2912 Post Road · address matchU.S. Census Bureau · published / observed 2026-08-28
Federal address geocoderpublic recordsupportingcurrent

Current public address-range geocoder matched the DRI address and returned representative point -84.824481, 33.727057.

Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracySuitable for address-scale map placement. It is not parcel geometry or a surveyed campus centroid.
394
Trammell Crow Company · Atlanta officeTrammell Crow Company · published / observed 2026-08-28
Developer office registerfirst partydirectcurrent

Current first-party office record confirms the 3550 Lenox Road address used in the DRI, names the local team and reports an Atlanta pipeline that includes data-center development. It does not publish a Douglas Waldrop construction start or end customer.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for company identity, office, team and current market presence. Project execution and employment must be verified separately.
395
Trammell Crow Company · careersTrammell Crow Company · published / observed 2026-08-28
Developer careers pageofficial job boarddirectcurrent

Official developer career route. No current requisition in this evidence cut names Winston, Douglas Waldrop, TC Atlanta Development or 2912 Post Road.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · qualified accuracyHigh for the employer route. Exact-site vacancy count remains zero until the linked CBRE system is enumerated and worksite-matched.
396
HRC · Douglasville civil engineer / intern recruitmentHRC Engineers · published / observed 2024-06-17
Consultant recruiting archiveofficial job boardsupportingcurrent

First-party historical recruitment notice for the Douglasville civil engineer that prepared the filed Waldrop site plan. It is retained as a local talent-route signal, not a current vacancy or proof of project staffing.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for the historical role, location and employer. It is stale for vacancy status and cannot be attributed to Douglas Waldrop without employer confirmation.
397
NV5 · official careersNV5 · published / observed 2026-08-28
Consultant ATSofficial job boarddirectcurrent

Official recruiting system for the transportation consultant named in the Waldrop traffic study. No current requisition is normalized as a Douglas Waldrop assignment.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · qualified accuracyHigh for the employer hiring route. Project and exact-worksite linkage require employer confirmation.
398
Rock House Road Data Center · DRI 4078 final reportAtlanta Regional Commission · published / observed 2024-01-22
Regional-impact filing registerpublic recordrecordcurrent

Primary regional-impact record identifies 1971 Rock House Road, Taylor Mathis as developer, four buildings totaling 1,465,000 square feet on about 117 acres, an accessory substation and a 2028 target. It is a plan, not evidence of construction or operation.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for filed applicant, address, plan and target schedule. All scope and timing remain proposed until local approvals and permits are retrieved.
399
Rockhouse & Echo Road · M2024-02 / Z2024-07 / S2024-08Douglas County · published / observed 2024-02-06
County zoning agendapublic recordrecordcurrent

County agenda records a 118-acre future-land-use amendment, rezoning and substation special-use request at Rockhouse and Echo Roads. The agenda does not contain the final disposition.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for applications, parcels, acreage and hearing date. Approval, conditions and subsequent permit status require the adopted minutes and orders.
400
Douglas County Data Center Story · Project Lighthouse overviewGeorgia Association of Zoning Administrators · published / observed 2025-08-01
Professional-association conference deckreported secondarysupportingcurrent

County case-study deck identifies T5, STACK and Rock House as three Project Lighthouse sites, reports a $10 billion minimum package and 252 committed jobs, and says Rock House construction awaits incentive execution. It separately labels TPA/AWS as complete or coming online in 2025 and ATL II colocation, Atlanta Data Center, Google, PWC and Switch as existing/operational. Gridwork treats those labels as leads requiring address-level records—not proof of commissioning. Package commitments are not assigned to individual sites.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyUseful for county program identity, local naming and aggregate commitments. Its status labels are not a substitute for deeds, permits, inspections or operator records; retrieve those and allocation schedules before assigning phase, dollars or jobs to one site.
401
1971 Rock House Road · address matchU.S. Census Bureau · published / observed 2026-08-28
Federal address geocoderpublic recordsupportingcurrent

Current public address-range geocoder matched the filed DRI address and returned representative point -84.607818, 33.750447.

Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracySuitable for address-scale map placement; not parcel geometry or a surveyed campus centroid.
402
Switch Atlanta · The Keep campusSwitch · published / observed 2026-08-28
Owner facility and expansion registerfirst partydirectcurrent

Current owner page markets the Atlanta Keep core campus at up to 150 MW and shows a Q2 2025 Keep 2.0 expansion update. It also describes a separate 2,000-plus-acre multi-gigawatt expansion campus; planned expansion is not live capacity.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for current owner identity and published plan. The page does not disclose building-level commissioned capacity, utilized load or completion dates.
403
2480 Rock House Road · address matchU.S. Census Bureau · published / observed 2026-08-28
Federal address geocoderpublic recordsupportingcurrent

Current public address-range geocoder matched the operator-published address and returned representative point -84.597431, 33.741343.

Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracySuitable for address-scale map placement; not parcel geometry or a surveyed building centroid.
404
Switch signs anchor tenant and starts Atlanta 2 / 3Switch · published / observed 2020-10-05
Owner construction milestonefirst partydirectcurrent

Owner announcement says Atlanta 1 was open and 72% committed, buildings 2 and 3 were breaking ground, later phases would add 50 MW and 35 MW, and full build-out was expected to exceed 1.3 million square feet with $2.5 billion including customer hardware.

Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracyHigh for the dated milestone and historical plan. Forecast opening dates and aggregate investment require current building-level confirmation.
405
Douglas County · Switch investment historyDouglas County · published / observed 2026-08-28
County economic-development recordpublic recordsupportingcurrent

County page attributes a $2.5 billion Switch data-center investment to the 2017 recruitment. It is an announced aggregate, not audited spend-to-date.

Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracyHigh for the county's stated recruitment claim; the page does not provide project accounting, building allocation or current employment.
406
Switch · current openingsSwitch · published / observed 2026-08-28
Owner careers page + embedded ClearCompany boardofficial job boarddirectdue soon

Official owner ClearCompany board was enumerated across all five pages. Thirty-one current requisitions list Las Vegas as a work location; each remains a regional Switch signal because the postings do not print a Core-campus street address or building assignment.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · qualified accuracyHigh for current requisition identity, title and displayed location. Las Vegas does not by itself prove assignment to the Core campus, NAP 17–18 or a particular building.
407
Switch Data Center · OpenStreetMap building pointOpenStreetMap / Mapcarta · published / observed 2026-08-28
Open map building geometryreported secondarysupportingcurrent

OpenStreetMap building record places 1 Switch Way at approximately -84.58727, 33.75503. The Census address-range service returned no match, so this community-map point remains a qualified placement aid.

Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracySuitable for approximate map placement and corroborated by owner-published address; retrieve parcel GIS or permit coordinates for authoritative geometry.
408
Data Canopy · Atlanta / Lithia SpringsData Canopy · published / observed 2026-08-28
Operator facility registerfirst partydirectcurrent

Current operator page identifies 2480 Rock House Road, 10 MW critical power, 19,500 square feet of critical space, a 79,570-square-foot building and about 18 acres. It also lists expansion space and 24/7 support.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for current operator-published address and configuration. Design capacity does not reveal current customer load or utilization.
409
Data Canopy Lithia Springs · facility specificationData Canopy · published / observed 2025-02-11
Operator technical sheetfirst partydirectcurrent

Operator sheet corroborates 10 MW critical power, 19,500 square feet of critical space, 79,570 square feet total and an expansion area. It does not disclose live customer load or staffing.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyHigh for the dated configuration. Capacity and available expansion are not utilization or commissioned-load measures.
410
PwC SOC 3 · Georgia Data CenterPricewaterhouseCoopers · published / observed 2023-09-30
Enterprise assurance reportfirst partydirectcurrent

PwC's assurance report identifies its Lithia Springs Georgia Data Center as the primary processing facility for named production environments and says PwC Technology and facilities personnel manage infrastructure and physical/environmental controls.

Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · high accuracyHigh for PwC's operating role at the reporting date. Recheck lease and facility arrangements for later changes.
411
PwC data center · 2021 real-estate acquisition summaryNorth American Data Centers · published / observed 2022-01-31
Data-center transaction reportreported secondarysupportingcurrent

Industry acquisition report identifies 2480 Rock House Road, 79,682 square feet, a reported $101 million October 2021 sale and PwC as single tenant with about eight years then remaining. Recheck deed and lease records before treating these terms as current.

Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracyUseful for transaction chronology and tenancy. Dollar value, lease term and current ownership require primary deed/lease confirmation.
412
T5@Atlanta II · colocation facility flyerT5 Data Centers · published / observed 2018-02-01
Owner facility flyerfirst partydirectcurrent

T5's first-party flyer describes a 130,000-square-foot, 10 MW critical-load, server-ready multi-tenant facility with 24/7 operations and future expansion. It is historical configuration evidence and requires current building-level reconciliation.

Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracyHigh for the historical marketed configuration. Current area, power, occupancy and relation to later ATL068/ATL078 construction require updated owner or permit records.
413
ATL 088 Data Center Development · buffer variance noticeGeorgia Environmental Protection Division · published / observed 2025-04-29
State watershed public-notice registerpublic recordrecordcurrent

State notice names Amazon Data Services as applicant for ATL 088 off Rock House and Echo Roads, provides the representative coordinate 33.7420, -84.6049 and records 84 acres of proposed disturbance with 769 linear feet of permanent buffer impacts. It is an application notice, not construction approval or an operating record.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for applicant, project identifier, filed location and environmental scope. Proposed disturbance and impacts require the approval record and later construction evidence.
414
ATL 088 revised buffer variance approval · BV-048-25-02Georgia Environmental Protection Division · published / observed 2025-06-20
State watershed approval registerpublic recordrecordcurrent

EPD's revision corrects a scrivener's error in the June 6 approval and confirms ATL 088 is in Douglas County. The variance authorizes the filed buffer impacts subject to eight conditions and a five-year completion window; it does not replace federal, local or other state permits.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyHigh for the approved buffer variance, corrected county and conditions. This authorization alone does not establish a building permit, occupancy or operation.
415
Rock House Road Data Center · retaining-wall permitsDouglas County · published / observed 2025-12-03
County monthly building-permit registerpublic recordrecordcurrent

The December county register records issued permits 2502498-DC and 2502499-DC for soil-nail retaining walls 1 and 4 at 2341 Echo Road and names JE Dunn Construction. The register reports no declared value or wall area for these two records.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for issued permit numbers, address, scope and contractor. Retaining-wall permits establish early construction activity, not the main building's completion.
416
ATL 088 commercial building permit · 2600189-DCDouglas County · published / observed 2026-02-04
County monthly building-permit registerpublic recordrecordcurrent

County register records an issued commercial building permit at 2341 Echo Road for ATL 088 and an exterior equipment yard: 414,000 square feet, $310 million declared value and JE Dunn Construction as contractor. The declared value is not audited spend-to-date or total campus investment.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the issued permit, address, area, declared value and named contractor. It does not establish inspections, occupancy, commissioned power or operating status.
417
ATL 088 electrical permit · 2600854-DCDouglas County · published / observed 2026-04-15
County monthly electrical-permit registerpublic recordrecordcurrent

County register records an issued commercial electrical permit at 2341 Echo Road for service panels, fixtures and floodlighting and names Lin R. Rogers / Rogers Electrical Contractors. The line repeats 414,000 square feet and publishes no separate declared value.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for permit date, address, scope and contractor. It does not disclose package value, crew size, completion or energization.
418
ATL 088 retaining wall 21 · 2601258-DCDouglas County · published / observed 2026-05-29
County monthly building-permit registerpublic recordrecordcurrent

County register records an issued retaining-wall permit for ATL 088 at 2341 Echo Road with a $413,350 declared value and Contour Retaining Walls as contractor. The tabular extraction reports 19,774 square feet; confirm the field definition against the permit file before treating it as wall face area.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for the permit, address, value and named contractor; qualified for the extracted 19,774-square-foot field because the county report does not clearly label its dimensional meaning in search text.
419
AWS data-center openings · Lithia Springs marketAmazon Jobs · published / observed 2026-08-28
Owner ATS exact-market searchofficial job boarddirectcurrent

Official location search exposes current controls, engineering-operations, network-installation, infrastructure-delivery and technician roles naming Lithia Springs or the Douglasville/Lithia Springs market. No requisition in this cut names ATL 088 or 2341 Echo Road.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for live requisitions, locations and compensation at observation time. All remain regional until Amazon confirms an ATL 088 assignment.
420
Work-Based Learning Program · Data Center Operations TechnicianAmazon Jobs · published / observed 2026-08-28
Owner ATS training requisitionofficial job boarddirectcurrent

Official paid Lithia Springs requisition describes a 12-month work-and-training program for data-center operations technicians with a published $23–$40 hourly range. It is a local AWS pathway but does not identify ATL 088 as the assigned facility.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the current role, duration, location, requirements and compensation. Cohort seats, start date and facility assignment are controlled by Amazon and can change.
421
AWS fiber-optic fusion-splicing training · West Georgia TechAmazon · published / observed 2026-08-28
Employer workforce-program reporteducation workforcedirectcurrent

Amazon documents no-cost fiber installation and repair training hosted with West Georgia Technical College and Southern Crescent Technical College. The page establishes the program relationship but does not publish the next WGTC cohort date, seat count or ATL 088 placement agreement.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the completed Georgia training activity and partners. Current enrollment and project assignment require direct reconfirmation.
422
JE Dunn · official jobsJE Dunn Construction · published / observed 2026-08-28
Verified permit contractor ATSofficial job boarddirectcurrent

Official career route covers craft, early-career, project-management and construction-supervision openings. The county permits verify JE Dunn at ATL 088, but no current requisition in this evidence cut names 2341 Echo Road.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the official hiring route. Exact project assignment requires an employer-named worksite or hiring confirmation.
423
Rogers Electric · careersRogers Electric · published / observed 2026-08-28
Verified permit contractor careers routeofficial job boarddirectcurrent

Official company site links the employer's current career intake for construction, service, maintenance and lighting work. The county electrical permit verifies the ATL 088 relationship; current Georgia roles still require project confirmation.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the official employer intake and verified permit relationship. A metro or Georgia opening is not automatically an ATL 088 assignment.
424
Z2019-05 · T5 Data Centers rezoning applicationDouglas County · published / observed 2019-01-04
County planning-and-zoning agenda packetpublic recordrecordcurrent

County agenda identifies T5 Data Centers as applicant for an 80-acre data-center rezoning across Trae Lane, Douglas Hill Road and Factory Shoals Road. It establishes the original tract and applicant, not final approval, construction, tenancy or delivered capacity.

Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · high accuracyHigh for the filed applicant, location, parcels, acreage and requested use. The agenda contains apparent OCR/date errors and does not itself prove disposition or execution.
425
T5@Atlanta III campus flyerT5 Data Centers · published / observed 2021-08-31
Owner historical campus marketing sheetfirst partydirectcurrent

Historical owner marketing describes an 80-acre Atlanta III campus with 217 MW total design capacity, a 19.8 MW initial build and feeds from the Grover Lake and Factory Shoals substations. These are dated design and availability claims, not commissioned load or current tenant capacity.

Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracyHigh for what T5 marketed in August 2021; qualified for current scope and delivery because the flyer is historical and its availability date has passed.
426
T5 property portfolio · Atlanta IIIT5 Data Centers · published / observed 2026-08-28
Owner current property portfoliofirst partydirectcurrent

T5's current portfolio groups Atlanta III with pre-leased sites under construction. The page supports current phase classification but does not expose building-level turnover, tenant identity, live load or a completion date in accessible text.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for T5's current under-construction classification. Building count, schedule and capacity require supporting project records.
427
Amazon ATL068 and ATL078 · air-permit narrativeGeorgia Environmental Protection Division · published / observed 2025-04-07
State air-permit application narrativepublic recordrecordcurrent

State narrative says Amazon plans two new co-located campuses at 1456 Trae Lane under ATL068 and ATL078, with 188 diesel emergency generators: 180 critical, six house, one booster-pump and one security unit. Generator count and nameplate ratings are not IT capacity or energized utility load.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for applicant, addresses, proposed campuses and equipment schedule at filing. It is application evidence and does not establish completed installation, occupancy or commissioned load.
428
Amazon ATL068 and ATL078 · proposed air permit 7374-097-0101-S-01-0Georgia Environmental Protection Division · published / observed 2025-07-01
State proposed air permitpublic recordrecordcurrent

The state draft permit covers construction and operation of the two co-located campuses and 188 emergency generators. Its published copy has a blank issuance date, so Gridwork treats it as proposed until a signed final permit is retrieved.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for proposed permit number, scope, applicant and address. Not evidence of final issuance because the retrieved document is explicitly a draft with no issuance date.
429
T5@Atlanta III building tops outData Center Dynamics · published / observed 2025-07-01
Trade press citing owner announcementreported secondarysupportingcurrent

Trade coverage quotes T5's public topping-out announcement and reports final steel on an Atlanta III building. Reported 300 MW, one-million-square-foot and five-building full-build figures remain secondary until reconciled to a current T5 plan or permit set.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyStrong corroboration for the June 2025 structural milestone; qualified for full-build scale because the retrieved primary portfolio does not expose those figures in accessible text.
430
T5 Data Centers · Atlanta openingsT5 Data Centers / Lever · published / observed 2026-08-28
Employer ATS public structured feedofficial job boarddirectcurrent

T5's public Lever feed returned six current Atlanta records across construction leadership, logistics, preconstruction, safety and recruiting. The postings support T5's regional delivery platform and headquarters; none names Atlanta III, ATL068, ATL078, Trae Lane or Factory Shoals Road.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for live titles, locations and direct application URLs at observation time. Campus assignment is unresolved and every record requires daily availability refresh.
431
Z2024-50 / S2024-51 · Grind Capitol Echo Road applicationDouglas County · published / observed 2024-08-26
County planning-and-zoning agenda packetpublic recordrecordcurrent

County agenda identifies Grind Capitol LLC as applicant for rezoning and a special-use permit for a data center exceeding 50,000 square feet on 13.5 acres across land lot 175 parcels 7, 28 and 29 on Echo Road. The record is treated as a precursor / parcel-assembly signal within the later ATL 088 envelope, not a separate campus, pending deed or site-plan confirmation.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for applicant, parcel set, acreage and requested use. Qualified for relationship to ATL 088: corridor, address proximity and later project envelope align, but the retrieved agenda does not name Amazon or record a transfer.
432
2025 returned-assessment notice · parcel 0175-015-0007Douglas County · published / observed 2025-01-01
County tax-assessment noticepublic recordrecordcurrent

County tax notice resolves one Grind filing parcel to 2421 Echo Road and identifies the owner as of January 1, 2025. It is a dated ownership snapshot and predates a May 2025 reported sale; current ownership and grantee require deed retrieval.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the county's parcel-to-address and dated owner record. It is not a current title report and does not establish the buyer or project assignment after January 2025.
433
2421 Echo Road address matchU.S. Census Bureau Geocoder · published / observed 2026-08-28
Federal address geocoderpublic recordsupportingcurrent

Federal address match places 2421 Echo Road at approximately 33.738088, -84.601164, about half a kilometer from ATL 088's representative state-filed coordinate. Proximity supports entity review but does not replace parcel geometry, a survey or a deed chain.

Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracyQualified for parcel-level boundary analysis because geocoded address points are representative locations, not surveyed tract geometry.
434
Grind Capital Group · data infrastructureGrind Capital Group · published / observed 2026-08-28
Applicant company sitefirst partysupportingcurrent

The company's current site identifies it as an Atlanta commercial-real-estate developer with a data-infrastructure practice. It does not list the Echo Road proposal, publish a project roster or expose a public jobs board.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for company identity, location and stated business line. No current project status or employer demand can be inferred from the general company page.
435
STACK ATL02 · Lithia SpringsSTACK Infrastructure · published / observed 2026-08-28
Owner current campus portfoliofirst partydirectcurrent

STACK's current Atlanta portfolio identifies ATL02 in Lithia Springs as a 160 MW campus. The accessible owner page does not disclose how much capacity is energized, leased, commissioned or still under construction.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for operator, campus identity, location and marketed scale. Treat 160 MW as campus capacity, not verified live IT load.
436
Lithia Springs Data Center · DRI 4087 final reportAtlanta Regional Commission / Douglas County · published / observed 2023-12-04
Regional-impact review and county staff reportpublic recordrecordcurrent

Regional and county filing identifies SI ATL02A LLC c/o STACK, IPI Atlanta II LLC and Bohler; plans two three-story buildings totaling 878,886 square feet on 44.3 acres at 800–808 Factory Shoals Road, estimates $380,930,665 at build-out, 0.031 MGD water demand and a May 2026 completion target. All figures are application estimates, not audited delivered results.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for filed developer, owner, consultant, site plan, estimated value, utility assumptions and target schedule. Current built area, spend, load and occupancy require later permits and inspections.
437
Z2023-71 / S2023-72 · SI ATL02A zoning and substation caseDouglas County · published / observed 2024-01-04
County planning-and-zoning agenda packetpublic recordrecordcurrent

County agenda carries the 44-acre SI ATL02A request at 808 Factory Shoals Road after it was tabled from January 2024. The agenda verifies the hearing trail but not the final adopted vote or every condition.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for applicant, address, acreage and requested substation/data-center uses. Retrieve adopted minutes or the ordinance for final disposition and conditions.
438
Lithia Springs sanitary-sewer buffer variance · BV-048-24-02Georgia Environmental Protection Division · published / observed 2024-10-16
State watershed approval registerpublic recordrecordcurrent

State approval authorizes SI ATL02A's filed stream-buffer impacts for sanitary-sewer improvements subject to six conditions and a five-year completion window. It names ECS Southeast on the project correspondence and requires any county land-disturbance permit to carry the conditions.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyHigh for applicant, authorized buffer work, conditions and ECS correspondence. It is not a building permit, occupancy record or proof of completed sewer service.
439
M2025-02 / Z2025-47 / S2025-48 · Factory Shoals and Linda LaneDouglas County · published / observed 2025-05-01
County planning-and-zoning agenda packetpublic recordrecordcurrent

County agenda identifies SAC III Acquisitions as applicant for a 37-acre data center across Factory Shoals and Linda Lane parcels. It is retained as a qualified adjacent expansion / assembly signal for the ATL02 research envelope; the filing does not name STACK and the final disposition remains unresolved.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for the separate applicant, parcel set, acreage and requested use. Qualified for connection to ATL02 until ownership, affiliate status, approved site plan or project naming is confirmed.
440
STACK Infrastructure · North America careersSTACK Infrastructure · published / observed 2026-08-28
Owner careers hub and Workday boardofficial job boarddirectcurrent

Official employer route links STACK's North America requisition board. No current record in this evidence cut names Lithia Springs or ATL02, so national, Denver, Alpharetta and Santa Teresa roles are not assigned to this campus.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the official hiring route. Exact ATL02 demand remains unverified until a requisition names Lithia Springs, ATL02 or 808 Factory Shoals Road.
441
Bohler · careersBohler · published / observed 2026-08-28
Verified filing consultant careers pageofficial job boarddirectcurrent

Official career route for the civil and site-plan consultant named throughout ATL02's DRI. No current requisition is linked to 808 Factory Shoals Road in this evidence cut.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the employer route and filing relationship. Office or Atlanta roles are not project assignments without employer confirmation.
442
ECS Limited · careersECS Limited · published / observed 2026-08-28
State-record consultant careers pageofficial job boarddirectcurrent

Official career route for ECS Southeast, copied on ATL02's issued state buffer approval. The record establishes environmental / geotechnical correspondence, not a continuing construction package or exact-site vacancy.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the employer route and state-record relationship. Current scope, contract value and project staffing are undisclosed.
443
S2025-13 · Big Power Developments 5 special-use applicationDouglas County · published / observed 2025-02-25
County planning-and-zoning agenda packetpublic recordrecordcurrent

County zoning packet identifies Big Power Developments 5 LLC as applicant for a data center and electrical substation at 2250 Rockhouse Road. It records land lot 947, parcel 1, 36 acres and commission district 2. This is an application record, not an approval, permit or construction start.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for applicant, address, parcel description, acreage and requested uses as filed. The packet does not establish approval, ownership, an end user or executed development.
444
Rockhouse Road data center · revised March 2026 zoning agendaDouglas County · published / observed 2026-02-06
County planning-and-zoning agenda packetpublic recordrecordcurrent

Revised county packet returns the 36-acre application after a February deferral and describes a data center exceeding 50,000 square feet plus an electrical substation at 2250 Rockhouse Road. The agenda proves the matter was scheduled; it does not itself record the final vote or adopted order.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for the scheduled case, applicant, site, minimum floor-area threshold and requested uses. Final disposition requires adopted minutes, an order or another official decision record.
445
Rockhouse Road data-center vote · transcript-derived reportCitizenPortal.ai · published / observed 2026-03-04
Public-meeting transcript summaryreported secondarysupportingcurrent

Transcript-derived meeting report says commissioners voted 5–0 to deny the special-use request and describes a proposed five-acre substation. It is retained as qualified evidence until Douglas County publishes adopted minutes or an order; automated summaries can misstate speakers, motions or vote details.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyQualified: it reports a recorded public meeting but is an automated secondary summary, not adopted county minutes. The 5–0 vote and five-acre substation detail require official confirmation.
446
Douglas County commissioners reject Rockhouse Road data-center proposalWest Georgia Times · published / observed 2026-03-07
Local government meeting coveragereported secondarysupportingcurrent

Local report independently describes rejection of the Rockhouse Road proposal after public comment. It corroborates the reported outcome but is not the adopted county decision, so the project remains tagged for official-record retrieval.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyQualified for final legal disposition because the underlying adopted minutes or order has not been retrieved. Useful as independent corroboration of the reported denial.
447
2250 Rockhouse Road · commercial land listingCrexi · published / observed 2026-08-28
Commercial property listingreported secondarysupportingcurrent

Commercial listing describes approximately 36.72 acres at 2250 Rockhouse Road. It is a watch signal only: listing status can lag a sale, contract, withdrawal or redevelopment and does not establish current ownership or an active data-center plan.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyQualified for acreage and current marketing status; broker listings can be stale and are not substitutes for assessor, deed, applicant or permit records.
448
Google data centers · GeorgiaGoogle · published / observed 2026-08-28
Owner location and milestone registerfirst partydirectcurrent

Google's current location page identifies Douglas County as an active data-center community, says the site opened in 2007, records a $300 million expansion announced in 2015 and links Georgia electrical-skills and careers routes. Its $3 billion-plus investment total covers Georgia digital infrastructure since 2003 and is not assigned wholly to this campus.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for operator, operating status, opening milestone, 2015 expansion announcement and current owner routes. Statewide investment and community figures cannot be treated as campus spend or payroll.
449
Google Inc. NPDES permit reissuance · GA0038920Georgia Environmental Protection Division · published / observed 2015-10-08
State wastewater-permit noticepublic recordrecordcurrent

State public notice identifies Google's data-processing and hosting center at 300 Riverside Parkway SW and records approximately 0.6 MGD of cooling-tower blowdown and filter-backwash wastewater. The permitted discharge figure is not total water withdrawal, consumption or current average use.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for facility identity, address, permit number and authorized discharge description at the notice date. Current compliance, actual flows and later permit terms require a refreshed permit record.
450
Google Inc. air-permit application · 300 Riverside ParkwayGeorgia Environmental Protection Division · published / observed 2019-04-01
State air-permit advisorypublic recordrecordcurrent

State advisory identifies Google at 300 Riverside Parkway SW and describes the operation as a data center / internet service provider seeking synthetic-minor nitrogen-oxide limits. It verifies operating use and address, not generator count, IT capacity or current permit compliance.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for facility, address, application number and stated operation at filing. Retrieve the current issued permit before asserting equipment totals, emissions limits or expansion scope.
451
Data Center Community Impact Report · Douglas County spotlightGoogle · published / observed 2026-06-01
Owner annual community-impact reportfirst partydirectcurrent

Google reports that more than 90% of cooling water at the Douglas County facility was recycled in 2023 and describes a $42,000 Mercer University Workforce Innovation Lab grant. The report's approximately 11,000 annual jobs supported, $1.46 billion of activity and $941 million of labor income are Georgia data-center-community impact estimates for 2021–2023, not campus headcount or payroll.

Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracyHigh for Google's disclosed programs and recycled-water share; qualified for modeled statewide economic impacts, which include direct, supplier and induced effects and must not be recast as onsite jobs.
452
Data Center Technician I · Lithia SpringsGoogle Careers · published / observed 2026-08-28
Owner ATS exact-city roleofficial job boarddirectcurrent

Current official requisition names Lithia Springs as its sole location and covers server deployment, troubleshooting, repair and preventive maintenance. The posting does not name 300 Riverside Parkway, so it is retained as a regional Google market match rather than a campus-assigned vacancy.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for employer, title, location, qualifications, responsibilities and compensation at observation time. Exact campus assignment and continuing availability require daily recheck.
453
Z2024-49 · Stream Data Centers special-use applicationDouglas County · published / observed 2024-08-26
County planning-and-zoning agenda packetpublic recordrecordcurrent

County agenda identifies Stream Data Centers' request for a data center exceeding 50,000 square feet with a substation on 146 acres at Jason Industrial Boulevard and Polk Road in Winston. This is the initial application footprint, not proof of construction or the final assembled campus area.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the 2024 applicant, use request, initial parcel set and acreage. Later state and owner records describe a larger footprint, so 146 acres is retained as filing history rather than current total site area.
454
SDC ATLA · Section 401 water-quality certification noticeGeorgia Environmental Protection Division · published / observed 2025-10-20
State water-quality certification noticepublic recordrecordcurrent

State notice identifies SDC ATLA as a Stream affiliate and proposes up to eight data-center buildings, an onsite substation and supporting infrastructure on a 215.61-acre tract northwest of Veterans Memorial Highway and North Baggett Road. It provides the representative coordinate 33.735500, -84.810406. Certification review is not a building permit or construction start.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for applicant relationship, filed coordinate, tract, proposed building maximum and environmental-review scope. Final authorized impacts and actual buildout require issued approvals and local permits.
455
SDC ATLA air-permit narrative · application 29802Georgia Environmental Protection Division · published / observed 2026-04-01
State air-permit application narrativepublic recordrecordcurrent

State narrative evaluates 315 proposed Tier 2 diesel emergency generators rated at approximately 2.5 MW each, with 2027 installation dates, and a requested 99-ton-per-year nitrogen-oxide limit. Generator nameplate is backup generation—not critical IT load, utility service, energized capacity or proof all units will be installed.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for proposed equipment, ratings, installation schedule and modeled permit basis. Application scope is prospective and must be checked against the final issued permit and actual construction.
456
SDC ATLA proposed air permit · 2075 Jason Industrial ParkwayGeorgia Environmental Protection Division · published / observed 2026-04-01
State proposed-permit advisorypublic recordrecordcurrent

State advisory identifies the facility address, application 29802 and a proposed permit for construction and operation of a data center with 315 2.5-MW emergency generators. The comment period expired May 1, 2026; this record does not establish that a final permit was issued.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for proposed permit status, address, equipment count and comment deadline. The final permit and any subsequent modification remain refresh targets.
457
Stream Data Centers · locations registerStream Data Centers · published / observed 2026-08-28
Developer portfolio registerfirst partydirectcurrent

Stream's current portfolio labels ATLA in Atlanta as an in-development 274-acre hyperscale campus. The owner page does not publish current construction, building-level delivery dates, IT capacity or a tenant for ATLA.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for current owner designation and 274-acre marketing footprint. 'In development' is not treated as sitework, a permit issuance or a tenant commitment.
458
Stream Data Centers · careersStream Data Centers · published / observed 2026-08-28
Developer careers pageofficial job boarddirectcurrent

Official company career route is active, but no stable current Winston or ATLA requisition was exposed in this evidence cut. Corporate or Atlanta-capable roles must not be assigned to the project without a named worksite.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the official employer route. Zero normalized ATLA openings means none was defensibly linked, not that Stream has no hiring anywhere.
459
Microsoft datacenters in Georgia · Greater AtlantaMicrosoft Local · published / observed 2026-08-28
Owner community updatefirst partydirectcurrent

Microsoft's current community page says it is building datacenters in Douglasville, Palmetto and East Point. The page establishes current owner activity and community commitments, but does not publish Douglasville building-level turnover, energized capacity or a completion date.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for Microsoft's current statement that Douglasville remains in its Georgia build program. The page is metro-level and cannot establish which FTY01 buildings are commissioned or operating.
460
FTY01 DRI 3426 · regional review findingAtlanta Regional Commission · published / observed 2021-11-08
Regional development reviewpublic recordrecordcurrent

Final DRI record describes four approximately 245,000-square-foot data center buildings totaling 980,000 square feet on 159.48 acres, with build-out projected by 2031. The filed exhibit identifies Microsoft as owner, Thomas & Hutton as site-plan engineer, A&R Engineering as traffic consultant and HRC Engineers as surveyor.

Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · high accuracyHigh for the approved 2021 development configuration and named filing team. The 2031 date is a projected build-out, and later permits govern actual construction scope and sequence.
461
Building permit J22-0338 · 1601 North River RoadCity of Douglasville Building Division · published / observed 2023-03-09
City monthly building-permit registerpublic recordrecordcurrent

City permit register records a 245,948-square-foot industrial new-construction permit at 1601 North River Drive with a $31,255,072 declared value and Skanska USA Building as contractor. The value is one permit record, not total campus investment or audited spend.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for permit number, issue date, address, contractor, declared valuation and permitted floor area. A building permit does not establish final inspection, occupancy, commissioning or customer load.
462
Building permit J23-0721 · FTY01City of Douglasville Building Division · published / observed 2024-05-10
City monthly building-permit registerpublic recordrecordcurrent

City register records Skanska USA Building on a 244,678-square-foot commercial new-construction permit at 1601 North River Road with a $32,364,350 declared value. Gridwork treats it as a separate building package, not total campus investment.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for permit number, issue date, exact address, contractor, permitted area and declared value. Building sequence, final inspection, occupancy and commissioning require separate evidence.
463
Electrical permit J23-0721 · E2 Optics at FTY01City of Douglasville Building Division · published / observed 2025-02-24
City monthly electrical-permit registerpublic recordrecordcurrent

City register records E2 Optics on an electrical permit tied to J23-0721 at 1601 North River Road. The record publishes a zero-dollar declared value and no crew count; it verifies an exact-address package, not current hiring or completion.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for permit number, date, exact address and contractor. Package scope, value, completion, subcontract tier and current staffing remain unresolved.
464
Alteration permit J24-0318 · Morrison Hershfield at FTY01City of Douglasville Building Division · published / observed 2025-11-06
City monthly building-permit registerpublic recordrecordcurrent

City register records permit-named Morrison Hershfield on a $200,000 commercial alteration at 1601 North River Road. Stantec had acquired Morrison Hershfield in February 2024; Gridwork preserves the name appearing on the permit and identifies Stantec only as the current parent.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for permit number, date, exact address, permit-named firm and declared value. The record does not define design discipline, current internal team or package completion.
465
Building permit J24-0568 · FTY01City of Douglasville Building Division · published / observed 2026-06-30
City monthly building-permit registerpublic recordrecordcurrent

City register records Skanska USA Building on another 244,678-square-foot commercial new-construction permit at 1601 North River Road with a $32,241,220 declared value. Together with the 2023 and 2024 records, this establishes three near-245,000-square-foot building permits, not three completed buildings.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for permit number, issue date, exact address, contractor, permitted area and declared value. Building turnover, inspections, occupancy and live load remain unresolved.
466
E2 Optics · careers and trainingE2 Optics · published / observed 2026-08-28
Verified permit contractor careers pageofficial job boarddirectcurrent

Official employer route describes low-voltage IT integration, current openings and company-wide on-the-job, low-voltage, weekly safety and BICSI training. Those pathways are not presented as Microsoft- or FTY01-specific without employer confirmation.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the official employer route and company-wide training. No stable current requisition in this cut names FTY01 or 1601 North River Road.
467
Morrison Hershfield joins StantecStantec · published / observed 2024-02-09
Corporate acquisition historyfirst partydirectcurrent

Stantec's official acquisition history records Morrison Hershfield joining in February 2024. The corporate lineage supports a current-parent label; it does not prove which Stantec team owns the later FTY01 alteration work.

Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · high accuracyHigh for corporate acquisition timing and parent identity. The city permit remains controlling for the name attached to the FTY01 package.
468
Stantec · careersStantec · published / observed 2026-08-28
Current parent careers pageofficial job boarddirectcurrent

Official current careers route for the parent of permit-named Morrison Hershfield. Georgia, buildings or mission-critical roles remain regional unless Stantec identifies the FTY01 worksite or package.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the official hiring route. Corporate parentage and a Georgia opening do not establish project assignment.
469
FTY01 air-permit narrative · Building 1Georgia Environmental Protection Division · published / observed 2022-10-13
State air-permit narrativepublic recordrecordcurrent

State narrative identifies Microsoft FTY01 at 1601 North River Road and the initial 21-generator configuration: twenty 3,000 kW emergency generators and one 500 kW unit. Generator nameplate and air-permit status are not critical IT load or proof of operation.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for regulated equipment and facility identity. The permit authorizes construction and operation subject to limits; it does not establish actual generator installation, occupancy or live compute capacity.
470
FTY01 air-permit modification · Buildings 2 and 3 trailGeorgia Environmental Protection Division · published / observed 2025-02-11
State air-permit modification narrativepublic recordrecordcurrent

Application 29541 narrative records 21 generators authorized for Building 1 in 2022, 21 additional generators for Building 2 in June 2024 and a Building 3 expansion proposing twenty 3,000 kW units plus one 500 kW unit. The resulting three-building permit trail covers 63 generators; a fourth DRI building remains outside this retrieved air-permit chain.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the permit history, equipment counts and Building 3 proposal. The narrative contains the phrase 'twenty [20]' and is interpreted as 20 based on the bracketed count and GN43–GN63 sequence; installation and commissioning require separate evidence.
471
Douglas County annual financial report · Microsoft developmentDouglas County Government · published / observed 2025-12-31
County annual financial reportpublic recordrecordcurrent

County report states Microsoft is developing almost one million square feet for East US 3: four 245,000-square-foot technology facilities totaling 980,000 square feet on a 160-acre parcel at 1601 North River Road.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyHigh for the county's reported current development program and aggregate floor area. The report does not enumerate completed, commissioned or operating buildings.
472
Microsoft datacenters in Georgia · workforce factsMicrosoft Local · published / observed 2025-10-01
Owner regional workforce fact sheetfirst partydirectcurrent

Owner fact sheet forecasts about 2.1 million construction work hours and more than 510 jobs at peak activity across Douglasville, Palmetto and East Point, plus about 50 employees per operational building. These are multi-site planning figures and must not be assigned wholly to Douglasville.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for Microsoft's regional forecast, qualified for any campus allocation. The record is not payroll, current onsite headcount, a local-hire percentage or a guarantee of 50 direct Microsoft employees per building.
473
Senior Critical Environment Operations Technician · Lithia Springs metroMicrosoft Careers · published / observed 2026-08-20
Owner ATS / Atlanta location pageofficial job boarddirectcurrent

Official fully onsite role explicitly lists Palmetto, East Point and Lithia Springs. It is a verified Microsoft Atlanta-metro operations opening and a strong Douglasville-market signal, but the posting does not promise assignment to one building or campus.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for employer, role, live posting date and named Lithia Springs eligibility. Project assignment remains regional because three Georgia markets are listed.
474
Skanska USA · construction careersSkanska · published / observed 2026-08-28
Verified permit contractor careers pageofficial job boarddirectcurrent

Official hiring route for the contractor named on Douglasville permit J22-0338. Current roles must be checked for Georgia, mission-critical scope and worksite before project assignment.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the official employer route. The permit verifies Skanska's building relationship; no current requisition is assigned to FTY01 without an employer-named location or project.
475
ATL-01 Data Center · AtlantaAligned Data Centers · published / observed 2026-08-28
Owner location registerfirst partydirectcurrent

Current owner page identifies ATL-01 at 1551 North River Road and markets 24x7x365 access, onsite security, N+1 power and cooling, liquid-cooling readiness and operational certifications. It does not publish total building area, critical IT MW, live customer load or remaining expansion scope.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for address, owner-presented operating services and technical configuration. Marketing availability does not disclose occupancy, contracted load or campus-wide capacity.
476
Aligned ATL01 proposed air permit · Application 29094Georgia Environmental Protection Division · published / observed 2024-01-01
State air-permit advisorypublic recordrecordcurrent

State advisory records a proposed permit to construct, operate and maintain Aligned ATL01 at 1551 North River Road with emergency generators. The retrieved advisory does not expose the issued permit number, generator count or installation status.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for applicant, facility, address and proposed regulated activity. This advisory is not the final permit and does not establish operation or generator installation.
477
Commercial alteration J23-0594 · Aligned ATL-01City of Douglasville Building Division · published / observed 2024-02-01
City monthly building-permit registerpublic recordrecordcurrent

City register records Holder Construction Group on a 281,140-square-foot commercial alteration at 1551 North River Road with a $167 million declared value. The package area closely tracks the property's reported gross area but is not treated as a new-building area or total development spend.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for permit number, issue date, exact address, contractor, declared value and permitted area. Final inspection, occupancy, package completion and current Holder staffing remain unresolved.
478
Holder Construction · careersHolder Construction · published / observed 2026-08-28
Verified permit contractor careers pageofficial job boarddirectcurrent

Official employer route covers current opportunities across project management, field supervision, safety, scheduling, MEP and building technology. No current stable requisition in this cut names ATL-01 or 1551 North River Road.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the official employer route and career families. The city permit establishes the project relationship; current assignment requires employer confirmation.
479
Commercial alteration J24-0300 · Aligned ATL01City of Douglasville Building Division · published / observed 2025-03-05
City monthly building-permit registerpublic recordrecordcurrent

City register records Aligned Data Centers ATL Propco as applicant for a 47,104-square-foot commercial alteration at 1551 North River Road with a $3,992,912 declared value.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for permit, applicant, scope area and declared value. The alteration record does not establish total facility size, final inspection, tenant fit-out or total capital spend.
480
Electrical alteration J25-0088 · Aligned ATL01City of Douglasville Building Division · published / observed 2025-02-14
City monthly electrical-permit registerpublic recordrecordcurrent

City register records NetPlanner Systems on an electrical alteration at 1551 North River Road. The permit establishes an exact-address trade relationship but publishes no valuation, floor area, package detail or current crew count.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for permit number, date, address and named contractor. It does not prove ongoing staffing or identify the customer system being altered.
481
Aligned Energy private-land-mobile license WSIB227Federal Communications Commission · published / observed 2025-04-28
Federal ULS licensepublic recordrecordcurrent

Active FCC license ties Aligned Energy to 1551 North River Road and provides a representative facility coordinate of 33.7257222, -84.6182222. The radio license supports exact mapping and site activity, not power capacity or compute status.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for licensee, active grant, control-point address and filed coordinates. Coordinates identify the licensed facility area and are not a surveyed building centroid.
482
1551 North River Road · Q2 2023 sale transactionLee & Associates Research · published / observed 2023-06-30
Commercial property market reportreported secondarysupportingcurrent

Brokerage market report lists Aligned Data Centers acquiring the 280,140-square-foot property from The Carlyle Group for $64 million. The transaction is site-control context, not construction investment, current appraised value or facility capacity.

Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracyQualified secondary transaction record. Use deed and assessor records for controlling ownership history; do not treat acquisition price as campus capex.
483
Aligned ATL-01 · official openingsAligned Data Centers Careers · published / observed 2026-08-28
Owner Workday ATSofficial job boarddirectcurrent

Official Workday board exposes exact ATL-01 maintenance and commercial roles plus multi-site operations, design, power, compliance, training, procurement and customer-delivery positions that include ATL-01.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for live requisitions and listed eligible worksites. Multi-site roles are regional until Aligned confirms assigned home campus.
484
NetPlanner Systems · careersNetPlanner Systems · published / observed 2026-08-28
Trade contractor careers pageofficial job boarddirectcurrent

Official employer route for the exact-address electrical-alteration contractor. Current Georgia technology and structured-cabling roles remain regional unless the company names ATL-01.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the official hiring route. The permit verifies one ATL-01 package; it does not establish current project assignment for regional vacancies.
485
Aiken County Council packet · Project Wisteria FILOTAiken County Council / Teamup · published / observed 2024-12-17
Local planning / public recordpublic recordrecordcurrent

Official council packet records Project Wisteria's $22.65 million contractual minimum investment, October 15 first reading and December 17 second reading. Draft blanks in the packet mean final enactment must be corroborated separately.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.
486
Aiken–Edgefield industrial park · DCB North Augusta LLCEdgefield County · published / observed 2025-08-12
Local planning / public recordpublic recordrecordcurrent

Executed county agreement identifies DCB North Augusta LLC as the company formerly known as Project Wisteria and records Aiken County Ordinance 25-01-01 enacted January 7, 2025. It confirms the incentive entity and park structure, not construction completion.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed or approved scope; approval does not prove completion.
487
Public-media transcript · DC BLOX North Augusta construction testimonySouth Carolina ETV / PBS · published / observed 2026-04-03
Reported legislative testimonypublic recordsupportingcurrent

SCETV transcript quotes DC BLOX EVP Chris Gatch stating the company was building a $75 million network-focused data center on Atomic Road. This reported legislative testimony is strong current-status evidence but the investment conflicts with the earlier $22.65 million FILOT minimum and requires permit- or owner-level reconciliation.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyQualified transcript of attributed public testimony; recheck the underlying filing, permit or owner update before treating the stated cost or phase as final.
488
How DC BLOX is Elevating Digital Infrastructure in the SoutheastDC BLOX · published / observed 2026-03-01
Owner / contractor disclosurefirst partydirectcurrent

Current owner portfolio map includes North Augusta among operating, under-construction and planned markets. The portfolio graphic does not independently disclose this site's parcel, capacity, contractor or precise phase.

Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for what the named organization disclosed; delivery still requires milestone corroboration.
489
Apprenticeships and Pre-ApprenticeshipsAiken Technical College · published / observed 2026-08-28
Workforce / training systemeducation workforcesupportingcurrent

Current college route includes employer-led registered HVAC and industrial-maintenance apprenticeships combining paid work with technical instruction. Employer participation, intake and DC BLOX linkage require confirmation.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
490
SC Works · statewide job and employer servicesSouth Carolina Department of Employment and Workforce · published / observed 2026-08-28
Workforce / training systemeducation workforcesupportingcurrent

Official statewide system provides job search, center navigation, training and employer recruiting services across all 46 counties. Search Aiken, North Augusta and Atomic Road, then verify every employer and worksite relationship.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for program facts; project relevance is supporting unless the partnership is explicit.
491
Aiken County · commercial permit and development-project searchAiken County Planning & Development · published / observed 2026-08-28
Local permit portalpublic recordsupportingcurrent

County page routes unincorporated Aiken projects to Citizenserve searches for commercial permits, development projects, parcel, address and status. The public search is reCAPTCHA-protected; no Project Wisteria or CLOP permit number was retrieved in this review.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for the county's permitting jurisdiction and available search fields; project-specific permit scope remains unverified because no result was retrieved.
492
Data center pros and cons in the CSRAAugusta Business Daily · published / observed 2026-06-03
Local business reportingreported secondarysupportingcurrent

Local business reporting identifies Oppidan as the builder of a $32 million, 60,000-square-foot data center on the west side of Bettis Academy Road in Sage Mill Industrial Park. Construction status, capacity, employment and contractor packages still require county- or owner-level corroboration.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyQualified local reporting; recheck the FILOT, parcel, building permit and owner milestone before treating cost, area or phase as final.
493
CLOP Aiken SC LLC · legal-entity recordBloomberg LEI · published / observed 2025-09-15
Legal-entity register mirrorreported secondarysupportingcurrent

GLEIF-backed record identifies active Delaware entity CLOP Aiken SC LLC and its Excelsior, Minnesota headquarters address. The address aligns with Oppidan's official headquarters, supporting entity resolution without proving site control, permits or construction.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyQualified entity metadata from a GLEIF-backed mirror; legal-entity identity is strong, while the inferred Oppidan relationship still requires project-record corroboration.
494
Registered Qualifying Data Centers and Large Data Center ProjectsTexas Comptroller of Public Accounts · published / observed 2026-08-28
State tax qualification registerpublic recordrecordcurrent

Statewide register separates facility, effective date, legal owner, occupant and operator. It identifies LBB01 as owned by Aligned Data Centers (Abernathy) Propco, occupied by Lambda Procurement and operated by Lambda; Fluidstack Abernathy as owned and operated by FS AB with Anthropic as occupant; and EDC AUSTIN, LLC as owner, occupant and operator of its large project effective January 9, 2026. Registration is not proof of construction, address, capacity or active hiring.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the state-published registration fields and legal roles at the observation date; corroborate site, phase, capacity and employment from permits, filings, owners and job boards.
495
Aligned breaks ground on Project CaprockAligned Data Centers · published / observed 2026-04-09
Owner construction milestonefirst partydirectcurrent

Owner announcement places the 540 MW, 313-acre, six-facility campus outside Abernathy; identifies LBB-01 as the first facility with a Q1 2027 service target; names Ryan Companies as a construction partner; and states that the multi-year buildout will create thousands of construction jobs and local vendor contracts without publishing a numeric permanent-job total.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for Aligned's announced scope, location, partner and target date; delivery, job totals and later phases require permit, inspection and updated owner corroboration.
496
LBB-01 · Abernathy campusAligned Data Centers · published / observed 2026-08-28
Owner facility registerfirst partydirectcurrent

Current owner facility page publishes LBB-01 at 1498 County Road 315, Abernathy, Texas 79311 and describes its power, cooling, security and operating design. Marketing availability does not establish commissioning completion or vacancy availability.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the owner-published address and facility design at review; recheck construction, service and occupancy milestones independently.
497
TeraWulf Form 10-Q · Abernathy Joint VentureU.S. Securities and Exchange Commission · published / observed 2026-08-08
SEC filingpublic recordrecordcurrent

Filed quarterly report states the Abernathy joint venture was formed to construct and operate a 168 MW critical-IT campus; documents $1.3 billion of construction financing and site-preparation, design and construction-management agreements; and records TeraWulf's July 6, 2026 sale of its full 50.1% interest to Fluidstack and other purchasers.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for filed corporate, financing and ownership facts through June 30 plus the disclosed July sale; current field progress and post-sale control require newer operator or permit evidence.
498
Anthropic invests $50 billion in American AI infrastructureAnthropic · published / observed 2025-11-12
Occupant infrastructure announcementfirst partydirectcurrent

Anthropic names Fluidstack as its Texas and New York data-center partner and gives program-wide estimates of approximately 800 permanent and 2,400 construction jobs. Gridwork does not allocate those multi-state totals to Abernathy without a site-specific disclosure.

Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · qualified accuracyHigh for the partnership and program-wide estimates; qualified for Abernathy because the announcement does not name individual sites or allocate jobs.
499
Fluidstack · current Abernathy openingsFluidstack / Ashby · published / observed 2026-08-28
Official ATS / job boardofficial job boarddirectdue soon

Official structured feed returned two current exact-Abernathy openings: Staff Electrical Operator and Staff Mechanical Operator. Older search-engine snippets with Abernathy among multiple locations were excluded because those records are no longer listed that way in the live feed.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for titles and exact location at the observation time; roles may close or change without notice and the board does not print an internal building assignment.
500
Electrical and Power Transmission TechnologySouth Plains College · published / observed 2026-08-28
Regional technical educationeducation workforcesupportingcurrent

Regional program teaches commercial and industrial wiring, power distribution, motor controls, PLCs, electrical safety and NEC practice through certificate and associate-degree pathways. No Caprock or Fluidstack placement agreement is asserted.

Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for current curriculum and credentials; project relevance is skills-based unless an employer partnership is later published.
501
Heating, Air Conditioning and Refrigeration TechnologySouth Plains College · published / observed 2026-08-28
Regional technical educationeducation workforcesupportingcurrent

Regional HVAC pathway covers electrical systems and controls, refrigeration, airflow, heat pumps, troubleshooting and EPA 608 preparation. It is a feeder route, not a disclosed data-center placement program.

Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for current curriculum and credentials; confirm enrollment, campus and employer use directly with the college.
502
Aligned and Lambda partner at DFW-04Aligned Data Centers · published / observed 2025-05-07
Owner / occupant announcementfirst partydirectcurrent

Owner announcement identifies Lambda as the future DFW-04 occupant and says the Plano facility was under construction for high-density liquid-cooled GPU infrastructure. It does not disclose a completion date, employment count or contractor roster.

Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for the named relationship and May 2025 construction status; current phase requires later filed or owner evidence.
503
DFW-04 · Plano facility registerAligned Data Centers · published / observed 2026-08-28
Owner facility registerfirst partydirectcurrent

Current owner portfolio page lists DFW-04 at 601 North Star Road, Plano, on a 44-acre campus with Tier III design, 24/7 accessibility and high-density air/liquid cooling. Marketing availability does not by itself prove fit-out completion or customer service.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for current owner-published address and facility attributes; verify delivery and occupancy through inspections, filings and later milestones.
504
DFW04-2 · TABS2025015383Texas Department of Licensing and Regulation · published / observed 2025-03-28
State construction registrationpublic recordrecordcurrent

State accessibility registration covers a privately funded $120 million, 190,550-square-foot tenant fit-out at 601 North Star Road, with a June 2025 start, August 2026 scheduled completion, Aligned as owner and Corgan as design firm. Registered dates are plans, not inspection or completion evidence.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for filed scope, address, owner, designer and scheduled dates; the TABS record explicitly remains a registration rather than proof of field completion.
505
DFW04 TFO · TABS2025024707Texas Department of Licensing and Regulation · published / observed 2025-07-30
State construction registrationpublic recordrecordcurrent

Separate state registration covers a $120 million, 169,600-square-foot data-hall tenant fit-out at the same address, scheduled October 2025 through December 2026, with Aligned as owner and Corgan as design firm. Gridwork does not add the two $120 million registrations because package overlap has not been ruled out.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for this filed package and schedule; avoid summing it with the earlier registration until contract/package boundaries are resolved.
506
Infrastructure Track · Datacenter Technician Level 1 CertificateCollin College · published / observed 2026-08-28
Local technical educationeducation workforcesupportingcurrent

Local 21-credit certificate prepares learners for data-center and network hardware work through hands-on infrastructure coursework and industry-certification preparation. No Aligned or Lambda placement agreement is disclosed.

Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for current program structure; employer linkage and current enrollment availability require direct confirmation.
507
Construction Technology · ElectricalCollin College · published / observed 2026-08-28
Local technical educationeducation workforcesupportingcurrent

Local certificate and AAS pathways teach electrical installation, testing, troubleshooting and repair; students can earn up to 414 on-the-job hours toward Texas licensure requirements. No DFW-04 placement relationship is asserted.

Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for the college-published credentials and licensure pathway; verify current sections, prerequisites and employer use directly.
508
Plano Workforce CenterWorkforce Solutions for North Central Texas · published / observed 2026-08-28
Public workforce systemeducation workforcesupportingcurrent

Official workforce-board locator confirms a Plano center serving Collin County with job-seeker and employer services. It is a public matching route, not proof that DFW-04 employers have placed orders with the center.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for current center coverage; individual employer listings and project assignments must be verified at application time.
509
Project Blue FAQPima County · published / observed 2026-08-28
County project hubpublic recordrecordcurrent

County project hub for the 290-acre site north of the Pima County Fairgrounds. It describes a four-building first phase, up to ten buildings at full buildout, a possible 2027 first opening and economic-model estimates for construction and permanent employment.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for county-held site, agreement and process facts. Building count, timing and employment figures are plans or model outputs rather than completed deployment or verified hiring.
510
Project Blue Progress Update and Permit InventoryPima County Administrator's Office · published / observed 2026-04-23
County permits and administrator memospublic recordrecordcurrent

County memo records the June 2025 specific-plan and land actions, December 2025 land-sale closing and Project Blue permit history through March 2026. The inventory includes issued site-construction, capacity-letter and related approvals, plus open or correction-stage right-of-way and revision records.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for the dated county inventory and listed permit statuses. Recheck the live permit system because corrections, withdrawals, inspections and later vertical permits can change phase interpretation.
511
Project Blue Fugitive-Dust Notice and Ames ResponsePima County Department of Environmental Quality · published / observed 2026-05-12
County environmental enforcementpublic recordrecordcurrent

County enforcement correspondence and the contractor response identify Ames Construction at 11295 S Harrison Road under fugitive-dust permit P25FD0278. The response describes active site preparation, temporary suspension of major earthwork after loss of a water source, native-plant work and corrective dust-control measures.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for the named contractor, address, permit and May 2026 field conditions. The record proves civil/site activity, not a vertical general-contractor award or current operating status.
512
Proposed Project Blue Community Benefits Memorandum of AgreementPima County Administrator's Office · published / observed 2025-12-10
County board and agreement recordspublic recordrecordcurrent

Board memo presents a proposed agreement with Humphrey's Peak Properties covering closed-loop air cooling, renewable-energy reporting and $15 million in education and workforce donations, including an initial $5 million for STEM scholarships and trade schools.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyThe memo and attached draft are official, but this evidence cut does not establish board adoption or a fully executed agreement. Treat every listed benefit as proposed until a signed record is retrieved.
513
ACC Approves Project Blue Electric-Service AgreementArizona Corporation Commission · published / observed 2025-12-09
Utility commission docketspublic recordrecordcurrent

Commission statement records the December 3, 2025 approval of Tucson Electric Power's special contract for Project Blue, developed by Beale Infrastructure and affiliate Humphrey's Peak Power LLC. The initial service request is described as 286 MW in the commission record set.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for commission approval and named parties. Approved service capacity is infrastructure evidence, not proof that the full load has been built or energized.
514
Beale and TEP Pursue Energy Resources for Southern Arizona GrowthBeale Infrastructure · published / observed 2025-07-31
Developer disclosuresfirst partydirectcurrent

Developer statement identifies Beale's Project Blue role, a planned $3.6 billion investment, more than 3,180 modeled construction jobs, TEP coordination and a possible 2027 first phase. The operating customer is not disclosed.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for Beale's role and stated plan; investment, jobs and delivery remain forward-looking until spending, payroll or operating milestones are independently verified.
515
Ames Construction Open Positions · Tucson SearchAmes Construction · published / observed 2026-08-28
Official contractor ATSofficial job boarddirectdue soon

Official Workday board showed 101 company openings and one current Tucson-capable Project Manager record. The posting lists several Arizona locations and does not name Project Blue.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the observed official requisition. Location eligibility is regional and must not be read as a Project Blue assignment; recheck before applying.
516
Tucson Electric Power Careers · Tucson InventoryTucson Electric Power · published / observed 2026-08-28
Official utility ATSofficial job boarddirectdue soon

Official Workday board showed 17 current Tucson roles. Four construction, material, equipment and T&D records are normalized as regional utility signals because none names Project Blue.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the observed TEP records and displayed deadlines. The commission-approved utility relationship does not make any Tucson requisition project-assigned.
517
Building and Construction Technology PathwaysPima Community College · published / observed 2026-08-28
Local technical educationeducation workforcesupportingcurrent

Local routes include electrician, HVAC-R, plumbing and construction credentials, plus fast-track programs. The college's April 2026 center expansion adds commercial and industrial HVAC, refrigeration and heavy-equipment training.

Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for college-published programs and facilities. No Project Blue placement agreement or employer-sponsored cohort is asserted.
518
ARIZONA@WORK · Pima County Job AssistancePima County · published / observed 2026-08-28
Public workforce systemeducation workforcesupportingcurrent

Public workforce route for job matching, resume support, training referrals, employer services and on-the-job training in Pima County. No Project Blue employer order or placement channel is verified.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for current county services; specific openings, funding eligibility and employer participation require direct confirmation.
519
Mesa Data Centers · Official GIS Feature LayerCity of Mesa · published / observed 2026-08-28
Municipal planning GISpublic recordrecordcurrent

Live city layer returned 15 data-center records with exact coordinates, addresses, planning or permit case numbers, and statuses ranging from pending planning through construction complete. It includes codenames and confidential projects that do not appear in owner press releases.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the city-published address, case identifiers and displayed status at observation time. A GIS status is not proof of current field activity, occupancy or a disclosed operating customer; query the linked cases before advancing a phase.
520
FY2025 Annual Report · Computer Data Center Tax Incentive ProgramArizona Commerce Authority · published / observed 2025-11-01
State incentive registerpublic recordrecordcurrent

State report names seven FY2025 pre-approved applicants and two post-approved applicants. Minimum statutory investment is reported at applicant level; actual project allocation is confidential and must not be assigned to a particular facility without corroboration.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for applicant identity and minimum statutory threshold. Certification or post-approval does not reveal a facility address, actual spend at one site, construction progress, capacity or hiring.
521
Phoenix PH1 Data CenterNTT Global Data Centers · published / observed 2026-08-28
Owner facility portfoliofirst partydirectcurrent

Owner page identifies 10256 E. Elliot Road, a 102-acre Mesa campus planned for seven buildings and 240 MW, with PH1 providing 36 MW and a 24/7 in-house security and operations team.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for NTT's current published campus and PH1 specifications. The seven-building plan is buildout capacity, not proof that every building is complete or energized.
522
NTT Global Data Centers CareersNTT Global Data Centers · published / observed 2026-08-28
Official owner ATSofficial job boarddirectdue soon

Official Workday route for global data-center construction, commissioning, operations, engineering and corporate roles. No current Mesa requisition is normalized in this cut.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the official employer route. Re-enumerate daily and require Mesa or a defensible campus identifier before project matching.
523
Mesa, We Are OnlineMeta Data Centers · published / observed 2025-01-30
Owner operating milestonefirst partydirectcurrent

Owner milestone says the Mesa campus is serving traffic, supports more than 200 operational jobs, averaged 2,000 skilled trades workers at peak construction and will represent more than $1 billion when fully built out. DPR Construction and Salt River Project are named partners.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for the operating milestone and named partners. The investment is a full-buildout statement and employment counts are owner-reported baselines, not a current vacancy inventory.
524
Phoenix Data Centers · Mesa CampusEdgeCore Digital Infrastructure · published / observed 2026-08-28
Owner facility portfoliofirst partydirectcurrent

Owner portfolio describes an 84-acre Mesa campus planned for five data centers, 2.7 million square feet and 496 MW of critical IT load using closed-loop air cooling.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for current owner-published campus design. Totals describe planned campus capability; the city GIS separately establishes only that a permit is issued for the listed address.
525
EdgeCore CareersEdgeCore Digital Infrastructure · published / observed 2026-08-28
Official owner careersofficial job boarddirectdue soon

Official owner route for development, construction, engineering and operations roles. No exact Mesa detail record is normalized in this snapshot.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the current career route; openings need daily re-enumeration and location-level matching.
526
Edged Opens Waterless AI-Ready Mesa Data CenterEdged U.S. · published / observed 2026-04-02
Owner operating milestonefirst partydirectcurrent

Owner operating milestone identifies the 36 MW Mesa facility, Haydon Companies as local general contractor, Salt River Project as utility partner and Light Source Communications as the first network provider.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for opening, capacity and named partners as disclosed by the owner. Current staffing, vacancies and awarded follow-on packages require separate evidence.
527
PHOENIX PHX · Mesa Data SheetEdgeConneX · published / observed 2025-11-05
Owner facility portfoliofirst partydirectcurrent

Official data sheet identifies EdgeConneX's Mesa presence on Elliot Road. The city GIS provides the current 3203 S. Hawes Road permit record; the documents are related at city/operator level without assuming a completed build.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for EdgeConneX's Mesa market presence. The data sheet and city permit do not by themselves prove current field activity or a live customer deployment at the new address.
528
Phoenix Data Center · MesaComarch · published / observed 2026-08-28
Owner facility portfoliofirst partydirectcurrent

Current owner facility page identifies the 3223 S. Ellsworth Road Mesa data center and its North and South American service role. A separate company record names Weitz as construction contractor.

Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for current address and operating facility identity. The page does not publish present headcount or a complete vacancy inventory.
529
Comarch Phoenix CareersComarch · published / observed 2026-08-28
Official owner careersofficial job boarddirectdue soon

Official Phoenix/Mesa career page and facility contact. One current sales record is visible, but no current data-center operations opening is normalized.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the official location board. An older Data Center Engineer page is explicitly outdated and is not presented as an opening.
530
Apple Environmental Progress Report 2024 · Mesa Data CenterApple · published / observed 2026-08-28
Owner environmental reportingfirst partydirectcurrent

Apple reports that its Mesa global command data center came online in 2016 and began serving customers in March 2017, with operational control taken in October 2015.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for Apple's operating history. The report is a 2024 publication and does not establish current hiring or later expansion activity.
531
Apple Careers · Mesa SearchApple · published / observed 2026-08-28
Official owner ATSofficial job boarddirectdue soon

Official search returned 28 Mesa-filtered records. Four current exact-Mesa data-center operations, controls, BIM and mechanical project roles are normalized; retail and unrelated records are excluded.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the four observed Apple detail records. Recheck daily because search totals and posting availability change without notice.
532
CyrusOne CareersCyrusOne · published / observed 2026-08-28
Official owner careersofficial job boarddirectdue soon

Official company route to the current opportunity portal. No exact 3255 S. 96th Street or Mesa requisition is normalized in this cut.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the employer route; enumerate the ATS daily and require a Mesa identifier for local matching.
533
Certificate of Completion in Data Center OperationsMesa Community College · published / observed 2026-08-28
Local technical educationeducation workforcesupportingcurrent

Current 22-credit 2026–27 certificate prepares learners for entry-level mechanical, electrical and controls technician work, including PLCs, motors, power distribution, preventive maintenance and safety.

Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for the college-published pathway. Course availability, admission and employer placement require direct confirmation; no project-specific placement guarantee is asserted.
534
Workforce Center @ MesaCity of Mesa · published / observed 2026-08-28
Municipal workforce systemeducation workforcesupportingcurrent

City workforce center offers job search, occupational training, apprenticeships, hiring events, candidate matching and employer recruiting support in partnership with ARIZONA@WORK.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for current public services. Employer participation and project-specific job orders must be verified for each hiring event or referral.
535
Haydon Companies CareersHaydon Companies · published / observed 2026-08-28
Official contractor careersofficial job boarddirectdue soon

Official Arizona contractor route for craft, building, civil, internship and professional opportunities. Edged identifies Haydon as the Mesa facility general contractor; current roles remain regional unless the worksite is named.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the official career route and owner-verified relationship. Recheck current positions daily and verify assigned project before applying.
536
Salt River Project CareersSalt River Project · published / observed 2026-08-28
Official utility careersofficial job boarddirectdue soon

Official utility route spanning engineering, skilled trades, power systems, IT and operations. SRP is named on the Meta and Edged Mesa projects; no current requisition is assigned to either campus in this cut.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the current utility career route. Project matching requires the employer to name a worksite, project or defensible infrastructure package.
537
Goodyear data-center company registerCity of Goodyear · published / observed 2026-08-28
Municipal economic-development registerpublic recordrecordcurrent

City inventory names Compass, Microsoft, Stream and Vantage in Goodyear. Gridwork uses it as jurisdiction-level discovery evidence, then checks current owner and agreement records facility by facility.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyStrong for companies publicly identified by the city, but the page is not a complete parcel or permit ledger and does not prove current phase by itself.
538
Compass Data Center development agreementCity of Goodyear · published / observed 2026-08-28
Municipal development-agreement portalpublic recordrecordcurrent

Live city portal marks the Compass agreement Executing from July 2019 through July 2034. The portal tracks agreement administration, not building completion.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for agreement status and dates. The record does not measure construction percent, operating capacity or current hiring.
539
Microsoft PHX 10–11 infrastructure agreementCity of Goodyear · published / observed 2026-08-28
Municipal development-agreement portalpublic recordrecordcurrent

Live city record describes Microsoft-owned water, wastewater and industrial-discharge infrastructure and an executing agreement through 2030. A portal progress percentage is administrative, not physical completion.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the agreement scope, status and dates; qualified for field phase because the city portal is not a construction-progress system.
540
Microsoft PHX 70 infrastructure agreementCity of Goodyear · published / observed 2026-08-28
Municipal development-agreement portalpublic recordrecordcurrent

Live city record covers roughly 145 acres southeast of Citrus Road and Indian School Road, an executing agreement through 2040 and current on-track administrative status.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for filed location, agreement status and described infrastructure conditions. It does not establish installed IT load or building-by-building completion.
541
PHX 10–11 infrastructure agreement amendment packetCity of Goodyear · published / observed 2023-03-06
City council packetpublic recordrecordcurrent

Council packet places the campus on 279 acres between Broadway and MC-85 and records PHX11 nearing completion while PHX12 permitting was requested in 2023.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the 2023 filed boundaries and amendment context. Historical construction language must not be presented as the current building phase without a later record.
542
Understanding Microsoft datacenters in West ValleyMicrosoft Local · published / observed 2026-08-28
Owner local-impact pagefirst partydirectcurrent

Current owner page says Microsoft operates datacenters in El Mirage and Goodyear, is building new West Valley facilities and projects 763 employees and contractors across operational Arizona facilities by the end of 2026.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for owner identity and metro-wide operating/building language. The workforce projection is not allocated to a facility and is not a vacancy count.
543
Microsoft datacenters in ArizonaMicrosoft · published / observed 2025-10-01
Owner workforce fact sheetfirst partydirectcurrent

Owner fact sheet reports roughly 430 facility workers in 2025 and about 8.4 million construction hours with more than 2,050 peak construction jobs across new Arizona work.

Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · qualified accuracyOwner estimates are metro/state aggregates and subject to change. They are not current openings and cannot be assigned to a single campus.
544
Microsoft announces three West Valley campusesCity of Goodyear · published / observed 2019-07-30
Municipal project announcementpublic recordrecordcurrent

Contemporaneous city announcement describes two Goodyear campuses and a 150-acre El Mirage campus at CenterPoint Logistics Park with an initial 254,000-square-foot building.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for the announced 2019 site program. Job and construction figures were forward-looking at publication and are not treated as current.
545
Microsoft Datacenter AcademyGlendale Community College · published / observed 2026-08-28
Employer-college academyeducation workforcesupportingcurrent

Current college page documents hands-on server, storage and network labs, industry-certification preparation, scholarships and eligibility to apply for Microsoft internships.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the published learning route. Internship eligibility is not acceptance, placement or a project-specific employment guarantee.
546
ARIZONA@WORK Maricopa County locations and servicesARIZONA@WORK · published / observed 2026-08-28
Public workforce systemeducation workforcesupportingcurrent

Official network lists the Goodyear partner site and West Valley Career Center and connects residents and employers to job matching, hiring events, training referrals and paid-work pathways.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for public services and locations. A listing does not establish any exclusive campus intake, seat count or placement outcome.
547
Compass Phoenix market portfolioCompass Datacenters · published / observed 2026-08-28
Owner market portfoliofirst partydirectcurrent

Current owner page markets developing Phoenix sites at 212 MW in Goodyear and 108 MW in El Mirage.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for current marketed development scope. Marketed megawatts are planned campus figures, not proof of energized capacity, completed buildings or a local opening.
548
Compass selects Goodyear campusCity of Goodyear · published / observed 2019-03-07
Municipal project announcementpublic recordrecordcurrent

City announcement identifies a 225-acre site northwest of Bullard and Yuma and an original eight-building concept. Gridwork defers to the current owner page for marketed MW.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for the announced site and original concept. The older 350 MW plan is superseded in this register by the owner's current 212 MW market page.
549
Phoenix data center campusStream Data Centers · published / observed 2026-08-28
Owner campus pagefirst partydirectcurrent

Current owner page identifies 2950 S Litchfield Road, one tenant-serving 40 MW building, PHX II in development and seven planned facilities totaling 280 MW at full build.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for address, owner-stated live first building and current campus program. Full-build MW and building count remain forward-looking.
550
The truth about data center talentStream Data Centers · published / observed 2026-08-28
Owner workforce forecastfirst partydirectcurrent

Owner workforce essay describes a seven-building, 10–12-year Goodyear build with an estimated 500–2,000 people onsite daily during construction.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyForward-looking workforce range, not observed headcount or vacancies. Recheck as later buildings and contractor packages are identified.
551
Phoenix data center campusVantage Data Centers · published / observed 2026-08-28
Owner campus pagefirst partydirectcurrent

Current owner page places the campus at 45 S Bullard Avenue and describes five facilities, 176 MW and more than one million square feet once developed, with building five in progress.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for address and current owner-stated expansion. Full-campus scale is a buildout figure; it is not installed power or a vacancy count.
552
Vantage begins Phoenix campus phase twoCity of Goodyear · published / observed 2022-05-24
Municipal construction milestonepublic recordrecordcurrent

City milestone names McCarthy as general contractor for phase two; Vantage's earlier topping-out record names Layton on the first facility.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for the named phase-two builder and 2022 milestone. It does not prove either firm holds a current unannounced package or opening.
553
DCX Goodyear 1 becomes operationalCity of Goodyear Economic Development · published / observed 2022-10-19
Municipal operating milestonepublic recordrecordcurrent

City milestone records DCX GYR1 operational with 6 MW and two suites online, names TBL Mission Critical for infrastructure operations and Cox Business for connectivity.

Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for the 2022 operating milestone and named partners. Expansion capacity was prospective and current status is checked against DCX directly.
554
DCX-GYR1 current facility pageDCX · published / observed 2026-08-28
Owner facility pagefirst partydirectcurrent

Current owner page labels Goodyear online and move-in ready with 6 MW total ITE power, high-density racks, three fiber networks and zero-water operation.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for current owner-stated availability and specifications. Move-in ready is a commercial availability claim and does not disclose occupancy or hiring.
555
Data centers in Buckeye: fact vs. fictionCity of Buckeye · published / observed 2026-08-28
Municipal current-status pagepublic recordrecordcurrent

Current city status page says no data center is operating, under construction or actively permitting in Buckeye. It separately identifies the Buckeye Tech Corridor and the former hydrogen-hub site as possible future locations, and says Grand View is not primarily a data-center proposal.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the city's current permit and operating-status statement and its characterization of candidate sites. Recheck frequently because a first building application would immediately change the lifecycle picture.
556
Buckeye Tech Corridor comprehensive master plan · PLZZ-23-00005City of Buckeye · published / observed 2024-01-01
Municipal planning packetpublic recordrecordcurrent

Official planning packet for the former Cipriani master plan establishes the technology and employment land-use process and the requirement for a development agreement. It is entitlement evidence, not a building permit or construction start.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the filed planning case and land-use process. Later agreements and permit records control current obligations and physical phase.
557
Buckeye Technology ParkTract · published / observed 2026-08-28
Owner project registerfirst partydirectcurrent

Current owner page labels the park owned and in development and markets 2,019 acres, 1,800 MW and 22 parcels. These are land-development and planned-capacity figures, not energized load or a data-hall construction milestone.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for current owner identity, acreage and marketed plan. Capacity, parcel count and development status remain owner-reported and must be reconciled with utility, permit and delivery records.
558
Tract closes Buckeye land acquisitionTract · published / observed 2024-08-28
Owner acquisition announcementfirst partydirectcurrent

Historical acquisition record identifies Cipriani Holdings as seller and describes an anticipated program of as many as 40 individual data centers and utility work up to 1.8 GW. The current owner page supersedes its acreage figure.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for the 2024 acquisition and then-stated concept. Building count and power were forward-looking; current acreage is taken from Tract's live project page.
559
FY2027 recommended budget · development inspection workloadCity of Avondale · published / observed 2026-04-20
Municipal budget and staffing recordpublic recordrecordcurrent

City budget classifies Prime Data Center as ongoing construction-inspection workload and Hermosa Tech Park, including the QTS data center and infrastructure, as upcoming work. This is a current municipal lifecycle distinction, not a building-level permit inventory.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the city's ongoing-versus-upcoming classification as of budget preparation. Individual building permits, inspections and occupancy records remain the controlling granular evidence.
560
FY2025 annual budget · economic-development highlightsCity of Avondale · published / observed 2024-07-01
Municipal economic-development budgetpublic recordrecordcurrent

City economic-development record identifies Prime Data Centers and a 1.3-million-square-foot campus with an adjacent commercial site. Later owner and builder records control the current building count and phase.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for the city's attraction record. The document predates the 2026 groundbreaking and is not used as current field-progress evidence.
561
Avondale monthly building permit reportsCity of Avondale · published / observed 2026-08-28
Municipal permit ledgerpublic recordrecordcurrent

Official monthly PDF and spreadsheet register is the refresh route for applicant, address, permit type, valuation and issuance evidence. The current project cut still needs a complete multi-month parcel-level reconciliation.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for issued entries in each monthly report. Project identity can require address, parcel and legal-entity reconciliation; absence from one month is not evidence of no project.
562
STACK PHX01 · AvondaleSTACK Infrastructure · published / observed 2026-08-28
Owner campus pagefirst partydirectcurrent

Current owner page markets PHX01 at 225 MW on 100 acres in Avondale. It does not publish building-by-building commissioning or occupancy status.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for current owner, market, acreage and marketed critical capacity. Operating versus expansion phase remains qualified until occupancy, commissioning or owner milestone records are reconciled.
563
STACK PHX01 Avondale facility recordDEPLOY · published / observed 2026-08-28
Sourced facility registry and satellite reviewreported secondarysupportingcurrent

Independent facility registry labels PHX01 operating and preserves dated satellite imagery. Gridwork keeps the operating label qualified because the current owner page does not publish building-level commissioning or occupancy.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyUseful independent operating-status evidence with source-level traceability, but not a municipal certificate of occupancy or owner commissioning notice. Reconcile against permits and owner milestones.
564
STACK launches Avondale flagship campusSTACK Infrastructure · published / observed 2020-06-03
Owner project announcementfirst partydirectcurrent

Contemporaneous owner record documents the original 79-acre acquisition, more than 150 MW of planned capacity and one million square feet of buildout. The current campus page supersedes these scale figures.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · qualified accuracyHigh for the 2020 acquisition and original plan. It is historical and does not establish current commissioned capacity, occupancy or hiring.
565
Prime Phoenix Campus PHX01Prime Data Centers · published / observed 2026-08-28
Owner campus and building registerfirst partydirectcurrent

Current owner campus page identifies five 48 MW buildings, 240 MW total critical power, 66.5 acres, 1.3 million square feet, SRP service and an onsite substation. PHX01-01 through -04 are labeled construction and PHX01-05 development.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · qualified accuracyHigh for current owner-published building specifications and commercial status. Construction labels are not percentages complete, and full-campus MW is planned rather than energized load.
566
Prime breaks ground on first three PHX01 buildingsPrime Data Centers · published / observed 2026-05-21
Owner construction milestonefirst partydirectcurrent

Owner milestone documents construction start for the first three 267,000-square-foot, 48 MW buildings; all three are leased to an undisclosed hyperscaler. It reports phase one of the 250 MW substation commissioned and a $3B-plus planned investment.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for groundbreaking, initial building scope and owner-reported substation milestone. Investment and future campus capacity remain program figures, not audited spend or energized tenant load.
567
ARCO/Murray · Prime Avondale groundbreakingARCO/Murray · published / observed 2026-06-01
Named builder project milestonefirst partydirectcurrent

Builder record names ARCO for major site development, underground coordination, private-substation coordination and core-and-shell construction on the first three PHX01 buildings.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for ARCO's disclosed scope on buildings one through three. It does not assign later buildings or every trade package to ARCO.
568
Prime Data Centers · Avondale openingsPrime Data Centers · published / observed 2026-08-28
Official owner ATSofficial job boarddirectdue soon

Current owner board exposes two exact-Avondale construction records: Construction Project Manager and Construction Scheduler. Older indexed Avondale roles no longer visible on the live board are excluded.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for titles and exact city observed on the current official board. Openings can change daily; recheck the detail or employer list before applying.
569
Hermosa Ranch Technology Campus North council packetCity of Avondale · published / observed 2024-05-06
Municipal council and zoning packetpublic recordrecordcurrent

Official council packet establishes a data-center campus and supporting commercial development at the southwest corner of Avondale Boulevard and Lower Buckeye Road. Later city budget records identify QTS and classify the project as upcoming.

Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for entitlement geography and approved planning context. The packet does not establish current vertical construction, installed MW or an operating date.
570
QTS data center portfolioQTS Data Centers · published / observed 2026-08-28
Owner portfolio registerfirst partysupportingcurrent

Current QTS portfolio lists Phoenix 2 and Phoenix 3 as in development. Gridwork uses the City of Avondale budget and Hermosa Ranch packet—not the portfolio naming alone—to identify the separate Avondale campus.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for QTS's current Arizona development portfolio. The public portfolio does not clearly map the Phoenix code to Hermosa Ranch, so no code or MW is inferred for the Avondale record.
571
Aligned breaks ground on PHX-13 in GlendaleCity of Glendale · published / observed 2025-04-15
Municipal economic-development milestonepublic recordrecordcurrent

City milestone records the PHX-13 groundbreaking, 72 MW, four planned facilities on 100 acres, closed-loop cooling and an APS 230 kV transmission connection.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the dated groundbreaking, disclosed PHX-13 scale and city-described campus plan. It does not establish current percent complete, energized load or occupancy.
572
Aligned Phoenix data centersAligned Data Centers · published / observed 2026-08-28
Owner facility portfoliofirst partydirectcurrent

Current owner portfolio identifies PHX-07 at the Glendale/Waddell campus. Owner construction material separately identifies PHX-13 and the planned PHX-12 and PHX-14 facilities.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for owner identity and current facility naming. Commercial availability does not disclose occupancy, commissioned MW or completion of later facilities.
573
PHX-13 data centerLease Crutcher Lewis · published / observed 2026-08-28
Named builder project pagefirst partydirectcurrent

Named builder page confirms the Lewis–GCON joint venture and a two-story, 445,000-square-foot, 72 MW facility delivered across two phases.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the named construction team and disclosed PHX-13 scope. It does not assign every subcontract or certify current field completion.
574
Glendale monthly permit reportsCity of Glendale · published / observed 2026-08-28
Municipal permit ledgerpublic recordrecordcurrent

Official index for monthly issued-permit reports. Gridwork reconciled January through July 2026 entries for Aligned and QTS; one-month absence is never treated as evidence of no project.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for issued entries, declared valuations, addresses and named applicants. Valuation is package value rather than total project spend; entity and address reconciliation can still be required.
575
QTS Phoenix 3QTS Data Centers · published / observed 2026-08-28
Owner campus and building registerfirst partydirectcurrent

Current owner page labels Phoenix 3 in development and exposes five Glendale building addresses: DC1, DC2, DC9, DC13 and DC14.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · qualified accuracyHigh for owner identity, current development label and published building addresses. The page does not establish full-campus building count, commissioned capacity or individual completion dates.
576
FY2025–26 annual budget · development highlightsCity of Glendale · published / observed 2025-07-01
Municipal budget and economic-development recordpublic recordrecordcurrent

City budget highlights Aligned and classifies the 400-acre QTS campus as under construction. Building-level phase is reconciled against monthly permit entries and the owner register.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for the city's project identity, acreage and under-construction classification at publication. It is not a live inspection ledger or installed-capacity statement.
577
January 2026 combined permit reportCity of Glendale · published / observed 2026-01-31
Municipal monthly permit PDFpublic recordrecordcurrent

Official register includes a $116.1 million QTS tenant-improvement permit at 17236 W Camelback Road plus fire-system work. Permit value is not campus spend.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for issued permit, address, applicant and declared valuation. Tenant-improvement issuance does not prove completion or occupancy.
578
February 2026 combined permit reportCity of Glendale · published / observed 2026-02-28
Municipal monthly permit PDFpublic recordrecordcurrent

Official register includes a $35 million QTS tenant-improvement permit at 17316 W Camelback Road and fire-system work across multiple campus addresses.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for issued permit, address, applicant and declared valuation. Package values must not be summed into total project investment without scope reconciliation.
579
April 2026 combined permit reportCity of Glendale · published / observed 2026-04-30
Municipal monthly permit PDFpublic recordrecordcurrent

Official register includes a $12.4 million Aligned tenant-improvement permit at 8785 N Reems Road and related campus records at 8907 N Reems Road.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the issued package and addresses. Permit valuation is not total campus spend, and address-to-facility assignment still requires owner reconciliation.
580
June 2026 combined permit reportCity of Glendale · published / observed 2026-06-30
Municipal monthly permit PDFpublic recordrecordcurrent

Official register includes continuing Aligned commercial work at 8907 and 8895 N Reems Road, including one $205,251 and three $84,855 alteration entries.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for issued packages, addresses and declared valuations. Repeated address records are not separate campuses and are not summed into total investment.
581
July 2026 combined permit reportCity of Glendale · published / observed 2026-07-31
Municipal monthly permit PDFpublic recordrecordcurrent

Official register carries additional Aligned fire and miscellaneous work at 8895 N Reems Road, establishing continuing campus permitting through July.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the issued records and address. Fire and miscellaneous permits do not prove building commissioning, occupancy or a new campus phase by themselves.
582
September 2025 combined permit reportCity of Glendale · published / observed 2025-09-30
Municipal monthly permit PDFpublic recordrecordcurrent

Official register names Vantage Data Centers at the southeast corner of Bethany Home Road and Cotton Lane and records issued grading and drainage permits.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for applicant, location and issued civil permits. The records do not establish a vertical building start, MW, building count or commissioned facility.
583
Project BaccaraTakanock · published / observed 2026-08-28
Applicant project sitefirst partydirectcurrent

Applicant project page describes two data-center buildings and onsite natural-gas generation near Waddell. Filed county and state records control entitlement and power figures.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for applicant-stated concept and public participation routes. It is advocacy material; county, ACC and municipal filings control approvals, conditions and current jurisdiction.
584
Arizona Power Plant and Transmission Line Siting Committee approves Project Baccara CECArizona Corporation Commission · published / observed 2026-02-06
State utility and siting docketpublic recordrecordcurrent

State record reports a 5–0 approval of the certificate for a 700.2 MW gas-fired power plant intended to serve the proposed campus.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the commission vote and certificated generating capacity. Approval is not construction, financing, operation or proof of data-center power consumption.
585
Project Baccara military compatibility permit · staff reportMaricopa County · published / observed 2026-08-28
County planning and zoning recordpublic recordrecordcurrent

County record describes 160 acres, two two-story data-center buildings, Baccara Power, an APS substation, Electric District No. 7 and forecast construction and operating employment.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for filed scope, parties and entitlement context. Job counts, $370 million building value and $8.2 billion equipment value are applicant projections—not observed employment or audited spend.
586
Project Eagle · Glendale annexation and rezoning neighborhood meetingCity of Glendale · published / observed 2026-08-12
Municipal annexation and zoning calendarpublic recordrecordcurrent

City notice identifies pending cases AN-273 and ZON26-05 for 160 acres north of Olive Avenue between Reems and Litchfield roads. Gridwork retains Waddell as the project city until annexation is adopted.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for filed case numbers, meeting date and geography. A neighborhood meeting is not final annexation, rezoning approval or a construction permit.
587
Aligned · Glendale campus openingsAligned Data Centers · published / observed 2026-08-28
Official owner ATSofficial job boarddirectdue soon

Official Workday board exposes exact PHX-07 and PHX-13 roles plus multi-site roles that list PHX-07 as an eligible worksite.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for current title and published eligible worksite. Multi-site roles are not guaranteed Glendale placement, and every detail should be rechecked before applying.
588
Current planning and permit layer · data-center and project sweepCity of Phoenix · published / observed 2026-08-28
Municipal ArcGIS permit servicepublic recordrecordcurrent

Live municipal permit layer reconciled by project number, address, permit status, issue date, scope and named professional. It identifies active packages for STACK PHX02, Menlo Thistle, Iron Mountain AZP3, phoenixNAP II, Aligned Union Hills and PHX08, QTS Phoenix 2 and 1GServers.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the city-maintained permit fields at retrieval. OPEN can include review or issued work; DONE means the city record is complete, not that an entire campus is commissioned. Project numbers can contain unrelated legacy addresses and require parcel-level reconciliation.
589
Data-center zoning text amendment Z-TA-2-25-YCity of Phoenix · published / observed 2025-07-02
Municipal zoning staff reportpublic recordrecordcurrent

Official staff report for the city's data-center Special Permit process and utility, fire, health, noise and design review requirements.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the adopted-review context documented by the city. It is a citywide policy source, not proof that any particular parcel has received a Special Permit.
590
Planned Unit Development current and completed casesCity of Phoenix · published / observed 2026-08-28
Municipal zoning case registerpublic recordrecordcurrent

Official case index used to retrieve McDowell Road Data Center Z-62-17, 2950 E Broadway Road Z-42-17 and Laveen technology-corridor entitlements.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for case identity, geography and adopted status. An entitlement permits a use; it does not establish a current operator, construction start or continuing development intent.
591
Amazon buys Laveen site for a potential data-center campusArizona Technology Council / Phoenix Business Journal · published / observed 2024-10-24
Trade-association republication of local property reportingreported secondarysupportingcurrent

Reported land-record review says Amazon Data Services acquired roughly 220 acres near Loop 202 and Dobbins Road for $277 million; AWS described the purchase as continued evaluation, not a committed build.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyUseful for buyer, price and approximate acreage, but the deed and parcel set are not linked directly and AWS did not announce construction. Treat as an owned potential site with no active workforce forecast.
592
MD-PHX1 · PhoenixMenlo Digital · published / observed 2026-08-28
Owner development portfoliofirst partydirectcurrent

Owner page identifies 4801–4811 E Thistle Landing Drive, five buildings, 1,022,400 square feet, 257 MW utility and 180 MW critical IT. Its displayed construction percentage is older than later city foundation and shell permits.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · qualified accuracyHigh for owner-published program scope and address. The page's construction 0% indicator conflicts with newer city-issued Clayco foundation and shell permits, so it is not used as current stage evidence; target dates remain forecasts.
593
PHX02 · PhoenixSTACK Infrastructure · published / observed 2026-08-28
Owner campus pagefirst partydirectcurrent

Current owner page markets a 51-acre, five-building program with nearly 250 MW of planned critical capacity and an onsite substation; the city permit layer establishes the active first-building package.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for owner, campus program and marketed capacity. The page does not state building-by-building delivery, commissioned load or occupancy; city permits control active stage.
594
Phoenix 2 campusQTS Data Centers · published / observed 2026-08-28
Owner campus and building registerfirst partydirectcurrent

Current owner register identifies DC1–DC5 at 1200, 1250, 1400, 1450 and 1500 N 40th Street on an 80-acre campus with 210 MW-plus marketed critical capacity.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for current owner, address set and marketed campus scope. The page does not disclose energized capacity or building-level occupancy; municipal permits and certificates control those milestones.
595
QTS Phoenix 2 development agreementCity of Phoenix · published / observed 2024-01-24
Municipal legislative and development-agreement systempublic recordrecordcurrent

City legislative record covers the multi-building McDowell Road campus and public-park obligations at 40th Street and McDowell Road.

Reviewed 2026-08-28 · next 2026-10-12 · 45d cadence · high accuracyHigh for the agreement and municipal obligations. It does not by itself establish current building occupancy, installed MW or open hiring.
596
Phoenix data-center campus · AZP-1 / AZP-2 / AZP-3Iron Mountain Data Centers · published / observed 2026-08-28
Owner campus registerfirst partydirectcurrent

Current owner page identifies a 39-acre, three-facility Phoenix campus with more than one million square feet and 125 MW combined program capacity. City records show AZP3 core, shell and current data-hall fit-out at 5100 E Roosevelt Street.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for owner-published campus scope and facility set. Availability and leased status are commercial statements; the city permit layer controls current AZP3 package activity and does not prove energized tenant load.
597
PHX1 facility specification sheetCentersquare · published / observed 2025-10-01
Operator facility specification sheetfirst partydirectcurrent

Current operator sheet identifies a 40,456-square-foot, 13.3 MW multi-tenant environment at 615 N 48th Street inside the larger Iron Mountain campus.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for Centersquare's current operated footprint and address. It is an operator within the physical Iron Mountain campus and is therefore linked as a company, not duplicated as a separate land-and-building project.
598
Phoenix data center and expansionphoenixNAP · published / observed 2026-08-28
Owner facility page and current collateralfirst partydirectcurrent

Current owner page confirms the operating 3402 E University Drive flagship. Owner collateral reports 100,000 square feet operating and a 530,000-square-foot expansion underway; city permits place phoenixNAP II at 3225 E Elwood Street.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for the operating flagship and owner-stated expansion. The city-issued grading and shell permits control the second building's stage; collateral square footage is program scale, not occupied area.
599
Phoenix campus · PHX-01 / PHX-02 / PHX-03 / PHX-05Aligned Data Centers · published / observed 2026-08-28
Owner facility portfoliofirst partydirectcurrent

Current owner page lists four facilities at the 55-acre 2500 W Union Hills Drive campus. The city permit layer separately identifies PHX08 civil and demolition work at 3202 W Behrend Drive.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for the current Union Hills facility set. Commercial availability is not occupancy or energized-load evidence, and the page does not yet publish PHX08; the city permit record controls that separate site identity.
600
Phoenix · Deer Valley data centerFlexential · published / observed 2026-08-28
Operator facility pagefirst partydirectcurrent

Current operator page identifies the operating Deer Valley facility at 1850 W Deer Valley Road with 5.02 MW critical load and a 109,476-square-foot footprint.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for current operator, address and published specifications. It does not disclose current vacancies, utilization or a live expansion package.
601
PHX1 · Phoenix North Mountain data centerExpedient · published / observed 2026-08-28
Operator facility pagefirst partydirectcurrent

Current operator page identifies the operating 2475 W Townley Avenue facility with 3.6 MW critical IT load and 46,000 square feet.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for current operator, address and published specifications. It does not establish current hiring, utilization or expansion.
602
PHX10 · 120 East Van Buren StreetDigital Realty · published / observed 2026-08-28
Owner facility pagefirst partydirectcurrent

Current owner page identifies the operating four-story, 275,000-square-foot downtown internet gateway and data-center facility.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for current ownership, address and building size. Product availability is not current occupancy or vacancy evidence.
603
1GServers Phoenix facility and phase-two expansion1GServers · published / observed 2026-08-28
Owner facility and colocation pagefirst partydirectcurrent

Current owner page identifies 3719 E La Salle Street, limited live cabinet availability and a planned second expansion phase. City records show a 2026 remodel, fire-alarm and battery-system package.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for owner, address, live service and stated phase-two intent. It does not publish campus MW or completion percentage; city permits control the active fit-out evidence.
604
On-site data-center / helpdesk technician1GServers · published / observed 2026-08-28
Employer careers pageofficial job boarddirectdue soon

Employer-hosted local opening for an on-site Phoenix data-center and helpdesk technician, with application by resume and cover letter.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the employer-published role and Phoenix worksite observed. The page provides no requisition ID or posting date and can change without notice; confirm availability before applying.
605
Phoenix colocation data centerPhoenix Internet · published / observed 2026-08-28
Local operator service pagefirst partydirectcurrent

Current operator page identifies the live colocation facility at 2922 W Clarendon Avenue and publishes cabinet, cooling and connectivity options.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for current service, operator and address. Marketing specifications do not establish utilization, expansion or active vacancies.
606
Lone Cactus technology operations center offering memorandumCushman & Wakefield · published / observed 2018-01-01
Commercial property record plus current company addressreported secondarysupportingcurrent

Property memorandum identifies a 16,000-square-foot NexusTek network operations center and data center at 1919 W Lone Cactus Drive, including approximately 6,500 square feet of data hall and 741 kW capacity; NexusTek still publishes the address as its Phoenix office.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyGood historical physical-facility evidence but not a current operator specification sheet. Retain as a small operating-support facility with a current-status refresh flag; do not infer expansion or hiring.
607
Phoenix network and ILA colocation mapUniti Wholesale · published / observed 2026-01-01
Carrier network and colocation mapfirst partydirectcurrent

Current provider map identifies an ILA colocation location at 1710 E Grant Street and distinguishes it from the city's larger third-party campuses.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for provider-published location and ILA colocation role. It does not publish building scale, staffing or a construction program; classify as an edge/network facility.
608
Phoenix 400G-enabled network site registerLumen · published / observed 2026-08-28
Carrier network site registerfirst partydirectcurrent

Current carrier register lists 811 S 16th Street as a Phoenix 400G-enabled network location; Lumen's product documentation separately confirms Phoenix edge compute and storage availability.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for the current network address and Phoenix edge availability. The source does not publish data-hall scale, staffing or a new build, so the record is classified as a network-edge facility rather than a hyperscale campus.
609
2950 E Broadway Road data-center PUD · Z-42-17City of Phoenix · published / observed 2018-01-12
Municipal zoning narrative and current facility screeningpublic recordrecordcurrent

Adopted 7.67-acre PUD authorized a data-center use at 2950 E Broadway Road. Current city environmental records identify Cereus Graphics at the property and no current data-center building permit was found, so the entitlement is retained as inactive rather than presented as a live project.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for the adopted entitlement and address. Current non-data-center use and absence from the active permit sweep do not legally extinguish the PUD; they support an inactive/watch classification, not cancellation.
610
Interactive planning map and current zoning casesCity of Chandler · published / observed 2026-08-28
Municipal interactive planning mappublic recordrecordcurrent

City map and case-document route used to reconcile data-center zoning, addresses and proposed or approved PAD cases. Building and inspection records still require Citizen Access or a public-record request.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for city-published case geography and linked planning documents at retrieval. Map status is not a certificate of occupancy, current operator confirmation or complete permit export.
611
Chandler data-center ordinance in effectCity of Chandler · published / observed 2023-01-11
Municipal zoning-code amendmentpublic recordrecordcurrent

Official city summary establishes that primary-use data centers require explicit PAD approval and documents sound-study, generator-testing and neighborhood-communication requirements.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyHigh for the citywide approval framework. The ordinance does not identify every facility, prove a building permit or establish current operation at a particular address.
612
Chandler PHX1–PHX8 data-center campusCyrusOne · published / observed 2026-08-28
Owner campus registerfirst partydirectcurrent

Current owner page identifies one Chandler campus containing eight facilities, approximately two million square feet of technical space and 169 MW total IT capacity.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for current owner, eight-facility campus identity and combined marketed specifications. It does not publish building-level occupancy, energized load or current construction packages.
613
Current Chandler data-center openingsCyrusOne · published / observed 2026-08-28
Official owner ATSofficial job boarddirectdue soon

Official Workday board exposes current Chandler operations, maintenance, service-delivery and facility-management roles plus one Arizona multi-site night-shift pipeline.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for current published title, city and requisition at observation. Chandler is assigned to the only resolved CyrusOne campus in the city; individual PHX building placement remains undisclosed and every requisition must be rechecked before applying.
614
Data Canopy Phoenix colocation · CyrusOne PHX8Data Canopy · published / observed 2026-08-28
Colocation reseller facility pagefirst partydirectcurrent

Current reseller page places Data Canopy service at 2605 S Ellis Street inside CyrusOne PHX8. Gridwork links the company to the campus instead of creating a duplicate physical project.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for Data Canopy's published service location and PHX8 attribution. It does not establish separate land, a separate building or operator control outside the CyrusOne campus.
615
PHX15 · 2121 South Price RoadDigital Realty · published / observed 2026-08-28
Owner facility pagefirst partydirectcurrent

Current owner page identifies the operating two-story, 508,000-square-foot PHX15 data center in Chandler.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for current owner, address, operating service and building size. Commercial availability and total metro statistics do not establish occupancy, utilized load or a live construction package.
616
PHX15 sustainable water service agreementCity of Chandler · published / observed 2025-11-13
Municipal council agenda and agreement recordpublic recordrecordcurrent

City Council record approves a sustainable water-service agreement with Digital 2121 Realty South Price LLC for the data center at 2121 S Price Road.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the legal party, address and approved water agreement. It is not an expansion permit, utilization measure or employment commitment.
617
Phoenix data center · ChandlerH5 Data Centers · published / observed 2026-08-28
Operator facility pagefirst partydirectcurrent

Current operator page identifies the 2600 W Germann Road facility, 180,000 square feet, 26 MW of capacity and 40 customers.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for current operator, address and published facility specifications. Customer count and capacity are operator claims; no current expansion permit or utilized-load figure is exposed.
618
Aligned Phoenix portfolio · PHX-04 and PHX-06Aligned Data Centers · published / observed 2026-08-28
Owner facility portfoliofirst partydirectcurrent

Current owner register separately lists PHX-04 at 2501 S Price Road and PHX-06 at 2955 W Innovation Street in Chandler.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for current facility identifiers, addresses and operating service. The page does not disclose building-level occupancy, commissioned MW or current construction packages.
619
Continuum II data-center neighborhood meeting · PLA22-0365City of Chandler · published / observed 2023-07-20
Municipal planning case and neighborhood noticepublic recordrecordcurrent

City-hosted project notice identifies Aligned's approximately 17.28-acre Continuum II site at the southeast corner of Price Road and Innovation Street.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for applicant, parcel, acreage and filed proposal geography. A neighborhood meeting is not a building permit or certificate of occupancy; the current owner portfolio supplies operating identity.
620
PHX-04 eligible current openingsAligned Data Centers · published / observed 2026-08-28
Official owner ATSofficial job boarddirectdue soon

Official Workday board exposes current multi-site land, customer delivery, procurement and quality / commissioning roles that include PHX-04 as an eligible worksite.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for published eligible worksite and requisition at observation. These are multi-site roles, so placement at PHX-04 is possible rather than guaranteed; none is assigned to PHX-06 without explicit posting evidence.
621
Lincoln acquires and plans Chandler turnkey data-center deliveryLincoln Property Company · published / observed 2025-11-03
Property owner acquisition and redevelopment announcementfirst partydirectcurrent

Owner announcement identifies a partially occupied 191,000-square-foot facility at 2500 W Frye Road, 28 MW of confirmed utility power and a planned 16 MW turnkey buildout with cooling upgrades.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for owner-stated acquisition, address, existing facility and intended redevelopment. Planned turnkey capacity, water savings and delivery are forward-looking until permits, inspections or owner milestones confirm them.
622
Chandler flagship data center · 2500 W Frye RoadHorizonIQ · published / observed 2026-08-28
Operator facility publicationfirst partydirectcurrent

Current operator-hosted page identifies HorizonIQ's Chandler flagship at 2500 W Frye Road. Lincoln's later owner record controls current property redevelopment scope.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyGood for the continuing operator association and address. The page originated under the INAP brand and does not resolve current leased halls, tenant identity or Lincoln's construction progress.
623
1900 S Price Road three-building data-center saleNorth American Data Centers / CTF Assets · published / observed 2021-12-31
Data-center property acquisition reportreported secondarysupportingcurrent

Reported acquisition record describes 1890 and 1900 S Price Road plus 3200 W Germann Road as a three-building former Digital Realty complex that was vacant at sale, with retrofit intent by the buyer.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyUseful historical evidence for address set, vacancy and sale context, but it does not identify the current owner, prove retrofit completion or establish a current operator. Retain as an inactive redevelopment lead pending deeds and permits.
624
PLH24-0046 Price Road Innovation Campus · City Council resultsCity of Chandler · published / observed 2025-12-11
Municipal council agenda resultspublic recordrecordcurrent

Official results show a unanimous 7–0 motion to deny the proposed 422,877-square-foot AI data center, associated tech park rezoning and development agreement at 3380 S Price Road.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the filed scope and council denial. The denial prevents this proposal from being presented as an active build; a future application or appeal would require a new controlling record.
625
Tempe Zoning and Development Code · Section 3-429 Data CentersCity of Tempe / Municode · published / observed 2025-07-01
Municipal zoning codepublic recordrecordcurrent

Current city code limits data centers to specified industrial and mixed-use districts through a use permit, requires residential separation and enclosed generators, and adds economic-impact and extreme-water-use review.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyHigh for current land-use controls. The ordinance defines where and how a facility may be approved; it does not identify every existing site or prove a pending project.
626
Planning applications, forms and Tempe Citizen Access permit routeCity of Tempe · published / observed 2026-08-28
Municipal permit portalpublic recordrecordcurrent

Official entry point for planning submissions and document retrieval used to extend the city inventory beyond indexed council and activity packets.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the city's current submission and retrieval process. A portal route is a discovery source, not evidence of a specific approval or construction milestone.
627
Phoenix market data sheet · PHX01 and PHX11EdgeConneX · published / observed 2026-03-01
Owner facility data sheetfirst partydirectcurrent

Current owner data sheet identifies the operating PHX01 facility in Tempe at 3011 S 52nd Street, 79,200 square feet, 17,300 square feet of raised floor and cloud on-ramps; PHX11 is separately tracked in Mesa.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the current owner-published address, facility configuration and service availability. Marketed power and availability remain commercial specifications rather than utilized load.
628
Tempe community-development activity · EdgeConneX PHX01 MEP and alteration permitsCity of Tempe · published / observed 2023-04-01
Municipal permit and activity ledgerpublic recordrecordcurrent

City activity record identifies BP221674 for mechanical and electrical equipment additions at 3011 S 52nd Street; related city ledgers also preserve battery replacement, roof, interior demolition and low-voltage work.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the filed permit title, address and scope. The ledger does not establish current completion, equipment count, energized load or later inspections.
629
Arizona colocation and data center · Beck AvenueColoBarn · published / observed 2026-08-28
Operator facility publicationfirst partydirectcurrent

Current operator page identifies 8905 S Beck Avenue in Tempe as a 28,000-square-foot facility with 18,000 square feet of raised floor, 2 MW N+1 power and remote-hands support.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the current operator-published address and marketed facility specifications. It does not disclose utilized load, customer count or binding local hiring.
630
Phoenix data center · 1005 W Geneva DriveCloudnium · published / observed 2026-08-28
Service provider facility pagefirst partydirectcurrent

Current service page markets a Phoenix data-center facility at 1005 W Geneva Drive in Tempe. Property ownership, active customer load and the relationship to the former Omnis operation remain unresolved.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyGood for the currently marketed address and services, but the page does not establish property ownership, occupancy, utilized load or continuity from the former Omnis operation.
631
1005 W Geneva Drive data-center property offered for saleData Center Dynamics · published / observed 2025-09-01
Data-center property sale reportreported secondarysupportingcurrent

Reported property listing describes a roughly 15,000-square-foot data-center building at 1005 W Geneva Drive and names Omnis at the same address.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyUseful for the sale listing and historical Omnis association. Recheck deed, listing disposition, permits and a current operator record before treating ownership or active service as resolved.
632
Data Center Engineer · Tempe · requisition 507772Insight Global · published / observed 2026-08-28
Official staffing job boardofficial job boarddirectdue soon

Current recruiter-hosted contract posting names Tempe and hands-on rack, stack, cabling and hardware-turn-up work. The customer and facility address are not disclosed.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the posting at observation time. The exact employer customer and worksite are withheld, so the role must remain a Tempe-market signal rather than a campus assignment.
633
Planning and development records · permits, certificates and case filesCity of Scottsdale · published / observed 2026-08-28
Municipal planning and permit portalpublic recordrecordcurrent

Official city records hub links building permits, certificates of occupancy, planning cases, GIS and public-record requests. Scottsdale's SPUR portal began handling new planning and permitting activity in January 2026 while older cases remain in legacy systems.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the city's current record-access routes and system transition. A portal is a discovery source; project stage still requires a permit, inspection, certificate or case record tied to an address.
634
Iron Mountain Scottsdale · AZS-1 data centerIron Mountain Data Centers · published / observed 2026-08-28
Owner facility pagefirst partydirectcurrent

Current owner page identifies AZS-1 as an operating 121,000-square-foot facility on 4.5 acres with 5.8 MW of power, four data halls, 16-plus on-site providers and potential expansion to 9.6 MW.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the current owner, marketed facility configuration and service availability. Potential capacity is not energized load, expansion construction or a vacancy count.
635
Building permit 227293 · 8521 E Princess DriveCity of Scottsdale · published / observed 2016-10-13
Exact-address municipal permit searchpublic recordrecordcurrent

Finalled city remodel permit ties 8521 E Princess Drive to parcel 215-07-212A and DC-8521 East Princess Drive LLC; the record includes a certificate of occupancy route and names Cannon & Wendt as builder.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the historical permit, legal owner field, address, parcel and finalled status. It is a 2016 remodel record and must not be presented as evidence of a current expansion.
636
Scottsdale, Arizona data center · facility sheet11:11 Systems · published / observed 2026-04-01
Operator facility data sheetfirst partydirectcurrent

Current operator facility sheet confirms an active Scottsdale data center offering colocation, managed IT, recovery and workplace-recovery services; the detailed 2025 revision reports 102,400 square feet, including 16,000 square feet of raised floor and 29,000 square feet of managed-services space.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for current operator service at a Scottsdale facility. The current sheet omits the street address and detailed configuration, so 7499 E Paradise Lane and detailed area figures remain qualified against the prior operator sheet and city parcel records.
637
Scottsdale parcel mailing list · 7499 E Paradise LaneCity of Scottsdale · published / observed 2024-01-01
Municipal case document and parcel listpublic recordrecordcurrent

City planning record identifies Scottsdale parcels 215-44-041 and 215-44-043 at 7499 E Paradise Lane and names AX Gardsun LP as the parcel owner.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for the parcel addresses and owner listed in the 2024 city record. The mailing list does not establish the data-center operator, current lease, occupancy, permit stage or title after the document date.
638
11:11 Systems careers and official openings route11:11 Systems · published / observed 2026-08-28
Official employer careers page and ATS routeofficial job boarddirectdue soon

Official employer careers page routes candidates to the current ATS and states that individual postings specify work-location requirements.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the employer-controlled recruiting route. No exact Scottsdale or Paradise Lane requisition is normalized in this review, so company-wide roles are not assigned to the facility.
639
Planning Commission minutes · data-center standards initiationTown of Gilbert · published / observed 2026-02-04
Municipal planning commission minutespublic recordrecordcurrent

Official minutes record staff's statement that Gilbert had one known data center and no received data-center applications while the commission initiated research and a Land Development Code amendment for future standards.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for staff's February 2026 inventory statement, absence of applications known to staff and code-amendment initiation. It is a dated municipal snapshot, not proof that no filing arrived later.
640
One Stop Shop · planning, permits and inspectionsTown of Gilbert · published / observed 2026-08-28
Municipal permit and inspection portalpublic recordrecordcurrent

Official municipal portal for planning applications, commercial building permits, engineering records, inspection scheduling and inspection results.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the town's current record-access route. A portal is a discovery source; project stage requires an address-linked application, permit, inspection or certificate record.
641
AZ01 Phoenix data center · GilbertUS Signal · published / observed 2026-08-28
Current operator facility pagefirst partydirectcurrent

Current operator page identifies AZ01 at 1655 W Sunrise Boulevard in Gilbert, with 1,000 kW generators in 2N redundancy, 500 kW UPS in 2N, 1,500 kVA utility feeds, N+1 cooling and a 1998 build year.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the current operator, exact address and published infrastructure configuration. The page's zero-value total-space and workload counters are treated as missing display data, not literal zero capacity.
642
US Signal acquisition of OneNeck data-center portfolioUS Signal · published / observed 2024-06-03
Buyer acquisition announcement and integration updatefirst partydirectcurrent

Owner announcement identifies the acquisition of OneNeck IT Solutions and OneNeck Data Center Holdings, including the Phoenix-area data center; US Signal later states the transaction closed in September 2024.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the buyer-stated acquisition scope and operator succession. It does not identify current site staffing, capital work or individual customer occupancy.
643
US Signal careers and current job opportunitiesUS Signal · published / observed 2026-08-28
Official employer ATSofficial job boarddirectdue soon

Official employer ATS exposed ten current opportunities at review; none named Gilbert, AZ01 or 1655 W Sunrise Boulevard.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for the current requisition inventory at observation. The absence of Gilbert roles is time-sensitive and does not establish that the facility is unstaffed.
644
Ordinance 801-22 · data-center primary-use prohibitionTown of Queen Creek · published / observed 2022-11-02
Municipal ordinance and council packetpublic recordrecordcurrent

The official council packet adopts P22-0205 / Ordinance 801-22, codifying a prohibition on data centers as a primary use. It separately allows a limited ancillary data center to be considered by conditional use when it directly supports the underlying business and occupies a minimal footprint.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the adopted 2022 zoning action and its primary-use / ancillary-use distinction. Any later text amendment, rezoning, annexation or state-law preemption must be checked before treating the policy as unchanged.
645
Current zoning ordinance · May 2026 revisionTown of Queen Creek · published / observed 2026-05-01
Current municipal zoning codepublic recordrecordcurrent

The town's current published zoning ordinance retains Data Centers and Ordinance 801-22 in its amendment history. Gridwork uses the adopted packet for the operative primary-use and ancillary-use language and the current code as the later persistence check.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the May 2026 code publication and amendment history. The compiled PDF should be rechecked for later amendments and controlling table changes before every policy-status update.
646
Development Nexus and current planning-case registerTown of Queen Creek · published / observed 2026-08-28
Municipal planning and permit portalpublic recordrecordcurrent

Official current-case index and linked Development Nexus route were screened for a physical data-center project. No data-center project was resolved from the public index in this review; that is a scoped no-match, not proof that no pre-application, county-island, ancillary facility or differently named filing exists.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for the town's public access routes and qualified for a no-match result because portal search, indexing and pre-application visibility can be incomplete. Refresh against case lists, Accela records and meeting packets.
647
Mesa Council · Pacific Proving annexation, zoning and development agreementCity of Mesa · published / observed 2024-08-26
Municipal council minutes and land-use casespublic recordrecordcurrent

Official minutes approve ANX24-00192, ZON24-00561 and ZON24-00190 for Pacific Proving Technology Campus north of Pecos Road and east of the future Crismon alignment. The 177-acre zoning case allows a data center and names Pacific Proving LLC and Mesa BA Land LLC as owners and Gammage & Burnham as applicant.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the approved cases, Mesa jurisdiction, disclosed owners, applicant and 177-acre zoning envelope. Approval does not establish a construction start, operator, NTT identity, capacity, investment or completed building.
648
Potential data center campus · verified facts and developer estimatesCity of Casa Grande · published / observed 2026-08-28
Municipal project FAQ and applicant disclosurespublic recordrecordcurrent

Official FAQ describes an approximately 480-acre potential campus near Bianco, Clayton and Gila Bend Highway: up to 13 buildings and approximately 3.25 million square feet. It separately labels the developer's $2.5 billion campus / onsite-power estimate, $4.1 billion equipment estimate and 585 five-year operating-job estimate. The end user, MW, construction schedule and temporary construction employment are undisclosed.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for the city's process, location, waiver conditions and disclosed maximum envelope. Investment, employment, wage and tax figures are developer estimates, not observed spend, contracted hiring or guarantees.
649
Resolution 5960 · property-specific Proposition 207 waiversCity of Casa Grande · published / observed 2026-08-03
Adopted municipal resolutionpublic recordrecordcurrent

Adopted resolution approves and records two property-specific waivers. The waivers run with the land but do not waive site-plan, building, environmental, utility or other development approvals and do not authorize construction.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyControlling record for the August 3, 2026 waiver action and its limited legal effect. It is not a development permit or evidence of mobilization.
650
Agenda item K.5 · Bianco corridor waiver conditions and ownershipCity of Casa Grande · published / observed 2026-08-03
Municipal agenda staff report and attachmentspublic recordrecordcurrent

Staff report identifies Vernon Barnes and Dale Willis through Ethington & Hwy 84 LLC as the two landowners across approximately 480 I-2 acres. Conditions include cooling and power disclosure, an aggregate 800 acre-foot annual potable-water cap, behind-the-meter power until utility capacity, 60/55 dBA day/night noise limits, decommissioning after a 24-month closure and a conditional $5 million recreation contribution.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for disclosed owners, parcel scope, waiver history and adopted conditions. References to a future campus remain pre-application planning evidence until site and building filings appear.
651
Vernon Barnes Proposition 207 claim · Bianco / Clayton parcelsCity of Casa Grande agenda record · published / observed 2026-03-02
Municipal claim attachment and parcel recordpublic recordrecordcurrent

Claim identifies Vernon Barnes as owner, states an intent to pursue data-center development and lists APNs 503-44-0020, 503-44-0030, 503-44-001A and 503-44-001B at the southeast corner of Bianco and Clayton. The claim's $73,180,800 diminution figure is a claimant allegation, not project investment.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for the filed claimant identity, cited parcels and stated intent; qualified for valuation and legal assertions because they originated with the claimant and were resolved through a waiver rather than adjudicated here.
652
Ethington & Hwy 84 LLC Proposition 207 claim · Bianco / Gila Bend parcelsCity of Casa Grande agenda record · published / observed 2026-03-02
Municipal claim attachment and parcel recordpublic recordrecordcurrent

Claim identifies Dale Willis by and through Ethington & Hwy 84 LLC, states an intent to pursue data-center development and lists APNs 503-44-009A, 503-44-009B and part of 503-44-008A near Bianco and Gila Bend Highway. The claim's $73,180,800 diminution figure is a claimant allegation, not project investment.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for the filed claimant identity, cited parcels and stated intent; qualified for valuation and legal assertions because they originated with the claimant and were resolved through a waiver rather than adjudicated here.
653
Development applications, permits and meetingsCity of Casa Grande · published / observed 2026-08-28
Municipal planning and permit portalpublic recordrecordcurrent

Official access route for planning applications, conditional-use permits, site plans, building permits, inspections and public meetings. No project-specific site plan or building permit is asserted from the portal itself.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for the current public filing route. Project stage must be tied to an exact parcel, address, case, permit or inspection rather than inferred from portal availability.
654
Pinal County resolutions · data-center land-use casesPinal County · published / observed 2026-08-28
County resolution register and recorded planning actionspublic recordrecordcurrent

Official register records approvals for SunHill PZ-PA-012-24, Frontier West PZ-PA-015-25, Project Midway PZ-PA-013-25 and the earlier La Osa comprehensive-plan amendment PZ-PA-011-25. These are land-use-plan actions, not building permits or construction starts.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for case disposition, applicant, land area, parcel and location statements. Each approval only carries the legal effect of the named comprehensive-plan action; later zoning, PAD, permits and inspections must be checked separately.
655
PZ-003-26 / PZ-PD-003-26 · La Osa rezone and PAD applicationPinal County Development Services · published / observed 2026-04-20
County rezone / PAD case packetpublic recordrecordcurrent

Official application sought I-3 zoning over 2,393 acres and a PAD over approximately 3,385 acres for data centers, gas-fired generation, battery storage and related facilities south of Eloy. The Board later denied the two continued zoning items on August 26, 2026.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed zoning request, legal scope and proposed uses. Applicant employment, capacity and delivery assumptions are proposals, not constructed or contracted facts.
656
Board recap · La Osa data-center zoning items denied 4–1Pinal County · published / observed 2026-08-27
County Board of Supervisors action recappublic recordrecordcurrent

Official county recap states the Board voted 4–1 on August 26, 2026 to deny two continued planning and zoning items related to the south-of-Eloy data-center development.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for the 4–1 denial and meeting date. The recap is paired with the exact PZ-003-26 / PZ-PD-003-26 packet; monitor minutes, resolutions, appeals or a new filing for controlling follow-up.
657
PZ-PA-012-24 · SunHill data center, BESS and mixed-use plan amendmentPinal County · published / observed 2024-10-30
County agenda, staff report and adopted resolutionpublic recordrecordcurrent

Official agenda and adopted action identify Judd Ventures LLC and approve a major comprehensive-plan amendment over approximately 96 acres at the southeast corner of Felix and Judd roads: approximately 80 employment acres and 16 mixed-use residential acres for a data center, BESS and residential development.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for owner, case, approved plan amendment, parcel location and broad proposed uses. The record does not establish a rezoning, operator, MW, building permit, construction start or job count.
658
PZ-PA-015-25 · Frontier West Energy Generation and Technology CampusPinal County Development Services · published / observed 2025-10-16
County major-plan-amendment staff packetpublic recordrecordcurrent

Official staff packet places the approximately 495-acre case northeast of Maricopa and Teel roads in unincorporated Pinal County and within the City of Maricopa's extended planning area. It documents the proposed 414-acre employment / 81-acre public-facilities split, names W Holdings and Arizona RR Ranches, and preserves the City of Maricopa's objections. The county later approved the comprehensive-plan amendment.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the jurisdiction, case parties, parcels, land-use envelope and intergovernmental comments. Applicant descriptions, employment claims and technology-campus concepts are proposals; the packet is not a rezone, PAD, generation approval, utility commitment, building permit or construction start.
659
PZ-PA-013-25 · Project Midway major-plan-amendment packetPinal County Development Services · published / observed 2025-11-19
County major-plan-amendment packet, parcel and development-team schedulepublic recordrecordcurrent

Official county packet places the 215-acre site at the southwest corner of Selma Highway and Midway Road in unincorporated Pinal County, identifies parcel 500-12-001B, Selma & Midway LLC, IDM Companies, Withey Morris Baugh and Colliers Engineering & Design, and describes a data-center campus within a flexible employment / industrial envelope. It also states that a later industrial rezoning is intended.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for jurisdiction, parcel, named project parties, filed land-use request and the applicant's intended later rezoning. The data-center concept, traffic, jobs and utility narrative are applicant projections; the packet is not a rezone, PAD, power-service agreement, building permit or construction start.
660
Bella Energy Facility · adjacent generation and storage permit recordPinal County Air Quality · published / observed 2025-12-15
County Title V permit register plus adopted zoning recordpublic recordrecordcurrent

Current county record identifies Project Bella Holdings LLC's Bella Energy Facility at Cornman and Midway roads as a power plant under Title V permit V20700.A02. County zoning records separately approve a 351.8-acre I-3 rezone for the proposed 480 MW thermal generation and 440 MW battery-storage facility. Project Midway's own filing describes adjacency as a potential synergy, but no dedicated supply contract or data-center delivery commitment is established.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the facility identity, permit number, address, permit dates and approved power-project zoning envelope. The record does not establish that Bella is built, generating, contracted to Project Midway or part of the data-center campus; keep it as adjacent enabling-infrastructure evidence only.
661
Pinal County Assessor · project-parcel crosswalkPinal County Assessor / GIS · published / observed 2026-08-28
County assessor parcel viewer and official TaxParcels feature servicepublic recordrecordcurrent

The current county parcel layer resolves SunHill APNs 210-44-002 and 210-44-004 to Judd Ventures LLC and 95.93 combined stated acres; Project Midway APN 500-12-001B to Selma & Midway LLC and 215.8 stated acres; and the Frontier West packet's cited parcels to Arizona RR Ranches LLC. SunHill and Midway are shown as vacant land. Frontier West records span vacant and agricultural classifications; only portions of the large 510-54-002A and 510-48-029L parcels lie inside the filed project envelope, so their full assessor acreage is not added to the campus total.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for the parcel IDs, current assessor-listed owner, stated area and use fields returned on the review date. Assessor records are not title evidence and can lag deeds or parcel changes. Multipart geometry can return duplicate rows, which are deduplicated by parcel ID rather than counted as separate parcels.
662
Pinal County Recorder · project-entity instrument crosswalkPinal County Recorder · published / observed 2026-08-28
Anonymous county recorder name search with entity spelling and date-window variationspublic recordrecordcurrent

The official index, released through August 27, 2026, returns Judd Ventures LLC deed 2024-045397 plus related June and October 2024 instruments in Section 29, T03S R09E; Selma & Midway LLC corrective deed 2019-058087 in Section 1, T07S R04E; and 18 Arizona RR Ranches LLC entries from 2023 through 2026 across Sections 25, 34 and 36, T05S R03E. The Frontier West chain includes 2024 deeds, option 2024-098878 and survey 2026-006351. Those records corroborate entity and land activity but do not by themselves establish project financing, a utility commitment, permits or construction.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for the indexed entity names, instrument numbers, recorded dates, document types and legal-description fields displayed on the review date. The index is not a title opinion; name searches can miss spelling variants, an instrument can serve more land than the project, and a recorded survey or option is not evidence of vertical construction.
663
Pinal County Citizen Access · building-record access gatePinal County Development Services / Accela · published / observed 2026-08-28
Current county Citizen Access portal and Building-module access testpublic recordrecordcurrent

The county's current Citizen Access landing page is public, but the Building search navigation displays a registration or login requirement. Gridwork therefore does not treat the absence of anonymously retrievable building results as a no-permit finding; exact APN, address and entity requests remain queued for account-authorized review or a county public-record request.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the current access behavior observed on the review date. It says nothing about whether a permit exists behind the gate and must never be converted into a negative project-status claim.
664
Pinal County Air Quality · current industrial permit public noticesPinal County Air Quality Control District · published / observed 2026-08-28
Current county industrial-air public-notice registerpublic recordrecordcurrent

The active public-notice list was screened by project name, owner, applicant and known location. No SunHill, Judd Ventures, Frontier West, W Holdings, Arizona RR Ranches, Project Midway or Selma & Midway match appears in the current notice set. This is a scoped current-notice result only; it does not cover every issued, pending, administratively complete, minor, dust or differently named generator permit.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for the entries published in the live notice register on the review date. Qualified as a negative screen because the page is not a complete historical or pending-permit inventory and project facilities may be filed under a future operator, power entity, contractor or address not yet resolved.
665
IDM Companies · official construction and corporate careersIDM Companies · published / observed 2026-08-28
Developer-controlled careers pageofficial job boarddirectcurrent

Official careers page publishes construction, residential and corporate career areas. The county filing names IDM as Project Midway developer, but no current posting is assigned to Project Midway or its future data-center program.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyHigh for the official hiring route and broad career areas. Recheck live openings before applying; do not infer a Midway assignment without an exact site, project or requisition reference.
666
Architecture Project Manager · Data Centers · PhoenixColliers Engineering & Design / MG2 · published / observed 2026-08-28
Employer-controlled careers siteofficial job boarddirectdue soon

Current official requisition 13700 includes Phoenix for a data-center architecture project manager working across national client programs. Colliers is the filed civil engineer for Project Midway and Southwest Crossing, but the requisition does not name either project and is therefore linked only as regional demand.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for title, Phoenix eligibility, job family and current official route at review time. Project assignment, client, worksite and longevity remain unverified; recheck the posting before applying.
667
Planning and Zoning agendas and minutes · 2026 case registerCity of Coolidge · published / observed 2026-08-28
Municipal Planning and Zoning agenda-and-minutes indexpublic recordrecordcurrent

The complete public 2026 Planning and Zoning index was screened through the September cancellation notice. January through March and August through September were cancelled; the April, May, June and July agendas contain rezoning, PAD and commercial cases but no identified data-center project.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for the cases and cancellations in the published commission index. A no-match is qualified because an industrial-zone site plan, administrative review, pre-application, permit, county-island filing or differently named project may not appear in this commission channel.
668
Coolidge Zoning Code · data-center use controlsCity of Coolidge · published / observed 2026-08-28
Current municipal zoning codepublic recordrecordcurrent

Current code defines data centers, lists the use as conditional in the Agricultural zone after Ordinance 24-13, and retains it among permitted uses in Commerce Park and Garden Industrial districts. The zoning path explains why commission agendas alone cannot establish a complete project inventory.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the published use permissions and ordinance history. Zoning eligibility does not prove that a project, site plan, permit, utility request, construction start or employer exists.
669
Apache Junction Development Projects · current GIS registerCity of Apache Junction · published / observed 2026-08-28
Municipal GIS development-project feature layerpublic recordrecordcurrent

The city's public Development Projects feature layer returned 38 named records across zoning review, plan review, approval, construction and completion states. No record name, case or project detail identified a physical data-center development in this screen.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for the 38 records returned by the public layer at review time. The zero-project result is qualified because the map may omit pre-applications, confidential leads, permits not promoted to the layer, county-controlled land, internal server rooms or differently named uses.
670
May 6, 2025 council minutes · possible data-center location discussedCity of Apache Junction · published / observed 2025-05-06
Municipal council minutes and economic-development updatepublic recordrecordcurrent

Official council minutes record a concern about a possible location for a data center during an economic-development update. The minutes do not identify a site, applicant, operator, case, capacity, approval or construction plan, so the discussion is retained as a monitoring lead rather than a project.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for what the minutes say and qualified for project inference: a council question about a possible location is not an application, negotiated project, entitlement, permit or hiring signal.
671
Apache Junction zoning-use amendment · data-center controlsCity of Apache Junction · published / observed 2025-01-01
Municipal zoning ordinance amendment and use tablepublic recordrecordcurrent

The municipal zoning-use table identifies data-center / data-processing facilities as conditional uses in specified business and industrial districts. It establishes a review path but does not identify a filed or approved project.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyHigh for the published conditional-use treatment. Code eligibility is not evidence of a site, permit, customer, power commitment, construction phase or vacancy.
672
What's New Maricopa · current development registerCity of Maricopa · published / observed 2026-08-20
Municipal current-development StoryMap and linked site planspublic recordrecordcurrent

The city's current StoryMap was parsed across 81 named projects in review, approved, under-construction and completed sections. No entry identified a physical data-center project inside municipal Maricopa.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for the 81 published project entries at review time. The zero-project result is qualified because the StoryMap is informational, may lag permit systems and may omit pre-applications, confidential economic-development leads, minor permits, internal server rooms or projects outside city limits.
673
Development Services data and project-publication channelsCity of Maricopa · published / observed 2026-08-04
Municipal development-services data hubpublic recordrecordcurrent

Official Development Services page identifies the current StoryMap, public-meeting notices, project coordination and GIS channels as the city's development-activity publication routes. The page states its information was last updated August 4, 2026.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyHigh for the city's stated publication routes and page update date. It is a discovery hub, not a permit ledger, completeness guarantee or evidence that an unpublished lead does not exist.
674
Pinal County workforce training · skilled tradesCentral Arizona College · published / observed 2026-08-28
Current public-college program pageseducation workforcedirectcurrent

Current college workforce page lists commercial electrical installation, welding, diesel and heavy-equipment training for Pinal County employers and workers. Separate current program materials document NCCER-aligned commercial electrician and HVAC pathways.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for currently published program scope. Enrollment dates, seats, campus availability, costs and employer relationships must be verified directly; no project placement is implied.
675
Pinal County career and employer servicesARIZONA@WORK · published / observed 2026-08-28
State and local public workforce networkeducation workforcedirectcurrent

Official local workforce network provides job matching, training navigation, hiring events and employer recruiting support across Pinal County.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the public service route. Current funding, eligibility, appointment capacity and employer demand vary; the page does not establish a data-center-specific intake or placement agreement.
676
PZ-25-34, PZ-25-35, PZ-25-55 and PZ-25-56 · Dobson Farms hearing packetTown of Florence · published / observed 2025-09-18
Municipal Planning and Zoning agenda packetpublic recordrecordcurrent

Official Planning and Zoning packet separates the 780-acre Florence Tech Park, 239-acre Dobson Farms East and 600-acre Dobson Farms West cases. It names Ryan Companies as developer of Florence Tech Park, contains the EdgeCore / Corgan ten-building test fit for the east parcel, and records that the test fit is incomplete and may not be used for permit or construction.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for case identities, applicants, parcels, acreage, proposed uses and the contents of the filed conceptual plans. Building counts, 72 MW labels, substation ratings and other test-fit figures are concepts—not approved construction scope, energized capacity or delivery commitments.
677
October 7 corrected action minutes · Dobson Farms ordinancesTown of Florence · published / observed 2025-10-07
Adopted municipal council action minutespublic recordrecordcurrent

Corrected council action minutes record unanimous 7–0 adoption of Ordinances 766-25, 767-25 and 768-25 for the east, west and Florence Tech Park general-plan amendments. The meeting record also captures unanimous adoption of Ordinance 769-25 for the Florence Tech Park PUD amendment.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyControlling municipal action for the October 7, 2025 votes. These policy and PUD approvals permit an entitlement path; they do not establish building permits, utility service, financing, mobilization or completion.
678
October 7 council packet · Florence Tech Park and Dobson FarmsTown of Florence · published / observed 2025-10-07
Municipal council packet and applicant studiespublic recordrecordcurrent

Official council packet contains the ordinance exhibits, Ryan's Florence Tech Park / Able Tech Park traffic study, and the Dobson Farms West traffic study. The Tech Park concept includes five data-center buildings, two office buildings and one industrial building; the west study models a 6.46 million-square-foot data-center and industrial program.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyHigh for the documents considered by council and qualified for applicant modeling. Traffic, employee, square-footage and layout figures are planning assumptions and must not be restated as constructed facts or guaranteed jobs.
679
Planning and Zoning and Town Council meeting registersTown of Florence · published / observed 2026-08-28
Current municipal meeting and agenda registerpublic recordrecordcurrent

Current municipal meeting register was screened through the available 2026 agendas and packets for later Dobson Farms site-specific approvals. No building permit, construction start or operating milestone is asserted from this index review.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh for the public meeting access route and qualified for a no-match result because administrative site plans, building permits, utility records and unindexed pre-application work may sit outside meeting packets.
680
RZPAD2024-006 · Southwest Crossing PAD narrative and attachmentsCity of Eloy · published / observed 2025-01-15
Municipal CivicClerk case packet and applicant narrativepublic recordrecordcurrent

Official city filing identifies Ryan Companies as developer, Coton City Industrial Park LLC as owner and Colliers Engineering & Design as civil engineer for approximately 122 acres at the southeast corner of Estrella and Houser roads. The filed PAD narrative and development plan describe the Southwest Crossing data-center concept.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the filed team, address, acreage and conceptual scope. The narrative, economic analysis and development plan are applicant submissions; capacity, investment, building count and employment remain proposed until later permits, contracts and field evidence confirm them.
681
Ordinance 25-985 · Southwest Crossing council action itemCity of Eloy · published / observed 2025-02-10
Municipal council agenda and meeting video indexpublic recordrecordcurrent

Official council agenda scheduled a public hearing and possible adoption of Ordinance 25-985 for RZPAD2024-006 and Resolution 25-1611 for the filed PAD. Gridwork did not resolve a signed ordinance or official result sheet in this review, so the council outcome remains explicitly unverified.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyHigh that council considered the named case on February 10, 2025; qualified for disposition because an agenda proves scheduled action, not adoption. Retrieve the signed ordinance, minutes or clerk result before calling the PAD approved.
682
Ryan files 400 MW Southwest Crossing campusData Center Dynamics · published / observed 2025-01-22
Specialist trade reporting linked to municipal filingsreported secondarysupportingcurrent

Trade reporting based on the city documents describes a proposed 400 MW, up-to-1.25-million-square-foot campus and notes the January 15 Planning and Zoning recommendation. It is retained as a cross-check, not as the controlling entitlement source.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyUseful for reconciling the reported project identity and proposed capacity with the city packet. Current status, financial figures and future delivery remain subject to primary permits, utility records and signed approvals.
683
Data Center Tax Abatement Program · 2026 guideNevada Governor's Office of Economic Development · published / observed 2025-08-01
State incentive-program guidepublic recordrecordcurrent

Current program guide sets the 10- and 20-year capital, wage and Nevada-job thresholds and requires at least 50% Nevada-resident construction labor for eligible projects.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyControlling for the published program criteria. Eligibility conditions are not proof that a specific applicant complied, hired, began construction or received a final abatement.
684
GOED Biennial Report · FY2023–FY2024Nevada Governor's Office of Economic Development · published / observed 2025-01-01
Statutory state incentive reportpublic recordrecordcurrent

Audited program table lists approved Novva and Vantage abatements, counties, contracted capital, contracted jobs and average wage. Contract metrics are incentive obligations, not current openings.

Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · high accuracyHigh for the approved abatement fields in the report. Contracted jobs and capital must not be restated as realized payroll, current vacancies or completed investment.
685
Novva Holdings LLC · data-center abatement packetNevada Governor's Office of Economic Development · published / observed 2023-09-21
State board application packetpublic recordrecordcurrent

Application identifies 6115 N Nicco Way in North Las Vegas and records applicant schedule, facility, investment and job estimates considered by the state board.

Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracyHigh for the filed address and applicant statements; projected dates, jobs and capital are estimates. Use the biennial report for contracted program values and current owner material for operating status.
686
Las Vegas data-center facilityNovva Data Centers · published / observed 2026-08-28
Current owner facility portfoliofirst partydirectcurrent

Current owner page markets the North Las Vegas facility at 6115 Nicco Way as a 275,000-square-foot, 100 MW, 20-acre campus accepting reservations.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyDirect for the owner's current marketed facility facts and address. Availability language is commercial marketing and does not disclose occupancy, live IT load or current hiring.
687
Reno NV1 data-center campusVantage Data Centers · published / observed 2026-08-28
Current owner campus portfoliofirst partydirectcurrent

Current owner page identifies 1121 USA Parkway, four multi-story facilities, 224 MW and 1.1 million square feet; it still labels the first facility for Q2 2026 delivery.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyDirect for the owner's campus plan and address. A scheduled Q2 2026 delivery is not treated as completion without a later opening, certificate or operating disclosure.
688
SUP 2024-029 · 1121 USA ParkwayStorey County · published / observed 2024-07-16
County board minutes and land-use packetpublic recordrecordcurrent

Official county minutes record unanimous approval of the Vantage special-use permit for APN 005-041-95 after the planning packet described multiple four-story data-center buildings.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyControlling for the SUP disposition and site identity. A special-use permit does not itself establish building permits, mobilization, completion or operation.
689
Vantage invests nearly $3 billion in Nevada AI campusVantage Data Centers · published / observed 2025-07-15
Owner project announcementfirst partydirectcurrent

Owner announcement reports nearly $3 billion, more than 1,200 construction and operations roles, two leased buildings and a scheduled Q2 2026 first-building delivery.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for the owner's disclosed plan and then-current schedule. Aggregated jobs are a forecast, and the scheduled opening requires later confirmation.
690
SUP 2025-001, 2025-002 and 2025-003 · Storey County decisionsStorey County · published / observed 2025-02-18
County board minutes and land-use staff reportspublic recordrecordcurrent

County minutes approve separate multi-building data-center concepts at 2300 Peru Drive, 2200 Peru Drive and 9000 USA Parkway and explicitly state that an SUP is not a construction permit.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyControlling for the three SUP approvals, parcels and applicant entities. Building and fire review plus permits remain separate later gates; approval is not a field start.
691
PR TX 1 LLC / Fleet Data Centers · Storey County abatement packetNevada Governor's Office of Economic Development · published / observed 2025-11-01
State board application packetpublic recordrecordcurrent

State application describes Fleet's planned colocation project at 2300 Peru Drive with expected Q3 2027 operations. The packet entity name and later financing entity differ and are not silently collapsed.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for the filed address and applicant representations; qualified for legal-entity continuity and forecast timing. Confirm ownership and assignments through deeds, state filings and later permits.
692
Fleet closes $4.6 billion financing for Reno hyperscale facilityFleet Data Centers · published / observed 2026-05-01
Owner financing announcementfirst partydirectcurrent

First-party financing notice says proceeds fund development and construction of a 230 MW utility / 200 MW critical-IT facility and substation on a 517-acre Storey County property.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for the financing and disclosed Reno construction program. The announcement does not print the Peru Drive address; the address crosswalk depends on the GOED filing and remains qualified.
693
Fleet Data Centers · current Sparks openingsFleet Data Centers · published / observed 2026-08-28
Live employer ATS enumerationofficial job boarddirectdue soon

Official Greenhouse board exposed current Sparks construction, project-engineering, quality, security, commissioning and cost roles. Street-level assignments are withheld on most records.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for titles, live URLs and listed locations at observation time. A Sparks location is a regional demand signal unless the posting itself resolves a project code or worksite.
694
SV RNO Property Owner 1 LLC · data-center abatement packetNevada Governor's Office of Economic Development · published / observed 2026-01-01
State board application packetpublic recordrecordcurrent

Application describes a new colocation project at 9500 USA Parkway in McCarran with expected Q3 2027 operations.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for the filed entity, address and applicant statements. The schedule and job estimates are projections; a county tax-notice waiver is not a land-use or building permit.
695
GOED board minutes · Apple Reno Technology Park expansionNevada Governor's Office of Economic Development · published / observed 2024-07-25
State board adopted minutespublic recordrecordcurrent

Official minutes state Apple has operated at Reno Technology Park since December 2012, had more than 200 supporting team members, planned additional investment and received board approval for an abatement.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyHigh for statements entered in the board record and the approval. Forward investment and job figures are applicant projections, not current openings or completed expenditure.
696
Apple Careers · current Sparks data-center rolesApple · published / observed 2026-08-28
Live employer location searchofficial job boarddirectdue soon

Current official state search exposes exact-Sparks project-management and controls roles for Apple's data-center program.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for current Apple requisitions, role numbers, listed city and posting dates at observation time. Requisitions can close without notice and do not disclose a building or phase assignment.
697
Colovore Reno market · RNO01 and RNO02Colovore · published / observed 2026-08-28
Current owner market and facility portfoliofirst partydirectcurrent

Current owner page separates RNO01 in Sparks and RNO02 in Reno, each at 16 MW; RNO01 is sold out and RNO02 is preleasing for 2026–2027. The owner portfolio labels both under construction.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyDirect for owner-labeled identities, capacity and commercial status. Sold out and preleasing do not establish delivery, live load, permits or opening dates.
698
Colovore · current Reno operations openingsColovore · published / observed 2026-08-28
Live employer ATS enumerationofficial job boarddirectdue soon

Official Greenhouse board exposes two current Reno operations roles across night-shift and senior engineering coverage; a previously indexed swing-shift role is no longer on the live board and is excluded.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyHigh for titles, live URLs and Reno location at observation time. The board does not identify RNO01 versus RNO02, so roles remain market-level across the two sites.
699
Nevadaworks and EmployNV career hubsNevadaworks · published / observed 2026-08-28
Official local workforce-board service indexeducation workforcedirectcurrent

Current Northern Nevada workforce board route offers no-cost career planning, training, placement and employer services, with Reno, Sparks and Storey-area hub access.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyDirect for public workforce services and locations. It is a worker referral route, not proof of a project-specific cohort, employer commitment or placement guarantee.
700
Apprenticeship skills certificate · 2026–2027 catalogTruckee Meadows Community College · published / observed 2026-08-28
Official college catalogeducation workforcedirectcurrent

Current catalog lists qualifying Northern Nevada electrical, plumbers / pipefitters / HVAC, sheet-metal, carpenters, operating-engineers and other apprenticeship sponsors.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyDirect for cataloged apprenticeship credit and named sponsors. Admission is sponsor-controlled and no data-center employer placement or reserved project seat is implied.
701
Tahoe Reno · Citadel campusSwitch · published / observed 2026-08-28
Current owner campus portfolio and expansion updatefirst partydirectcurrent

Current owner page identifies the operating Citadel campus and presents a Q2 2025 multi-gigawatt expansion update. The ultimate gigawatt scale is an upon-completion plan, not commissioned capacity.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyDirect for the owner's active campus identity and continuing expansion. Marketing scale, cabinet density and ultimate power are not treated as delivered load, occupied space or current hiring.
702
Switch Tahoe Reno now openSwitch · published / observed 2017-02-15
Owner opening archivefirst partydirectcurrent

Historical owner announcement records the opening of Tahoe Reno 1 and describes the original 2,000-acre Citadel plan. Current campus disclosures supersede the historical ultimate-capacity figures.

Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracyDirect for the opening milestone and then-announced campus design. Historical designed capacity is not a current commissioned-load or occupied-space measure.
703
SUP 2024-007 · Citadel expansion parcelsStorey County · published / observed 2024-06-06
County land-use agenda packetpublic recordrecordcurrent

County packet tracks proposed Switch expansion at 1 Superloop Circle and 3800 Peru Drive across three assessor parcels. Gridwork uses it as a land-use record, not proof that every proposed building was permitted or delivered.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for the filed addresses, parcels and proposal. Confirm the final board disposition plus later building, fire and occupancy records before assigning individual expansion buildings a field status.
704
Storey County, Nevada data centersGoogle Data Centers · published / observed 2026-08-28
Current owner location portfoliofirst partydirectcurrent

Current owner page says the Storey County data center was built in 2021 and reports more than $6 billion invested across Google's Henderson and Storey County sites, not Storey County alone.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyDirect for operation, the 2021 milestone and owner-provided statewide investment aggregate. The combined Nevada figure is never allocated to this campus without a separate disclosure.
705
Storey County campus · current photo recordGoogle Data Centers · published / observed 2026-08-28
Owner-maintained annotated photo galleryfirst partydirectcurrent

Current owner captions identify two Storey County data centers, an active generator-yard build and land where construction was ready to begin on another data center.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyDirect for the owner-captioned two-building operating campus and depicted expansion activity. Image timing and the later status of the next building are not published, so no completion date is inferred.
706
Reno data-center campusEdgeCore Digital Infrastructure · published / observed 2026-08-28
Current owner campus portfoliofirst partydirectcurrent

Current owner page describes a 56-acre, three-building campus planned for 216 MW critical IT and nearly one million square feet with contracted near-term power.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyDirect for the current campus plan, design and owner relationship. Upon-completion area, MW and contracted power do not prove building delivery, energization, tenant occupancy or live load.
707
EdgeCore data-center topping-off noticeStorey County · published / observed 2025-09-18
County public-meeting and event noticepublic recordrecordcurrent

Official county public notice schedules EdgeCore's topping-off event at 3000 USA Parkway. It is a structural milestone, not a certificate, energization or opening record.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh for the named company, address and scheduled topping-off event. The notice does not identify which of three planned buildings, document event completion or establish fit-out and operating status.
708
PowerHouse RenoAmerican Real Estate Partners · published / observed 2026-08-28
Current owner property portfoliofirst partydirectcurrent

Current owner portfolio describes a 49-acre, three-building, 900,000-square-foot powered-shell campus being developed for 200 MW and still displays an April 2026 delivery schedule.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyDirect for the owner's development plan. The April 2026 power date is treated as an unconfirmed schedule because the page does not provide a later energization, building-completion or tenant-operation milestone.
709
E-600 Britain Drive · NV Energy easementStorey County · published / observed 2024-10-01
County easement agenda packetpublic recordrecordcurrent

County packet records a distribution and transmission easement for the AREP SOF III TRIC project at 600 Britain Drive. Utility planning is retained separately from construction and energization.

Reviewed 2026-08-28 · next 2026-10-27 · 60d cadence · qualified accuracyHigh for the legal entity, project address and easement action. An easement does not establish substation construction, delivered power, building permits, vertical work or campus opening.
710
Tahoe Reno data centerNovva Data Centers · published / observed 2026-08-28
Current owner facility portfoliofirst partydirectcurrent

Current owner page identifies 3399 Peru Drive, a 20-acre campus, 300,000 square feet, six 10 MW halls, 180,000 square feet of white floor and a 100 MW on-site substation.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyDirect for the address, current marketed facility, physical plan and operating-service claims. Substation rating is not the same as live IT load, customer occupancy or remaining available capacity.
711
Launch of Tahoe Reno data centerNovva Data Centers · published / observed 2025-07-08
Owner launch announcementfirst partydirectcurrent

Owner announcement calls Tahoe Reno its fourth completed facility and reports a 60 MW, six-hall launch with new capacity available in 2026.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyDirect for the owner's completion and launch claim. The 2026 availability statement is a commercial schedule and does not disclose tenant take-up, live load or current vacancies.
712
SUP 2025-022 · Redwood Materials data center and solar recordStorey County · published / observed 2025-04-03
County planning minutes and staff reportpublic recordrecordcurrent

Adopted Planning Commission minutes state that 875 Innovation Way was under development with an on-site data center and that construction permits had been issued for the data center and accessory solar field.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyHigh for the address, parcel, applicant campus relationship and permit issuance stated by county staff. The record does not publish data-center area, MW, permit numbers, builder, field progress, completion or operating date.
713
Peru Shelf Technology ParkTract · published / observed 2026-08-28
Current developer project portfoliofirst partydirectcurrent

Current owner portfolio lists the 686-acre, 810 MW Peru Shelf land-development program as owned and in development with construction power available and February 2027 site energization scheduled.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyDirect for the owner-controlled land program and current marketed scope. Capacity and February 2027 energization are development targets, not delivered utility service or tenant data-center load.
714
Peru Shelf horizontal development groundbreakingTract · published / observed 2024-04-30
Developer construction announcementfirst partydirectcurrent

Developer announcement records commencement of roads, wet utilities and switch-station preparation and names F&P Construction and Westex Geotechnical for initial work.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for Tract's horizontal-infrastructure start and named initial partners. It does not establish vertical customer buildings, tenant commitments, delivered power or current field progress two years later.
715
Peru Ridge Technology ParkTract · published / observed 2026-08-28
Current developer project portfolio and cross-source site reconciliationfirst partysupportingcurrent

Current owner page markets a 517-acre, 230 MW envelope contiguous to Peru Shelf with a graded 40-acre pad expandable beyond 100 acres. Its land and utility figures align with Fleet's separate 517-acre / 230 MW Reno disclosure, but the owner does not name Fleet.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyDirect for Tract's land envelope; qualified for the Fleet crosswalk because neither source explicitly names the other. Gridwork attaches this as a probable underlying land record and does not create a duplicate physical-campus count.
716
South Valley Technology ParkTract · published / observed 2026-08-28
Current developer project portfoliofirst partydirectcurrent

Current owner page lists 1,534 acres, seven parcels and 1,215 MW planned capacity with September 2027 site energization scheduled and construction power advertised for 2025.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyDirect for the owner-controlled site, parcel count and marketed plan. Scheduled construction power and energization are not independently verified utility-delivery or construction milestones.
717
Virginia Highlands Technology ParkTract · published / observed 2026-08-28
Current developer project portfoliofirst partydirectcurrent

Current owner portfolio lists an 8,590-acre, eleven-parcel Storey County land program with 2,500 MW planned capacity and industrial zoning.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for ownership marketing, acreage, parcel count and conceptual capacity. Industrial zoning and land ownership do not establish utility commitment, customer, sitework, building permits or construction.
718
Storey County 8,590-acre acquisitionTract · published / observed 2024-06-18
Developer acquisition announcementfirst partydirectcurrent

Developer announcement records the closed acquisition of industrial-zoned land between TRIC and Virginia City Highlands for future data-center and energy development.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · qualified accuracyDirect for the announced acquisition and intended use. A closed land acquisition is not a construction start, utility award, tenant commitment or operating project.
719
Sapphire Technology ParkTract · published / observed 2026-08-28
Current developer project portfoliofirst partydirectcurrent

Current owner page lists a 1,063-acre Lyon County / Silver Springs-area park with 700 MW under utility study, favorable zoning and a development agreement.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for the owner-marketed site and stated planning attributes. Capacity under utility study is not committed power, and a development agreement or favorable zoning does not prove sitework or a customer building.
720
F&P Construction · current Northern Nevada hiring intakeF&P Construction · published / observed 2026-08-28
Current employer careers and application pageofficial job boarddirectcurrent

Current contractor page advertises laborer, heavy-equipment operator, truck-driver, foreman, office-assistant and project-manager pathways in Northern Nevada without project or requisition IDs.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · qualified accuracyDirect for the employer's broad hiring intake at observation time. Because no requisition ID, posting date, worksite or Peru Shelf assignment is published, these are not normalized as exact project openings.
721
Henderson, Nevada data centerGoogle Data Centers · published / observed 2026-08-28
Current owner location portfoliofirst partydirectcurrent

Current owner page identifies an operating Henderson data center, records a 2019 groundbreaking and reports more than $6 billion invested across Henderson and Storey County combined.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyDirect for the owner-operated location and milestone. The statewide investment is never allocated to Henderson alone, and the page does not publish campus MW, street address or current staffing.
722
Jasmine Development Project Data Center · parcel 178-01-416-001Clark County Assessor · published / observed 2026-08-28
Clark County assessor parcel and improvement searchpublic recordrecordcurrent

Current parcel record identifies Jasmine Development LLC, 560 West Warm Springs Road, an approximately 59.95-acre computer-center property and original construction year 2020.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · high accuracyDirect for the parcel owner, address, assessor use, acreage and improvement record. Assessed values and construction year do not establish Google ownership, delivered IT load, building-by-building status or current expansion.
723
Henderson development areas · Google Data CenterCity of Henderson · published / observed 2025-05-01
Municipal economic-development story map and water-account cross-checkpublic recordrecordcurrent

The city's official development-area story identifies Google's Warm Springs Road project and states that the 64-acre site was acquired through Jasmine Development LLC.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyStrong public-sector crosswalk between Google and the assessor's Jasmine Development entity. The city's rounded 64 acres and assessor's approximately 59.95 acres use different boundaries or conventions and are not merged.
724
Henderson Data Center · HEN hazardous-materials registryClark County Local Emergency Planning Committee · published / observed 2025-06-30
County hazardous-materials emergency-response planpublic recordrecordcurrent

County emergency-response register lists Jasmine Development LLC's Henderson Data Center - HEN at 520 West Warm Springs Road. The assessor separately uses 560 West Warm Springs Road for the campus parcel.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · qualified accuracyDirect for the registered facility name and emergency-planning address at the plan date. The 520/560 address difference is preserved as a campus-address discrepancy rather than treated as two facilities.
725
Las Vegas · Core campusSwitch · published / observed 2026-08-28
Current owner campus portfoliofirst partydirectcurrent

Current owner page identifies the operating Core campus and markets up to 495 MW upon completion.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for the current campus identity and owner relationship. Upon-completion MW, density and availability are marketing plans, not commissioned capacity, occupied load or current vacancies.
726
Las Vegas 10 data center openingSwitch · published / observed 2017-06-15
Owner opening archive cross-dated to the original wire releasefirst partydirectcurrent

Historical owner announcement records the opening of Las Vegas 10, nearly 350,000 additional square feet and up to 40 MW, bringing the then-current Core campus above two million square feet and up to 315 MW.

Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracyDirect for the 2017 opening milestone and then-published campus scale. Historical capacity is not a current delivered-load measure, and the construction-worker figures are not current vacancies.
727
Workforce Connections and EmployNV Career HubsWorkforce Connections · published / observed 2026-08-28
Official local workforce-board and one-stop systemeducation workforcedirectcurrent

Current Southern Nevada local workforce board connects job seekers and employers to no-cost coaching, training resources, recruitment and work-based services through EmployNV hubs.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyDirect for current public services in Southern Nevada. It is not evidence of a Google or Switch hiring event, sponsored cohort, reserved seat or placement guarantee.
728
Las Vegas data centersFlexential · published / observed 2026-08-28
Current owner market portfoliofirst partydirectcurrent

Current owner portfolio distinguishes Downtown and North Las Vegas as two operating facilities and publishes 33,135 square feet / 1.37 MW for Downtown and 111,240 square feet / 9 MW for North.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for current facility identity, marketed footprint and UPS capacity. Published MW is available or design capacity, not utilized customer load, and the page does not disclose staffing or current construction.
729
Flexential facility address registerFlexential · published / observed 2023-12-31
Owner assurance-report facility schedulefirst partydirectcurrent

Owner-published assurance report places the Downtown facility at 302 Carson Avenue / 304 Carson Avenue suites and the North facility at 3330 East Lone Mountain Road.

Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracyStrong for audited-scope addresses at the report date. The two Downtown suite addresses are retained as one owner-marketed facility and the schedule does not establish current floor area, load, occupancy or expansion.
730
LAS1 · 7185 Pollock DriveDataBank · published / observed 2026-08-28
Current owner facility portfoliofirst partydirectcurrent

Current owner page identifies an operating and recently expanded edge / colocation facility at 7185 Pollock Drive with 57,364 IT square feet and 3.35 MW critical IT load.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for address, operating facility identity and current marketed specifications. Critical-load rating is not measured utilization, and 'recently expanded' does not resolve permit, certificate or completion dates.
731
DataBank completes LAS1 lease buy-backDataBank · published / observed 2024-04-01
Owner transaction and expansion announcementfirst partydirectcurrent

Owner announcement records acquisition of the LAS1 real estate after an expansion and publishes the then-current raised-floor and critical-load figures.

Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · qualified accuracyDirect for the 2024 property transaction and owner-declared expansion. The older 36,800 raised-square-foot / 3.55 MW figures conflict in definition and date with the current facility page, so they are not combined or presented as a trend.
732
Careers at DataBankDataBank · published / observed 2026-08-28
Current employer page + TalentReef state filterofficial job boarddirectdue soon

Current employer page links to DataBank's official TalentReef portal. Filtering the board to Nevada produced one current job, assigned to the verified LAS1 street address.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyDirect for the official route and the one-job Nevada result at observation time. The board changes quickly, so the count and status require daily refresh.
733
Data Center Technician 1 · LAS1DataBank · published / observed 2026-08-07
TalentReef / DataBank requisition detailofficial job boarddirectdue soon

Current requisition 11095308 lists 7185 Pollock Drive, $25.82–$27 per hour, day and night shifts, a high-school pathway, 0–4 years of experience and certification reimbursement.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyDirect for current role identity, exact LAS1 street address, posting date, pay, shifts, qualifications and benefits. Availability is time-sensitive and requires daily recheck.
734
Switch Core · Part 70 operating permitClark County Department of Environment and Sustainability · published / observed 2025-05-15
Clark County active Title V / Part 70 permit registerpublic recorddirectcurrent

County operating permit identifies six adjacent Switch data-center campuses, NAP 7 through NAP 12, at 7135 South Decatur Boulevard and inventories covered emergency-power and cooling equipment.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyDirect for the permitted stationary-source identity, address and six named campus components. Air-permit coverage does not establish live IT load, occupancy, available colocation capacity or every building in the broader Core program.
735
NV LAS NAP 14–16 · WS-23-0193 and TM-23-500055Clark County Board of County Commissioners · published / observed 2023-06-21
Clark County zoning agenda, minutes and tentative-map sweeppublic recordrecordcurrent

County agenda and final action cover waivers, design review and a one-lot tentative map for data-center warehouses on 51.5 acres north of Badura Avenue, east of Jones Boulevard and west of Lindell Road.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyDirect for the NAP 14–16 project name, approved land-use scope, acreage and boundaries. Entitlements do not establish full buildout, delivered capacity, certificate, occupancy or a building-by-building completion date.
736
Switch Limited source 18024 · technical support documentClark County Division of Air Quality · published / observed 2024-03-14
Clark County stationary-source public-participation file and technical-document reviewpublic recordrecordcurrent

County technical record identifies a data center at 5660 West Badura Avenue and a significant revision adding 21 emergency generators and 15 cooling towers at a new data center, for a resulting source inventory of 45 generators and 30 cooling towers.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · qualified accuracyDirect for the source address, data-center use and proposed equipment revision. The county air file does not label the source NAP 14–16, so the crosswalk to the same Badura/Jones development envelope remains qualified and equipment is not converted into IT MW.
737
Switch Limited source 18024 · November 2024 enforcement docketClark County Air Pollution Control Hearing Officer · published / observed 2024-11-21
County air-compliance and enforcement docket sweeppublic recordrecordcurrent

County enforcement docket describes a data-center operation at 5660 West Badura Avenue and a September 2024 compliance evaluation involving an unpermitted emergency fire pump.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyDirect for an operating data-center stationary source at the Badura address in 2024. It does not prove that every NAP 14–16 building was complete, occupied or carrying live IT load.
738
Switch NAP 17 & 18 · active dust-control permitClark County Department of Environment and Sustainability · published / observed 2026-04-02
Clark County active dust-control permit registerpublic recorddirectcurrent

County register lists active dust-control permit 56593-5 for Switch NAP 17 & 18 at Roy Horn Way and Jones Boulevard, covering 28.3 acres and naming Martin-Harris Construction as the permit company through April 4, 2027.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for an active earth-disturbance authorization, project label, acreage, location and named permit company. A dust permit does not prove vertical construction, building count, final design, completion or the legal relationship between this parcel and the Decatur operating source.
739
Switch NAP 17 & 18 · Maule / Jones tentative-map applicationClark County Comprehensive Planning · published / observed 2020-01-15
Clark County land-use application and parcel-number searchpublic recordrecordcurrent

Filed application names Switch, seven parcels and a NAP 17 & 18 map between Jones Boulevard and Torrey Pines Drive in the Maule / Badura area.

Reviewed 2026-08-28 · next 2027-08-28 · 365d cadence · high accuracyDirect for applicant identity, project label and filed parcels. The older application does not establish present construction status or supersede the current dust-control acreage.
740
Las Vegas Switch Campus NAP 17 & 18 · assessor map 176-02Clark County Assessor · published / observed 2025-08-21
County assessor parcel-map and subdivision-label sweeppublic recordrecordcurrent

Current assessor map labels the recorded Las Vegas Switch Campus NAP 17 & 18 subdivision and its parcel geometry.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyDirect for recorded parcel and subdivision continuity. An assessor map is not evidence of vertical construction, certificate, energization or operation.
741
LAS 19 · ZC-26-0260, WS-26-0261 and TM-26-500067Clark County Board of County Commissioners · published / observed 2026-06-17
Clark County zoning agenda, approved-minutes transcript and companion-item reviewpublic recordrecordcurrent

Approved minutes identify Switch's LAS 19 plan as a 56,000-square-foot data center on 8.99 acres east of Edmond Street and north of Warm Springs Road, served from the existing Audette substation.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for unanimous approval, project identity, site, area and applicant-presented design. Statements on water use, cooling and power route are applicant testimony, not measured operating results; approval still requires later aviation, development-agreement and permit steps.
742
South Decatur data center · UC-26-0105 and TM-26-500027Clark County Zoning Commission · published / observed 2026-04-08
Clark County zoning case, minutes and companion-item sweeppublic recordrecordcurrent

County approved the routine companion items for a 55.10-acre data center, electric substation, ancillary structures and one industrial lot south of Serene Avenue and east of Decatur Boulevard under I 15 Mountain LLC filings.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyDirect for approved land-use design and tentative-map scope. The filing does not establish a building permit, construction start, capacity, customer or the later-reported Armory marketing name.
743
9380 South Decatur Boulevard · parcel 177-19-301-005Clark County Assessor · published / observed 2026-08-28
County assessor address, parcel and owner sweeppublic recordrecordcurrent

Current assessor record lists Switch Ltd as owner of the 9380 South Decatur Boulevard parcel after a May 2026 multi-parcel transaction.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyDirect for current ownership and address of one parcel in the development envelope. It does not by itself establish Switch ownership of every filed acre, a construction award or a completed data center.
744
South Decatur · I 15 Mountain earthwork and demolition permitsClark County Division of Air Quality · published / observed 2026-04-02
Clark County active dust-control permit and exact-address sweeppublic recordrecordcurrent

Active register lists a 23.3-acre I 15 Mountain earthwork permit at Decatur and Richmar plus a separate 1.8-acre demolition permit at 9380 South Decatur / 4740 West Meranto.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for earth disturbance and demolition at the development area. The older broad permit predates the data-center approval and the demolition covers only 1.8 acres, so neither is treated as proof of full data-center sitework.
745
Switch Armory Campus · reported project profileData Center Map · published / observed 2026-08-26
Industry directory cross-check against county planning and assessor recordsreported secondarysupportingcurrent

Industry directory uses the Armory name and describes three planned buildings at 9380 South Decatur Boulevard. Gridwork retains the alias for discovery while county filings remain controlling.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracySupporting only for the reported Armory alias and three-building interpretation. County approvals, parcel ownership and permits control lifecycle state and scope.
746
Verizon Las Vegas Belmont source 18218 · technical support documentClark County Division of Air Quality · published / observed 2024-03-13
Clark County stationary-source public-participation file and technical-document reviewpublic recordrecordcurrent

County record classifies 2650 Belmont Street as a new Verizon Wireless mobile switching center with two 3,000 kW and one 500 kW emergency generators.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyDirect for facility type, owner, address and permitted-source equipment. A mobile switching center is digital infrastructure, but it is not represented as a commercial colocation or hyperscale data center and generator rating is not IT load.
747
Verizon Belmont construction · dust-control enforcement docketClark County Air Pollution Control Hearing Officer · published / observed 2024-11-21
County air-compliance and enforcement docket sweeppublic recordrecordcurrent

County docket names Civil Werx on dust-control permit 56727 for the Verizon Belmont Data Center construction project at 2650 Belmont Street and records a September 2024 inspection and violation.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · high accuracyDirect for Civil Werx's construction-site relationship and the September 2024 field record. It does not establish current contractor mobilization, completion, certificate or operating status.
748
2650 Belmont Street · parcel 139-13-713-002Clark County Assessor · published / observed 2026-08-28
County assessor exact-address and owner sweeppublic recordrecordcurrent

Current parcel record lists Cellco Partnership, doing business as Verizon Wireless, as owner of 2650 Belmont Street and carries current improvement value.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyDirect for parcel ownership, address and assessed improvements. Assessment data do not prove certificate, operating date, network role beyond the separate air permit or present headcount.
749
Verizon Wireless · MSC Belmont hazardous-materials registryClark County Local Emergency Planning Committee · published / observed 2026-06-30
County hazardous-materials emergency-response planpublic recordrecordcurrent

Current emergency-response register lists Verizon Wireless - MSC Belmont at 2650 Belmont Street.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · qualified accuracyDirect for current emergency-planning registration at the facility address. Registry presence supports continuity but is not a certificate of occupancy, current staffing count or proof that every system is in service.
750
Civil Werx · Las Vegas careersCivil Werx · published / observed 2026-08-28
Current contractor careers page and role-detail reviewofficial job boarddirectcurrent

Current contractor page lists five Las Vegas field roles, including heavy-equipment mechanic, finish-blade operator, button-up foreman, heavy-equipment operator and grading foreman.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · qualified accuracyDirect for the five broad Las Vegas hiring paths at observation time. Civil Werx's verified Verizon relationship is from a 2024 dust permit; none of the current roles names Belmont, so no opening is assigned to the project.
751
Verizon · current jobs searchVerizon · published / observed 2026-08-28
Current employer careers searchofficial job boarddirectcurrent

Official employer search route supports state, location, career-area and team filters. No exact Belmont mobile-switching-center role is normalized in this review.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · qualified accuracyDirect for the official route. Retail roles and generic Las Vegas matches are not reclassified as network-infrastructure or facility jobs, and the board requires frequent refresh.
752
Approved decision · Townsite Data CenterU.S. Bureau of Land Management · published / observed 2026-07-20
BLM decision announcement and NEPA register sweeppublic recordrecordcurrent

BLM states that it approved construction, operation and maintenance of a data center on 88.5 acres of public land near the existing Townsite Solar 1 project.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyDirect for the federal approval and acreage. Approval is not a construction start, power delivery, financing close or final resolution of Boulder City's appeal.
753
Townsite Data Center · DOI-BLM-NV-S010-2026-0080-DNAU.S. Bureau of Land Management · published / observed 2026-07-31
BLM National NEPA Register case-file searchpublic recordrecordcurrent

NEPA register identifies Townsite Solar 2 LLC, an 81-acre data-center site plus a four-acre linear-facilities segment and case file NVNV106360814.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · high accuracyDirect for applicant, case identifiers and federal-land scope. The 81 plus four acre register description and BLM's rounded 88.5-acre announcement are preserved as different source conventions rather than summed.
754
Boulder City appeal of Townsite federal approvalBoulder City · published / observed 2026-07-27
Municipal council action and project-status pagepublic recordrecordcurrent

Boulder City says its council unanimously appealed BLM's approval for the 80-acre federal parcel; Townsite's separate city-land application was withdrawn.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · high accuracyDirect for the city's appeal and separation of the withdrawn city parcel from the still-approved federal right-of-way. It does not by itself stay, revoke or uphold BLM's decision.
755
Townsite Data Center · project descriptionTownsite Solar 2 LLC · published / observed 2026-08-28
Current applicant project site cross-checked against federal and municipal recordsfirst partysupportingcurrent

Applicant site describes an air-cooled closed-loop design, up to 70 MW of battery storage, biodiesel backup generation and a planned 230 kV interconnection; its city-parcel narrative predates the move to adjacent federal land.

Reviewed 2026-08-28 · next 2026-09-11 · 14d cadence · qualified accuracyDirect for the applicant's proposed technical concept and team. Site language still centers the withdrawn city-owned parcel, so Gridwork does not transfer its acreage, investment or performance claims to the federal parcel without a controlling amendment.
756
isp.net · downtown Las Vegas colocation infrastructureisp.net · published / observed 2026-08-28
Current operator colocation and channel portfoliofirst partydirectcurrent

Current operator page says isp.net owns and operates redundant downtown Las Vegas data centers, carrier-grade connectivity, its middle- and last-mile network and BGP on AS27501.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for two operator-owned downtown facilities and current colocation service. The page does not publish street addresses, floor area, MW, utilization, generator inventory or a facility-by-facility opening date.
757
isp.net · current Las Vegas careersisp.net · published / observed 2026-08-28
Current employer careers page and role-detail routesofficial job boarddirectdue soon

Current employer page lists Field Technician, Network Engineer 1, Business Development Executive 1, Sales Development Representative, Customer Support 1 and Customer Support Supervisor openings.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · qualified accuracyDirect for six current employer-controlled role routes at observation time. The postings are Las Vegas employer demand, but none identifies 2595 Fremont or 1221 South Casino Center as the final worksite, so every facility relationship remains regional.
758
Field Technician · Las VegasISP Industries LLC / Gusto · published / observed 2026-08-28
Employer-linked Gusto board and requisition detailofficial job boarddirectdue soon

Current official requisition lists full-time Las Vegas field work at $18–$20 per hour across routers, switches, radios, fiber, coax, conduit, cabling, testing and field maintenance.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · high accuracyDirect for current title, city, employment type, pay and duties. It does not name either data center and includes wider customer-network field work, so it is not an exact-facility opening.
759
2595 Fremont Street · parcel 162-01-102-010Clark County Assessor · published / observed 2026-08-28
County assessor address and owner searchpublic recordrecordcurrent

Current assessor record identifies LV Net Investments LLC as owner of the 0.95-acre, office-classified parcel at 2595 Fremont Street in Sunrise Manor.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyDirect for parcel, address, assessed owner, acreage and assessor use. The office classification does not disprove embedded data-center use, and the assessor is not evidence of current IT load, occupancy or title beyond the displayed assessment record.
760
LasVegas.net · 2595 Fremont carrier-neutral data centerCogent Communications · published / observed 2026-08-28
Current carrier on-net and carrier-neutral facility registerfirst partysupportingcurrent

Current Cogent service-location register classifies LasVegas.net at 2595 Fremont Street as a carrier-neutral data center.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · high accuracyDirect for Cogent's current network classification and facility address. It confirms carrier-neutral data-center use but not ownership, capacity, utilization, staffing or every carrier present.
761
LV.Net Data Center 2 · 1221 South Casino Center openingLV.Net · published / observed 2015-10-28
Archived operator opening announcement cross-checked to current two-facility portfoliofirst partysupportingcurrent

Historical company release identifies Data Center 2 at 1221 South Casino Center Boulevard and describes four then-local colocation and hosting facilities.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · qualified accuracyDirect for the 2015 DC2 identity and address. The historical four-site claim is not treated as a current facility count; current operator language says two data centers, and the 1221 continuity remains qualified through current employer-address material.
762
Martin-Harris Construction · careersMartin-Harris Construction · published / observed 2026-08-28
Current employer careers page + linked Keldair boardofficial job boarddirectdue soon

Current employer page links to a Keldair board with seven Las Vegas openings. One is explicitly for CCSD / K–12 and is excluded from Switch context; the other six remain regional because none names Switch, Roy Horn Way, NAP 17 or NAP 18.

Reviewed 2026-08-28 · next 2026-08-29 · 1d cadence · qualified accuracyDirect for titles, requisition IDs, displayed Las Vegas location and posted month/day. Martin-Harris is permit-named for NAP 17–18, but that relationship does not prove any current role is assigned to the Switch project.
763
Inside Wireman and Installer Technician apprenticeshipsElectrical Training Institute of Southern Nevada · published / observed 2026-08-28
Official apprenticeship program page + Nevada registered-program rostereducation workforcedirectcurrent

Current program page describes an 8,000-hour Inside Wireman apprenticeship and 6,000-hour Installer Technician pathway covering electrical, voice, data, fire-alarm, security and cabling work.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for program scope, minimum qualifications and training hours. The page does not publish a current application window, available seats, employer assignment or a Switch placement agreement.
764
Computing, networking and electrical-power pathwaysCollege of Southern Nevada · published / observed 2026-08-28
Current college program register + CIT department degree sheetseducation workforcedirectcurrent

Current CSN program register includes Network Electronics, Utilities Engineering with an Electrical Power concentration, electronics, networking degrees and stackable certification preparation.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyDirect for current academic pathways and published duration or credit ranges. These are adjacent preparation routes, not data-center-specific cohorts, guaranteed certification outcomes or employer placement agreements.
765
Registered hosting centersNevada Gaming Control Board · published / observed 2026-08-28
Nevada Gaming Control Board hosting-center registerpublic recordrecordcurrent

Current state register lists eleven Switch addresses across Las Vegas and Tahoe Reno plus Flexential North and DataBank LAS1 as registered hosting centers.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyHigh confidence for current registration and listed addresses. Registration is not a complete data-center inventory, proof of ownership for every suite, delivered-load evidence or a construction milestone; unregistered enterprise and general colocation sites can still exist.
766
Fiberhub LAS1 · Las VegasFiberhub / VegasNAP · published / observed 2026-08-28
Current operator facility portfoliofirst partydirectcurrent

Current operator page identifies an operating carrier-neutral Tier-III facility at 1110 Palms Airport Drive, Suite 110 with 24/7 on-site engineering.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for current operator identity, address, services and support model. Tier language is owner-published, and the page does not disclose gross area, IT MW, utilization, staffing count or current construction.
767
Fiberhub company and LAS1 timelineFiberhub / VegasNAP · published / observed 2026-08-28
Current operator historyfirst partysupportingcurrent

Current company history records LAS1 opening in May 2010 and later power and cooling upgrades through 2019.

Reviewed 2026-08-28 · next 2027-02-24 · 180d cadence · qualified accuracyUseful owner chronology, not an independent permit or certificate trail. Upgrade statements do not provide cost, MW, permit number, exact completion date or proof of current spare capacity.
768
LAS01 · Las Vegas market overviewEdgeConneX · published / observed 2025-10-28
Current operator facility data sheetfirst partydirectcurrent

Current operator data sheet identifies LAS01 at 1541 Pama Lane with a 24,400-square-foot facility, 3,600 square feet of raised floor and 750 kW N+1 power.

Reviewed 2026-08-28 · next 2026-11-26 · 90d cadence · qualified accuracyDirect for the operator-marketed facility and published configuration. The sheet does not disclose utilized load, current staffing, original certificate, customer occupancy or later expansion.
769
Cogent Edge Data Center · Las VegasCogent Communications · published / observed 2026-08-28
Current operator network and data-center location registerfirst partydirectcurrent

Current network service-location register identifies a Cogent-operated edge data center at 7941 Giles Street, distinct from Cogent points of presence inside other Las Vegas operators.

Reviewed 2026-08-28 · next 2026-09-27 · 30d cadence · qualified accuracyDirect for the operator label and address at observation time. The service register does not publish facility area, IT MW, redundancy, staffing or certificate dates, and carrier-neutral points of presence are not counted as separate buildings.
770
Careers at CogentCogent Communications · published / observed 2026-08-28
Current employer careers listofficial job boarddirectcurrent

Current employer page lists active roles across sales, support, field services, IT, network engineering and real estate; no reviewed opening names the Giles Street edge facility.

Reviewed 2026-08-28 · next 2026-09-04 · 7d cadence · qualified accuracyDirect for listed employer openings at observation time. Roles are not assigned to Las Vegas or the edge facility unless the posting itself names that market and worksite.